Cullinane Plastering
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to May 2022
- Last 24 months
- 0 permits filed
185 permits since 2000: 137 completed, 28 never finaled, 20 expired or cancelled.
Of the 28 never-finaled permits, 4 are 3 to 5 years old, 11 are 5 to 10 years old, 13 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 43 days from filing to permit and 364 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2015 | Completed final sign-off Dec 2015 | 68 Landers St | this is a (n) deck at the roof a 3-story, 2-unit residential bldg the deck is private belonging to the 3rd flr flat & accessed theough a sliding sylightDetails
this is a (n) deck at the roof a 3-story, 2-unit residential bldg the deck is private belonging to the 3rd flr flat & accessed theough a sliding sylight | $20,000 |
| Jan 29, 2015 | Completed final sign-off Aug 2016 | 3953 24th St | repairs to elevated decking, rail caps, associated siding, windows and doors. repairs to light well windows, doors and siding. replace (e) stucoo at rear at first level per plan & reflash opening.Details
repairs to elevated decking, rail caps, associated siding, windows and doors. repairs to light well windows, doors and siding. replace (e) stucoo at rear at first level per plan & reflash opening. | $75,000 |