Cullinane Plastering
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to May 2022
- Last 24 months
- 0 permits filed
185 permits since 2000: 137 completed, 28 never finaled, 20 expired or cancelled.
Of the 28 never-finaled permits, 4 are 3 to 5 years old, 11 are 5 to 10 years old, 13 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
11 roof deck permits: 10 completed, 1 never finaled. Typically 153 days from filing to permit and 622 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2021 | Completed final sign-off Sep 2024 | 21 Joy St | as-builts plans for newly constructed single family dwelling and new roof deck above 3rd fl. ref pa#201506229594 (duplicate permit submitted)Details
as-builts plans for newly constructed single family dwelling and new roof deck above 3rd fl. ref pa#201506229594 (duplicate permit submitted) | $10,000 |
| Dec 30, 2020 | Never finaled issued Jun 2021, no final | 9 Joy St | to comply with nov 202071573. as-built plans & add new roof deck above 3/fDetails
to comply with nov 202071573. as-built plans & add new roof deck above 3/f | $10,000 |
| Dec 30, 2020 | Completed final sign-off Sep 2024 | 15 Joy St | as-built plans & add new roof deck above 3/f for pa201506229593.Details
as-built plans & add new roof deck above 3/f for pa201506229593. | $10,000 |
| Nov 8, 2016 | Completed final sign-off Jul 2017 | 837 South Van Ness Av | reapproval for roof deck railing installed at front of (e) roof deck over "e" garage. replace previous approved railing setback 4'0" from front of "e" roof deck over garage. ref pa #2014-0912-6185.Details
reapproval for roof deck railing installed at front of (e) roof deck over "e" garage. replace previous approved railing setback 4'0" from front of "e" roof deck over garage. ref pa #2014-0912-6185. | |
| Jul 18, 2016 | Completed final sign-off Jan 2022 | 338 Duncan St | horizontal & vertical addition, remodel (e) sfr, add new bthrooms, new bedrooms, new room down, relocate kitchen, new roof deck, new stair penthouse access, rebuild stair to rear yard, new interior stairs, modify wall layout, and new garage at (e) 1st floor & new driveway.Details
horizontal & vertical addition, remodel (e) sfr, add new bthrooms, new bedrooms, new room down, relocate kitchen, new roof deck, new stair penthouse access, rebuild stair to rear yard, new interior stairs, modify wall layout, and new garage at (e) 1st floor & new driveway. | $60,000 |
| Nov 26, 2014 | Completed final sign-off May 2015 | 2889 24th St | revision pa#2012-08-06-6608. revise roof deck tile system to pedestal system on 2nd fl.Details
revision pa#2012-08-06-6608. revise roof deck tile system to pedestal system on 2nd fl. | $5,000 |
| Sep 12, 2014 | Completed final sign-off Nov 2016 | 837 South Van Ness Av | (n) bedroom & bath at 1st flr w/ (n) interior stair up to 2nd flr at rear. new roof deck at 3rd and 4th floor. (n) elevator. 4 feet set back deck over garage. new bath at 4th floor. structural drawing.Details
(n) bedroom & bath at 1st flr w/ (n) interior stair up to 2nd flr at rear. new roof deck at 3rd and 4th floor. (n) elevator. 4 feet set back deck over garage. new bath at 4th floor. structural drawing. | $400,000 |
| Jun 2, 2014 | Completed final sign-off Nov 2015 | 127 Central Av | new roof deck in addition to pa# 2014/01/09/5946.Details
new roof deck in addition to pa# 2014/01/09/5946. | $5,000 |
| Jan 9, 2014 | Completed final sign-off Nov 2015 | 127 Central Av | remodel (e) building. new kitchens, bathrooms & laundry rooms will be provided for each unit. some walls will be removed. garage will be expanded & an elevator added. ground floor will be lowered with new foundations. repair porches at rear of building, in kind. no roof deck. sprinklers required.Details
remodel (e) building. new kitchens, bathrooms & laundry rooms will be provided for each unit. some walls will be removed. garage will be expanded & an elevator added. ground floor will be lowered with new foundations. repair porches at rear of building, in kind. no roof deck. sprinklers required. | $700,000 |
| Jul 16, 2013 | Completed final sign-off Jan 2015 | 1875 Mission St | installation of new pool on roof deck.Details
installation of new pool on roof deck. | $30,000 |
| May 10, 2012 | Completed final sign-off May 2014 | 60 Gates St | revision to pa#201203236767. add bedroom and closet on 1st floor. replace all windows and new roof deck terrace and stair. windows shall be metal frame.Details
revision to pa#201203236767. add bedroom and closet on 1st floor. replace all windows and new roof deck terrace and stair. windows shall be metal frame. | $30,000 |