Back to bathroom remodel contractors
D B H Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to May 2017
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 31, 2017 | Completed final sign-off Nov 2017 | 1118 Fell St | unit #2: remodel of existing bath in kind. add cabinets at pantry, repaint and refinish floors.Details
unit #2: remodel of existing bath in kind. add cabinets at pantry, repaint and refinish floors. | $12,000 |
| Mar 10, 2017 | Completed final sign-off Aug 2017 | 278 Sanchez St | apt #3: bathroom remodel, replace plumbing fixtures & new lighting, no structural work.Details
apt #3: bathroom remodel, replace plumbing fixtures & new lighting, no structural work. | $10,000 |
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 722 22nd Av | cosmetic upgrad of kitchen & bathroom; replace tiles & floor, painting.Details
cosmetic upgrad of kitchen & bathroom; replace tiles & floor, painting. | $6,000 |
| Apr 18, 2016 | Completed final sign-off Jun 2016 | 2480 Mission St | revision to 201511051811: enclose bathroom wallDetails
revision to 201511051811: enclose bathroom wall | |
| Jul 23, 2015 | Completed final sign-off Jan 2016 | 111 Buena Vista Ave East Av | 1st fl: bathroom remodel and window replacement, 2nd fl relocate laundry room, ath, and kitchen. new isolated footing, new posts and beam. plumbing ele, mech modification as requiredDetails
1st fl: bathroom remodel and window replacement, 2nd fl relocate laundry room, ath, and kitchen. new isolated footing, new posts and beam. plumbing ele, mech modification as required | $42,000 |
| Sep 8, 2014 | Expired or cancelled cancelled Dec 2014 | 490 Post St | unit 239 - demo designated partition walls, counter tops, sinks (n) accessible bathrm w/n wall (n) dropped ceiling (n) ceiling lights, (n) wood flooring & (n) carpet & (n) tile at bathroom, (n) built-ins (n) sinks at designated locations; maher n/aDetails
unit 239 - demo designated partition walls, counter tops, sinks (n) accessible bathrm w/n wall (n) dropped ceiling (n) ceiling lights, (n) wood flooring & (n) carpet & (n) tile at bathroom, (n) built-ins (n) sinks at designated locations; maher n/a | $25,000 |
| Mar 31, 2014 | Never finaled issued Mar 2014, no final | 48 Tucker Av | patch and repair mold damaged sheetrock in existing bathroom, replace and install new tile on floor and walk, paint entire area and door.Details
patch and repair mold damaged sheetrock in existing bathroom, replace and install new tile on floor and walk, paint entire area and door. | $5,000 |