Back to bathroom remodel contractors
Custom Built By Crawford Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2018 to Sep 2025
- Last 24 months
- 1 permit filed
22 permits since 2000: 22 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 0 days from filing to permit and 389 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2023 | Completed final sign-off Apr 2024 | 4518 25th St | interior renovation of a single family residence including minor modification of partition on the 3rd level. remodeling of kitchen and bathrooms, electrical and mechanical upgrades at interior and exterior.Details
interior renovation of a single family residence including minor modification of partition on the 3rd level. remodeling of kitchen and bathrooms, electrical and mechanical upgrades at interior and exterior. | $250,000 |
| May 19, 2023 | Completed final sign-off Jun 2024 | 173 Bonview St | cosmetic changes to (e) kitchen & bathroom: (e) finishes &fixtures; no change to layout. new fixtures in kind; no change to fixture count. new cabinets & countertop in kind. new appliances in kind. new finsihes. replace (e) damaged window in kind facing lightwell. same size and location. u factor .3Details
cosmetic changes to (e) kitchen & bathroom: (e) finishes &fixtures; no change to layout. new fixtures in kind; no change to fixture count. new cabinets & countertop in kind. new appliances in kind. new finsihes. replace (e) damaged window in kind facing lightwell. same size and location. u factor .3 | $35,500 |
| Jul 14, 2022 | Completed final sign-off Feb 2024 | 38 Lippard Av | remodel bathroom and laundry closet on first fl.Details
remodel bathroom and laundry closet on first fl. | $7,500 |
| Mar 24, 2022 | Completed final sign-off Nov 2022 | 433 Pacheco St | existing fixtures and finishes to be removed in kitchen and 2 bathrooms. doors, windows, and partitions to be removed. new cabinets, doors, window and fixtures to be added.Details
existing fixtures and finishes to be removed in kitchen and 2 bathrooms. doors, windows, and partitions to be removed. new cabinets, doors, window and fixtures to be added. | $68,000 |
| Jan 18, 2022 | Completed final sign-off Apr 2023 | 2451 15th Av | kitchen bath, laundry room remodel, 805 sf. interior stair remodel: interior and rear exterior window replacement, mech, elec and plumbing replacement in kind at areas of remodel. cosmetic changes to existing family room, roof replacement in kind.Details
kitchen bath, laundry room remodel, 805 sf. interior stair remodel: interior and rear exterior window replacement, mech, elec and plumbing replacement in kind at areas of remodel. cosmetic changes to existing family room, roof replacement in kind. | $132,000 |
| Feb 1, 2021 | Completed final sign-off May 2021 | 210 Noe St | rev to pa202011309785. rearrange fixtures and change door swing on both bathrooms. replace bathroom windows inkind. repair drywall in garage.Details
rev to pa202011309785. rearrange fixtures and change door swing on both bathrooms. replace bathroom windows inkind. repair drywall in garage. | |
| Nov 30, 2020 | Completed final sign-off May 2021 | 210 Noe St | relocate (e) bathroom and add one (n) bathroom on both floors. convert (e) bedroom to 2 bathrooms. amend to pa 202011209376 for additional work.Details
relocate (e) bathroom and add one (n) bathroom on both floors. convert (e) bedroom to 2 bathrooms. amend to pa 202011209376 for additional work. | $70,000 |
| Nov 20, 2020 | Completed final sign-off May 2021 | 210 Noe St | in kind bathroom remodel in both unitsDetails
in kind bathroom remodel in both units | $15,000 |
| Aug 22, 2018 | Completed final sign-off Oct 2019 | 28 Santa Marina St | revision to bpa# 2018-0813-7162: remodel hall way batrhoom and master bathroom in kind. replace all drywall and retile bathroom wih all new fixtures. replace rotted stud wood for master bathroom. construct new wall in shower for dryer ducting. remodel kitchen in kind.Details
revision to bpa# 2018-0813-7162: remodel hall way batrhoom and master bathroom in kind. replace all drywall and retile bathroom wih all new fixtures. replace rotted stud wood for master bathroom. construct new wall in shower for dryer ducting. remodel kitchen in kind. | $15,000 |
| Aug 17, 2018 | Completed final sign-off Oct 2019 | 28 Santa Marina St | insert washer and dryer at master bathroom dressing area at middel level, install electric w/ water hook-ups and vent past bathroom to airspaceDetails
insert washer and dryer at master bathroom dressing area at middel level, install electric w/ water hook-ups and vent past bathroom to airspace | $5,000 |
| Aug 13, 2018 | Completed final sign-off Oct 2019 | 28 Santa Marina St | replace (2) existing back sliding doors in same location and size. replace bath with shower, update knobs in master bathroom. replace bath and faucets in hall bathroom at second floor.Details
replace (2) existing back sliding doors in same location and size. replace bath with shower, update knobs in master bathroom. replace bath and faucets in hall bathroom at second floor. | $25,000 |