Custom Built By Crawford Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2018 to Sep 2025
- Last 24 months
- 1 permit filed
22 permits since 2000: 22 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 41 days from filing to permit and 463 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2022 | Completed final sign-off Aug 2024 | 173 Bonview St | interior renovation at 1st floor and communicating stair to 2nd fl. partial roof infill at south lightwell; new skylight; window opening and replacemet inkind at rear facade & south lightwell. mech, electical, & plmg replacement of fixtures & system. rear yard improvements.Details
interior renovation at 1st floor and communicating stair to 2nd fl. partial roof infill at south lightwell; new skylight; window opening and replacemet inkind at rear facade & south lightwell. mech, electical, & plmg replacement of fixtures & system. rear yard improvements. | $155,000 |
| Jan 18, 2022 | Completed final sign-off Apr 2023 | 2451 15th Av | kitchen bath, laundry room remodel, 805 sf. interior stair remodel: interior and rear exterior window replacement, mech, elec and plumbing replacement in kind at areas of remodel. cosmetic changes to existing family room, roof replacement in kind.Details
kitchen bath, laundry room remodel, 805 sf. interior stair remodel: interior and rear exterior window replacement, mech, elec and plumbing replacement in kind at areas of remodel. cosmetic changes to existing family room, roof replacement in kind. | $132,000 |
| Mar 7, 2019 | Completed final sign-off Feb 2020 | 28 Santa Marina St | horizontal addition. remove metal prefab fire escape balcony on upper fl. construct wood deck & stairs on upper level at the back of (e) houseDetails
horizontal addition. remove metal prefab fire escape balcony on upper fl. construct wood deck & stairs on upper level at the back of (e) house | $10,000 |