Back to bathroom remodel contractors
Damar Construction And Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Jun 2026
- Last 24 months
- 10 permits filed
98 permits since 2000: 81 completed, 4 in progress, 10 never finaled, 3 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 28 completed, 1 in progress, 1 never finaled. Typically 10 days from filing to permit and 290 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2025 | In progress issued Jan 2026 | 620 02nd Av | interior revision & remodel to permit#202011249635: 1st fl-add office niche, revised stair plan; 2nd fl-kitchen, pantry, powder room remodel, 3rd fl-(n) bathroom. remodel will result in 3 bedrooms, 3.5 bathrooms. exterior remodel:(n) garage door, (n) front & rear stair, (n) rear deck.Details
interior revision & remodel to permit#202011249635: 1st fl-add office niche, revised stair plan; 2nd fl-kitchen, pantry, powder room remodel, 3rd fl-(n) bathroom. remodel will result in 3 bedrooms, 3.5 bathrooms. exterior remodel:(n) garage door, (n) front & rear stair, (n) rear deck. | |
| Jun 13, 2024 | Completed final sign-off Jan 2025 | 2618 Buchanan St | in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). | $12,000 |
| Apr 29, 2024 | Completed final sign-off Feb 2025 | 2432 Washington St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $20,000 |
| Nov 8, 2022 | Completed final sign-off Oct 2026 | 125 Santa Paula Av | horizontal addition to 1st fl(86 gsf)to add additional living space,addition to the 2nd fl(221 gsf)to add 4th bedroom & 3rd bathroom,vertical addition(394 gsf)adding an attic level to rear of house.attic space will house a bonus room under a proposed sloping cathedral ceiling/gable roof.Details
horizontal addition to 1st fl(86 gsf)to add additional living space,addition to the 2nd fl(221 gsf)to add 4th bedroom & 3rd bathroom,vertical addition(394 gsf)adding an attic level to rear of house.attic space will house a bonus room under a proposed sloping cathedral ceiling/gable roof. | $350,000 |
| Jun 15, 2022 | Completed final sign-off Oct 2024 | 2440 Washington St | relocate (e) bathroom on 2nd fl and renovate bedroom.Details
relocate (e) bathroom on 2nd fl and renovate bedroom. | $20,000 |
| Apr 22, 2022 | Completed final sign-off Feb 2025 | 2432 Washington St | replace (e) brick foundations and excavate to create (n) mudroom, guestroom & bathroom. construct (n) stair to 1st level. reconstruct (e) wood entry stair. (e) conc stair to remain.Details
replace (e) brick foundations and excavate to create (n) mudroom, guestroom & bathroom. construct (n) stair to 1st level. reconstruct (e) wood entry stair. (e) conc stair to remain. | $225,000 |
| Feb 28, 2022 | Completed final sign-off Aug 2025 | 7 Winfield St | interior remodel of main (2nd) fl - inclding new kitchen, 1/2 bath, new windows & doors on non-street facing. vertical addition of a 3rd fl with additional bedrm, bathrm, office/guest space, & roof deck.Details
interior remodel of main (2nd) fl - inclding new kitchen, 1/2 bath, new windows & doors on non-street facing. vertical addition of a 3rd fl with additional bedrm, bathrm, office/guest space, & roof deck. | $437,000 |
| Mar 4, 2021 | Completed final sign-off Sep 2021 | 3384 Sacramento St | install recessed lighting and controls in retail space, bathroom, and back of house. deferred submittal for pa# 202010066008.Details
install recessed lighting and controls in retail space, bathroom, and back of house. deferred submittal for pa# 202010066008. | $7,000 |
| Nov 24, 2020 | Never finaled issued Apr 2021, no final | 620 02nd Av | construct new family room, guest room, laundry and bathroom. renovate (e) kitchen and add bathroom on level 3. rebuild (e) stair connecting level 1 & 2, (n) skylight and windows at rear.Details
construct new family room, guest room, laundry and bathroom. renovate (e) kitchen and add bathroom on level 3. rebuild (e) stair connecting level 1 & 2, (n) skylight and windows at rear. | $250,000 |
| Nov 2, 2018 | Completed final sign-off Dec 2019 | 1928 Fell St | interior remodel for kitchen and bathroom and laundry. 3 new fixtures, no structural changes. few partitions to be removedDetails
interior remodel for kitchen and bathroom and laundry. 3 new fixtures, no structural changes. few partitions to be removed | $50,000 |
| Jun 7, 2018 | Completed final sign-off Jun 2019 | 2547 18th Av | new stair between 1st and 2nd levels. renovate e bath at 2nd level, new bath 1st lvel new laundy and family rm 1st level skylight at lightwellDetails
new stair between 1st and 2nd levels. renovate e bath at 2nd level, new bath 1st lvel new laundy and family rm 1st level skylight at lightwell | $90,000 |
| Sep 12, 2017 | Completed final sign-off Jul 2018 | 231 Upper Tr | reconfigure bath & closet on 2rd fl. reconfigure kitchen & (n) half bath on 1nd fl. reconfigure laundry & bath at basement.Details
reconfigure bath & closet on 2rd fl. reconfigure kitchen & (n) half bath on 1nd fl. reconfigure laundry & bath at basement. | $115,000 |
| Apr 10, 2017 | Completed final sign-off Jan 2020 | 1930 Rivera St | interior remodel of both the street & second flr. new windows and doors at rear & west facade. there are no vertical additions. and no change to the street facade. (e) lightwells to be infilled. the residence will consist of the bedrooms and two half bathrooms. four new skylight to be installedDetails
interior remodel of both the street & second flr. new windows and doors at rear & west facade. there are no vertical additions. and no change to the street facade. (e) lightwells to be infilled. the residence will consist of the bedrooms and two half bathrooms. four new skylight to be installed | $200,000 |
| Dec 16, 2016 | Completed final sign-off Mar 2018 | 47 Atalaya Tr | (n) addition @ rear 3rd fl. (n) bath @ 3rd fl. (n) windows @ side & rear only.Details
(n) addition @ rear 3rd fl. (n) bath @ 3rd fl. (n) windows @ side & rear only. | $37,500 |
| Sep 21, 2016 | Completed final sign-off Feb 2017 | 774 30th Av | renovate extg bath and closet at 3rd level. in fill extg lightwell at 3rd level. not visibleDetails
renovate extg bath and closet at 3rd level. in fill extg lightwell at 3rd level. not visible | $18,000 |
| Jul 1, 2016 | Completed final sign-off May 2022 | 71 Bronte St | vertical addition adding a partial 2nd flr (542 sf) over rear portion of (e) 1st flr footprint, set back 15'-10" from front facade. the 2nd fl will be accessed by a new interior staircase & will include 2 bedrooms, a walk-in closet/storage room, a bathroom, & hallwayDetails
vertical addition adding a partial 2nd flr (542 sf) over rear portion of (e) 1st flr footprint, set back 15'-10" from front facade. the 2nd fl will be accessed by a new interior staircase & will include 2 bedrooms, a walk-in closet/storage room, a bathroom, & hallway | $225,000 |
| Jun 5, 2015 | Completed final sign-off Nov 2015 | 160 Fillmore St | renovate existing bathroom and bedroom. non structural work.Details
renovate existing bathroom and bedroom. non structural work. | $46,305 |
| Apr 17, 2015 | Completed final sign-off Oct 2015 | 3965 Cesar Chavez St | remodel (e) master bathroom. interior enlarge (e) closet and install new closet door. remove (e) closet and relocate (e) stair door. install new bathroom window in (e) lightwell.Details
remodel (e) master bathroom. interior enlarge (e) closet and install new closet door. remove (e) closet and relocate (e) stair door. install new bathroom window in (e) lightwell. | $40,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 3963 Cesar Chavez St | renovate e kitchen, bath, closets and extg 1/2 bath at 2nd level. replacement windows at rear and lightwells. n/a maher ordinanceDetails
renovate e kitchen, bath, closets and extg 1/2 bath at 2nd level. replacement windows at rear and lightwells. n/a maher ordinance | $75,000 |
| Oct 30, 2014 | Completed final sign-off Feb 2016 | 278 02nd Av | renovate e 1st level to create new family room, bedroom, and 2 bathsDetails
renovate e 1st level to create new family room, bedroom, and 2 baths | $106,000 |
| Oct 2, 2014 | Completed final sign-off Mar 2016 | 278 02nd Av | renovate (e) 2nd level kitchen, change full bath to 1/2 bath. construct new 3rd level at attic including 3 bedrooms, 2 baths, laundry room. new interior stair from (e) 2nd level to new 3rd level. new rear deck & stair. new roof dormers & skylights. ** maher: n/a **Details
renovate (e) 2nd level kitchen, change full bath to 1/2 bath. construct new 3rd level at attic including 3 bedrooms, 2 baths, laundry room. new interior stair from (e) 2nd level to new 3rd level. new rear deck & stair. new roof dormers & skylights. ** maher: n/a ** | $170,000 |
| Sep 25, 2014 | Completed final sign-off Aug 2015 | 561 04th Av | remoedel 1st flr. add media room, one bathroom, laundry room, mudroom and one storage room. 2nd floor - remodel kitchen and bathroom. 3rd floor - renovate (e) bathroom, add a new bathroom and closets. reconstruct (e) front stair in kind, new windows/doors at rear.Details
remoedel 1st flr. add media room, one bathroom, laundry room, mudroom and one storage room. 2nd floor - remodel kitchen and bathroom. 3rd floor - renovate (e) bathroom, add a new bathroom and closets. reconstruct (e) front stair in kind, new windows/doors at rear. | $140,000 |
| Aug 4, 2014 | Completed final sign-off Feb 2015 | 1860 Jackson St | units 402 & 501 - to comply with nov 201484501- kitchen and bathrooms remodel in each unit ; to comply with cec150.0(k)3 & 5Details
units 402 & 501 - to comply with nov 201484501- kitchen and bathrooms remodel in each unit ; to comply with cec150.0(k)3 & 5 | $10,000 |
| Mar 14, 2014 | Completed final sign-off Sep 2014 | 1423 16th Av | new bedroom, bath, exercise room & laundry room at 1st level. remodel (e) kitchen, infill lightwell & new skylight at 2nd level.Details
new bedroom, bath, exercise room & laundry room at 1st level. remodel (e) kitchen, infill lightwell & new skylight at 2nd level. | $72,000 |
| Mar 5, 2014 | Completed final sign-off Jan 2015 | 230 Prentiss St | new habitable space(family rm,bathrm, hall, laudnry) at extg 1st level. new internal stairs between levels. remodel extg kitchen and bath at 2nd level. new french doors and exterior stairs to rear yard. new skylight.Details
new habitable space(family rm,bathrm, hall, laudnry) at extg 1st level. new internal stairs between levels. remodel extg kitchen and bath at 2nd level. new french doors and exterior stairs to rear yard. new skylight. | $85,000 |
| May 21, 2013 | Completed final sign-off Dec 2013 | 2547 18th Av | renovate (e) kitchen & master bath & (n) closets at 2nd floor; reconfigure (e) internal patio at 2nd floor; replacement windows at rear & side elevations; new skylight.Details
renovate (e) kitchen & master bath & (n) closets at 2nd floor; reconfigure (e) internal patio at 2nd floor; replacement windows at rear & side elevations; new skylight. | $80,000 |
| Mar 13, 2013 | Completed final sign-off Aug 2013 | 636 Diamond St | replace windows and roof at rear of building. new bath and closets at 3rd levelDetails
replace windows and roof at rear of building. new bath and closets at 3rd level | $40,000 |
| Sep 14, 2012 | Completed final sign-off May 2013 | 3965 Cesar Chavez St | new exterior stair from second level to rear yard. new french doors at rear facade. new guess-room, bath, multi-purpose room, andlaundry area at first level.Details
new exterior stair from second level to rear yard. new french doors at rear facade. new guess-room, bath, multi-purpose room, andlaundry area at first level. | $40,000 |
| Feb 15, 2012 | Completed final sign-off Dec 2012 | 585 Mangels Av | new master bedroom, bathroom and new laundry closet at 1st level. new stairs between 1st and 2nd levels.renovated bathroom and closets at 2nd level.new windows at 1st level rear elevation and new skylight. new concrete slab and front wall footing at 1st level.Details
new master bedroom, bathroom and new laundry closet at 1st level. new stairs between 1st and 2nd levels.renovated bathroom and closets at 2nd level.new windows at 1st level rear elevation and new skylight. new concrete slab and front wall footing at 1st level. | $95,000 |
| May 18, 2011 | Completed final sign-off Mar 2012 | 2139 15th Av | in unfinished garage: add master bedroom and bath,add guest bedroom and bath, new water heater and furnace, add deck.Details
in unfinished garage: add master bedroom and bath,add guest bedroom and bath, new water heater and furnace, add deck. | $80,000 |