Block 1184, lot 001
561 Baker St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 12
- Rooms
- 11 bathrooms
- Building
- 7,980 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 24, 2025 | Completed final sign-off Nov 2025 | 561 Baker St | D & K Construction &Painting Company Inc | unit #8: prime and paint metal hand rails, replace light fixture in master bathroom. common areas: repair stair steps in-kind,(less thatn 50%) this is the interior stair to the appartmentDetails
unit #8: prime and paint metal hand rails, replace light fixture in master bathroom. common areas: repair stair steps in-kind,(less thatn 50%) this is the interior stair to the appartment | $5,500 |
| Jun 18, 2025 | Completed final sign-off Oct 2025 | 561 Baker St | D & K Construction &Painting Company Inc | in unit #8 4th floor address notice of violation complaint #202532710 item #2: partially open wall to confirm that the exhaust ventilation pipes are sealed. if not reattach & recap patch wall after verifying.Details
in unit #8 4th floor address notice of violation complaint #202532710 item #2: partially open wall to confirm that the exhaust ventilation pipes are sealed. if not reattach & recap patch wall after verifying. | $3,500 |
| Apr 14, 2025 | Completed final sign-off Nov 2025 | 561 Baker St | Pineda Construction Inc | remove drywall and install new drywall in laundry room only. nov #202429707 and #202429709Details
remove drywall and install new drywall in laundry room only. nov #202429707 and #202429709 | $2,500 |
| Nov 14, 2023 | Completed final sign-off Feb 2026 | 561 Baker St | Pineda Construction Inc | repair back stair and comply w/ nov #201981271-repair fire escape. (repair 20 % of the stairs dryrot only in-kind)Details
repair back stair and comply w/ nov #201981271-repair fire escape. (repair 20 % of the stairs dryrot only in-kind) | $5,800 |
| Aug 4, 2023 | Completed final sign-off Aug 2023 | 561 Baker St | Pineda Construction Inc | comply with nov#201981271: repain water damage at walls and ceilings. no work allowed at fire escapes.Details
comply with nov#201981271: repain water damage at walls and ceilings. no work allowed at fire escapes. | $1,500 |
| Jun 7, 2023 | Completed final sign-off Oct 2025 | 561 Baker St | Pineda Construction Inc | repair damaged walls, window(not visible from street), eliminate broken glass pane, door, ceiling, bathroom, 10% back stairway. to comply w/complaint #202307601Details
repair damaged walls, window(not visible from street), eliminate broken glass pane, door, ceiling, bathroom, 10% back stairway. to comply w/complaint #202307601 | $12,000 |
| May 29, 2019 | Never finaled issued May 2019, no final | 561 Baker St | Cpb Construction Corporation | install new 1.5" dia handrail at 36" above no sing of treads at entry. new handrail will be install 1.5" off the wall and extend 12" beyond the run of the stairs at the top and bottom. the permit address nov #200006737 comply with #4.Details
install new 1.5" dia handrail at 36" above no sing of treads at entry. new handrail will be install 1.5" off the wall and extend 12" beyond the run of the stairs at the top and bottom. the permit address nov #200006737 comply with #4. | $2,500 |
| Sep 14, 2017 | Completed final sign-off May 2020 | 561 Baker St | Seismic Retrofitters Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $45,000 |
| Nov 30, 2016 | Never finaled issued Nov 2016, no final | 561 Baker St | C N A Construction | revision to app# 201510169982, remove scope of work ,not to remove legal window in bathroom of unit 4 on second floor.Details
revision to app# 201510169982, remove scope of work ,not to remove legal window in bathroom of unit 4 on second floor. | |
| Aug 4, 2016 | Completed final sign-off Oct 2016 | 561 Baker St | C N A Construction | unit #2: replace kitchen cabinets, counter tops and appliances. same location. no changes to walls.Details
unit #2: replace kitchen cabinets, counter tops and appliances. same location. no changes to walls. | $8,000 |
| Mar 21, 2016 | Completed final sign-off Oct 2016 | 561 Baker St | C N A Construction | unit #2: to comply with nov 200006737, item 2,3,4. install new double sided fireplace. exterior handrailsDetails
unit #2: to comply with nov 200006737, item 2,3,4. install new double sided fireplace. exterior handrails | $3,000 |
| Oct 16, 2015 | Never finaled issued Feb 2016, no final | 561 Baker St | C N A Construction | to comply with nov #200563868:#5 repair window sash frame,#6 remove bathroom windows installed w/o permit.#7repair/maintain fire escape drop ladder in working condition,#9repair garbage chute,#17install ventilation at bathrm & remove ligtwell infill,#26 obtain elec/plmb for gas fireplaces. maher n/aDetails
to comply with nov #200563868:#5 repair window sash frame,#6 remove bathroom windows installed w/o permit.#7repair/maintain fire escape drop ladder in working condition,#9repair garbage chute,#17install ventilation at bathrm & remove ligtwell infill,#26 obtain elec/plmb for gas fireplaces. maher n/a | $7,000 |
| Mar 27, 2015 | Never finaled issued Mar 2015, no final | 561 Baker St | street space permitDetails
street space permit | ||
| Feb 10, 2015 | Never finaled issued Feb 2015, no final | 561 Baker St | street spaceDetails
street space | ||
| Sep 22, 2014 | Never finaled issued Sep 2014, no final | 561 Baker St | street spaceDetails
street space | ||
| Jul 10, 2014 | Completed final sign-off Aug 2014 | 561 Baker St | C N A Construction | to comply with housing inspection div n.o.v. issued on 10-11-05, complaint tracking #200563868. to complete all permit work required by the attached notice. repair back stairs less than 50%. n/a maher ordinanceDetails
to comply with housing inspection div n.o.v. issued on 10-11-05, complaint tracking #200563868. to complete all permit work required by the attached notice. repair back stairs less than 50%. n/a maher ordinance | $8,500 |
| Nov 29, 2007 | Never finaled issued Nov 2007, no final | 561 Baker St | street space & sidewalkDetails
street space & sidewalk | ||
| Dec 15, 2006 | Never finaled issued Dec 2006, no final | 561 Baker St | renew app #200302187649 for finalDetails
renew app #200302187649 for final | ||
| Oct 23, 2006 | Never finaled issued Feb 2007, no final | 561 Baker St | Value Fire Protection Inc | revision to appl#200406025319 hydro calculation to existing garage per ordinary group ii required to comply with his nov 199707748 dated 10/22/1997.Details
revision to appl#200406025319 hydro calculation to existing garage per ordinary group ii required to comply with his nov 199707748 dated 10/22/1997. | |
| Oct 19, 2006 | Never finaled issued Oct 2006, no final | 561 Baker St | renew 200110049938 for final onlyDetails
renew 200110049938 for final only | ||
| Jun 2, 2004 | Never finaled issued Sep 2004, no final | 561 Baker St | Value Fire Protection Inc | install sprinkler system. resubmit raised drawing- refer to 200206209720 r-1.Details
install sprinkler system. resubmit raised drawing- refer to 200206209720 r-1. | |
| Feb 18, 2003 | Never finaled issued Apr 2003, no final | 561 Baker St | Dannels Electric Inc | upgrade fire alarm systemDetails
upgrade fire alarm system | $6,000 |
| Jun 21, 2002 | Never finaled issued May 2003, no final | 561 Baker St | Value Fire Protection Inc | install sprinkler systems to comply his compliant#199707748 penalty paid under appl#200004116894Details
install sprinkler systems to comply his compliant#199707748 penalty paid under appl#200004116894 | $25,000 |
| Oct 4, 2001 | Expired or cancelled expired Jul 2002 | 561 Baker St | amend app #200004116894 to renovate upper floor of occupancy to meet criteria set forth in b.o. aplsDetails
amend app #200004116894 to renovate upper floor of occupancy to meet criteria set forth in b.o. apls | $5,000 | |
| Mar 27, 2001 | Completed final sign-off Apr 2001 | 561 Baker St | Gutierrez Roofing Co. | reroof towards south backside of bldgDetails
reroof towards south backside of bldg | $9,200 |
| Mar 16, 2001 | Completed final sign-off Mar 2002 | 561 Baker St | renew 2000/04/11/6894 until work is completed.Details
renew 2000/04/11/6894 until work is completed. | $2,500 | |
| Aug 18, 2000 | Never finaled issued Dec 2001, no final | 561 Baker St | replace existing dbl hung window w/french door-upgrade roof structure of garageDetails
replace existing dbl hung window w/french door-upgrade roof structure of garage | $3,500 | |
| Apr 11, 2000 | Completed final sign-off Mar 2002 | 561 Baker St | remove top flr,kitchen,bathrms,computer rm in basement,provide fire rated door,remove bedrm @top flrDetails
remove top flr,kitchen,bathrms,computer rm in basement,provide fire rated door,remove bedrm @top flr | $2,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- C N A Construction (5), Pineda Construction Inc (4), Value Fire Protection Inc (3), D & K Construction &Painting Company Inc (2), Cpb Construction Corporation, Dannels Electric Inc, Gutierrez Roofing Co., Seismic Retrofitters Inc.
- Engineers
- Abraham Zavala
- Authorized agent-otherss
- Stuart Hills
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.