98 permits since 2000: 81 completed, 4 in progress, 10 never finaled, 3 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 14 completed, 1 in progress, 3 never finaled. Typically 8 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2025 | In progress issued Jan 2026 | 620 02nd Av | interior revision & remodel to permit#202011249635: 1st fl-add office niche, revised stair plan; 2nd fl-kitchen, pantry, powder room remodel, 3rd fl-(n) bathroom. remodel will result in 3 bedrooms, 3.5 bathrooms. exterior remodel:(n) garage door, (n) front & rear stair, (n) rear deck.Details
interior revision & remodel to permit#202011249635: 1st fl-add office niche, revised stair plan; 2nd fl-kitchen, pantry, powder room remodel, 3rd fl-(n) bathroom. remodel will result in 3 bedrooms, 3.5 bathrooms. exterior remodel:(n) garage door, (n) front & rear stair, (n) rear deck. | |
| Feb 28, 2022 | Completed final sign-off Aug 2025 | 7 Winfield St | interior remodel of main (2nd) fl - inclding new kitchen, 1/2 bath, new windows & doors on non-street facing. vertical addition of a 3rd fl with additional bedrm, bathrm, office/guest space, & roof deck.Details
interior remodel of main (2nd) fl - inclding new kitchen, 1/2 bath, new windows & doors on non-street facing. vertical addition of a 3rd fl with additional bedrm, bathrm, office/guest space, & roof deck. | $437,000 |
| Nov 24, 2020 | Never finaled issued Apr 2021, no final | 620 02nd Av | construct new family room, guest room, laundry and bathroom. renovate (e) kitchen and add bathroom on level 3. rebuild (e) stair connecting level 1 & 2, (n) skylight and windows at rear.Details
construct new family room, guest room, laundry and bathroom. renovate (e) kitchen and add bathroom on level 3. rebuild (e) stair connecting level 1 & 2, (n) skylight and windows at rear. | $250,000 |
| Oct 6, 2020 | Completed final sign-off Sep 2021 | 3384 Sacramento St | t/i:new non-formula retail, new non-structural partitions, remodel emplyee only kitchenette, minor accessibility upgrades per d.a. checklest. electrical/mechanical and sprinkler work under sep permit.Details
t/i:new non-formula retail, new non-structural partitions, remodel emplyee only kitchenette, minor accessibility upgrades per d.a. checklest. electrical/mechanical and sprinkler work under sep permit. | $60,000 |
| Jun 4, 2019 | Completed final sign-off Oct 2019 | 2440 Washington St | remove brick chimney & 2 w.b fireplaces, 2 new gas fireplace appliances. reconfigure closets for new wine storage & new wine cooling unit. replace kitchen counters & backsplash, new kitchen outlets, new sinks in (e) locationsDetails
remove brick chimney & 2 w.b fireplaces, 2 new gas fireplace appliances. reconfigure closets for new wine storage & new wine cooling unit. replace kitchen counters & backsplash, new kitchen outlets, new sinks in (e) locations | $5,000 |
| Nov 2, 2018 | Completed final sign-off Dec 2019 | 1928 Fell St | interior remodel for kitchen and bathroom and laundry. 3 new fixtures, no structural changes. few partitions to be removedDetails
interior remodel for kitchen and bathroom and laundry. 3 new fixtures, no structural changes. few partitions to be removed | $50,000 |
| Sep 12, 2017 | Completed final sign-off Jul 2018 | 231 Upper Tr | reconfigure bath & closet on 2rd fl. reconfigure kitchen & (n) half bath on 1nd fl. reconfigure laundry & bath at basement.Details
reconfigure bath & closet on 2rd fl. reconfigure kitchen & (n) half bath on 1nd fl. reconfigure laundry & bath at basement. | $115,000 |
| Oct 6, 2015 | Never finaled issued Dec 2016, no final | 4 Mars St | horizontal addition in rear yard of (e) single family residence. provide plumbing, electric & hvac as req'd. enlarge (e) kitchen.Details
horizontal addition in rear yard of (e) single family residence. provide plumbing, electric & hvac as req'd. enlarge (e) kitchen. | $140,000 |
| Aug 12, 2015 | Never finaled issued Aug 2015, no final | 165 Lower Tr | replace (e) kitchen cabinets and countertops. re-use (e) appliances. new sink same location.Details
replace (e) kitchen cabinets and countertops. re-use (e) appliances. new sink same location. | $25,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 3963 Cesar Chavez St | renovate e kitchen, bath, closets and extg 1/2 bath at 2nd level. replacement windows at rear and lightwells. n/a maher ordinanceDetails
renovate e kitchen, bath, closets and extg 1/2 bath at 2nd level. replacement windows at rear and lightwells. n/a maher ordinance | $75,000 |
| Oct 2, 2014 | Completed final sign-off Mar 2016 | 278 02nd Av | renovate (e) 2nd level kitchen, change full bath to 1/2 bath. construct new 3rd level at attic including 3 bedrooms, 2 baths, laundry room. new interior stair from (e) 2nd level to new 3rd level. new rear deck & stair. new roof dormers & skylights. ** maher: n/a **Details
renovate (e) 2nd level kitchen, change full bath to 1/2 bath. construct new 3rd level at attic including 3 bedrooms, 2 baths, laundry room. new interior stair from (e) 2nd level to new 3rd level. new rear deck & stair. new roof dormers & skylights. ** maher: n/a ** | $170,000 |
| Sep 25, 2014 | Completed final sign-off Aug 2015 | 561 04th Av | remoedel 1st flr. add media room, one bathroom, laundry room, mudroom and one storage room. 2nd floor - remodel kitchen and bathroom. 3rd floor - renovate (e) bathroom, add a new bathroom and closets. reconstruct (e) front stair in kind, new windows/doors at rear.Details
remoedel 1st flr. add media room, one bathroom, laundry room, mudroom and one storage room. 2nd floor - remodel kitchen and bathroom. 3rd floor - renovate (e) bathroom, add a new bathroom and closets. reconstruct (e) front stair in kind, new windows/doors at rear. | $140,000 |
| Aug 4, 2014 | Completed final sign-off Feb 2015 | 1860 Jackson St | units 402 & 501 - to comply with nov 201484501- kitchen and bathrooms remodel in each unit ; to comply with cec150.0(k)3 & 5Details
units 402 & 501 - to comply with nov 201484501- kitchen and bathrooms remodel in each unit ; to comply with cec150.0(k)3 & 5 | $10,000 |
| Mar 14, 2014 | Completed final sign-off Sep 2014 | 1423 16th Av | new bedroom, bath, exercise room & laundry room at 1st level. remodel (e) kitchen, infill lightwell & new skylight at 2nd level.Details
new bedroom, bath, exercise room & laundry room at 1st level. remodel (e) kitchen, infill lightwell & new skylight at 2nd level. | $72,000 |
| Mar 5, 2014 | Completed final sign-off Jan 2015 | 230 Prentiss St | new habitable space(family rm,bathrm, hall, laudnry) at extg 1st level. new internal stairs between levels. remodel extg kitchen and bath at 2nd level. new french doors and exterior stairs to rear yard. new skylight.Details
new habitable space(family rm,bathrm, hall, laudnry) at extg 1st level. new internal stairs between levels. remodel extg kitchen and bath at 2nd level. new french doors and exterior stairs to rear yard. new skylight. | $85,000 |
| Oct 25, 2013 | Completed final sign-off Feb 2014 | 136 Prentiss St | remodel kitchen add 1 skylightDetails
remodel kitchen add 1 skylight | $30,000 |
| May 21, 2013 | Completed final sign-off Dec 2013 | 2547 18th Av | renovate (e) kitchen & master bath & (n) closets at 2nd floor; reconfigure (e) internal patio at 2nd floor; replacement windows at rear & side elevations; new skylight.Details
renovate (e) kitchen & master bath & (n) closets at 2nd floor; reconfigure (e) internal patio at 2nd floor; replacement windows at rear & side elevations; new skylight. | $80,000 |
| Jul 13, 2011 | Completed final sign-off Mar 2012 | 2139 15th Av | revision to 201105186298. remodel e kitchen. remove and relocate 2 windows (max u value=0.4). move stove, dishwasher, sinkDetails
revision to 201105186298. remodel e kitchen. remove and relocate 2 windows (max u value=0.4). move stove, dishwasher, sink | $20,000 |