Back to bathroom remodel contractors
D & K Construction &Painting Company Inc
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2002 to Oct 2026
- Last 24 months
- 10 permits filed
56 permits since 2000: 49 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 10 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 400 Beale St | bathroom remodel from tub into a shower. permits for plumbing and electrical to be pull by subs.Details
bathroom remodel from tub into a shower. permits for plumbing and electrical to be pull by subs. | $24,500 |
| Apr 30, 2026 | Completed final sign-off Aug 2026 | 605 Post St | revision to bpa#202602276712. relocate ada bathroom reconfiguration, relocate toter storage.Details
revision to bpa#202602276712. relocate ada bathroom reconfiguration, relocate toter storage. | |
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 605 Post St | convert 2 (e) bathrooms into 1 accessible bathroom. (n) closet for toters , (n) power door operationDetails
convert 2 (e) bathrooms into 1 accessible bathroom. (n) closet for toters , (n) power door operation | $35,000 |
| Feb 6, 2026 | Completed final sign-off Apr 2026 | 400 Beale St | unit #905: bathroom remodel & interior painting.Details
unit #905: bathroom remodel & interior painting. | $39,525 |
| Oct 27, 2025 | Completed final sign-off May 2026 | 619 Post St | remodel e) facial room and mezzanine floor. construct (n) bathroom ground/f. construct (n) add shower at ground/f. construct (n) storage at mezzanine. construct 2 new facial rooms at g/f.Details
remodel e) facial room and mezzanine floor. construct (n) bathroom ground/f. construct (n) add shower at ground/f. construct (n) storage at mezzanine. construct 2 new facial rooms at g/f. | $70,000 |
| Jul 24, 2025 | Completed final sign-off Nov 2025 | 561 Baker St | unit #8: prime and paint metal hand rails, replace light fixture in master bathroom. common areas: repair stair steps in-kind,(less thatn 50%) this is the interior stair to the appartmentDetails
unit #8: prime and paint metal hand rails, replace light fixture in master bathroom. common areas: repair stair steps in-kind,(less thatn 50%) this is the interior stair to the appartment | $5,500 |
| Jun 10, 2024 | Completed final sign-off Jul 2024 | 400 Beale St | 1 full bathroom remodel. in-kindDetails
1 full bathroom remodel. in-kind | $18,385 |
| Oct 23, 2023 | Completed final sign-off Mar 2024 | 2211 Fillmore St | #1: comply with nov# 202312330 item #2: open a hole at ceiling in the bathroom for future exhaust fan install a roof jack for exhaust pipe to be connectedDetails
#1: comply with nov# 202312330 item #2: open a hole at ceiling in the bathroom for future exhaust fan install a roof jack for exhaust pipe to be connected | $3,000 |
| Sep 18, 2023 | Completed final sign-off Nov 2023 | 1622 45th Av | kitchen: partial demolition and installtion of new kitchen cabinets bathroom: cabintry and tiles. kitchen and bathroom remodel in-kindDetails
kitchen: partial demolition and installtion of new kitchen cabinets bathroom: cabintry and tiles. kitchen and bathroom remodel in-kind | $38,400 |
| Apr 8, 2015 | Never finaled issued Apr 2015, no final | 10 Miller Pl | remove existing tile & install new tile @ bathroom only #801 .Details
remove existing tile & install new tile @ bathroom only #801 . | $5,000 |
| Feb 7, 2014 | Completed final sign-off May 2014 | 1835 Franklin St | remove all tiles, install new tiles, (one bath) tiles only, repl kitchen cabinets and counters only, no change to appliances and fixtures; compliance with ord 155-13 not requiredDetails
remove all tiles, install new tiles, (one bath) tiles only, repl kitchen cabinets and counters only, no change to appliances and fixtures; compliance with ord 155-13 not required | $4,500 |
| Jul 25, 2006 | Completed final sign-off Nov 2006 | 2000 Washington St | remodel of manager's unit & switch location of bathroom/closet & kitchenDetails
remodel of manager's unit & switch location of bathroom/closet & kitchen | $60,000 |