Back to kitchen remodel contractors
D & K Construction &Painting Company Inc
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2002 to Oct 2026
- Last 24 months
- 10 permits filed
56 permits since 2000: 49 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 24, 2024 | Completed final sign-off Feb 2025 | 575 Columbus Av | to comply with nov #: 202426222 item #;2 - after installation of a 3rd party 1 window at kitchen area, and 2 windows at common areas (street facing). total of 3 windows, same size, same location, max u-factor 0.30.Details
to comply with nov #: 202426222 item #;2 - after installation of a 3rd party 1 window at kitchen area, and 2 windows at common areas (street facing). total of 3 windows, same size, same location, max u-factor 0.30. | $4,500 |
| Mar 6, 2024 | Completed final sign-off May 2024 | 1310 Fulton St | replace kitchen cabinets demo on small pony wall install new kitchen island replace kitchen fl. plumbing and electrical will be pulled plumbing and electrical contractors separately.Details
replace kitchen cabinets demo on small pony wall install new kitchen island replace kitchen fl. plumbing and electrical will be pulled plumbing and electrical contractors separately. | $49,500 |
| Sep 18, 2023 | Completed final sign-off Nov 2023 | 1622 45th Av | kitchen: partial demolition and installtion of new kitchen cabinets bathroom: cabintry and tiles. kitchen and bathroom remodel in-kindDetails
kitchen: partial demolition and installtion of new kitchen cabinets bathroom: cabintry and tiles. kitchen and bathroom remodel in-kind | $38,400 |
| Aug 22, 2019 | Completed final sign-off Sep 2019 | 145 Gardenside Dr | unit 11. replace two visible aluminum windows in-kind (kitchen and living). no other work under this permit.Details
unit 11. replace two visible aluminum windows in-kind (kitchen and living). no other work under this permit. | $6,000 |
| Feb 7, 2014 | Completed final sign-off May 2014 | 1835 Franklin St | remove all tiles, install new tiles, (one bath) tiles only, repl kitchen cabinets and counters only, no change to appliances and fixtures; compliance with ord 155-13 not requiredDetails
remove all tiles, install new tiles, (one bath) tiles only, repl kitchen cabinets and counters only, no change to appliances and fixtures; compliance with ord 155-13 not required | $4,500 |
| Jul 25, 2006 | Completed final sign-off Nov 2006 | 2000 Washington St | remodel of manager's unit & switch location of bathroom/closet & kitchenDetails
remodel of manager's unit & switch location of bathroom/closet & kitchen | $60,000 |