Custom Built By Crawford Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2018 to Sep 2025
- Last 24 months
- 1 permit filed
22 permits since 2000: 22 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 0 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 12, 2024 | Completed final sign-off Apr 2024 | 4518 25th St | rear exterior guard rail at rear deck. replace inkind. less than 50% of rear deck to be repaired.Details
rear exterior guard rail at rear deck. replace inkind. less than 50% of rear deck to be repaired. | $5,000 |
| Aug 29, 2019 | Completed final sign-off Apr 2020 | 428 27th St | revision to bpa 201907024938 (replace decking at front <50%) to replace 100% of decking at front. repair existing porch handrail: work to include replacement of several newel posts and raising of existing handrail approx. 2 1/2" to meet cbc. at front steps, replace several newal posts and raise heigDetails
revision to bpa 201907024938 (replace decking at front <50%) to replace 100% of decking at front. repair existing porch handrail: work to include replacement of several newel posts and raising of existing handrail approx. 2 1/2" to meet cbc. at front steps, replace several newal posts and raise heig | $10,000 |
| Jul 2, 2019 | Completed final sign-off Dec 2019 | 428 27th St | replacing front porth boards with composite decking. less than 50% of entire porchDetails
replacing front porth boards with composite decking. less than 50% of entire porch | $2,000 |
| Mar 7, 2019 | Completed final sign-off Feb 2020 | 28 Santa Marina St | horizontal addition. remove metal prefab fire escape balcony on upper fl. construct wood deck & stairs on upper level at the back of (e) houseDetails
horizontal addition. remove metal prefab fire escape balcony on upper fl. construct wood deck & stairs on upper level at the back of (e) house | $10,000 |
| Mar 1, 2019 | Completed final sign-off Oct 2019 | 28 Santa Marina St | new lower timber deck 14'x19' with handrak, under 3 feet in heightDetails
new lower timber deck 14'x19' with handrak, under 3 feet in height | $10,000 |