Back to kitchen remodel contractors
D B H Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to May 2017
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 18 days from filing to permit and 137 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 722 22nd Av | cosmetic upgrad of kitchen & bathroom; replace tiles & floor, painting.Details
cosmetic upgrad of kitchen & bathroom; replace tiles & floor, painting. | $6,000 |
| Jul 23, 2015 | Completed final sign-off Jan 2016 | 111 Buena Vista Ave East Av | 1st fl: bathroom remodel and window replacement, 2nd fl relocate laundry room, ath, and kitchen. new isolated footing, new posts and beam. plumbing ele, mech modification as requiredDetails
1st fl: bathroom remodel and window replacement, 2nd fl relocate laundry room, ath, and kitchen. new isolated footing, new posts and beam. plumbing ele, mech modification as required | $42,000 |