D B H Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to May 2017
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 140 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2015 | Completed final sign-off Aug 2016 | 147 17th Av | new access stair to (e) second floor wood deckDetails
new access stair to (e) second floor wood deck | $6,000 |
| Jun 3, 2014 | Completed final sign-off Apr 2015 | 785 Cole St | extend stair into (e) attic, add attic dormer, finish attic with gypsum board & flooring, attic use as hobby area (habitable), install sprinklers in attic.Details
extend stair into (e) attic, add attic dormer, finish attic with gypsum board & flooring, attic use as hobby area (habitable), install sprinklers in attic. | $40,000 |