Back to bathroom remodel contractors
Cullinane Plastering
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to May 2022
- Last 24 months
- 0 permits filed
185 permits since 2000: 137 completed, 28 never finaled, 20 expired or cancelled.
Of the 28 never-finaled permits, 4 are 3 to 5 years old, 11 are 5 to 10 years old, 13 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 19 completed, 5 never finaled, 5 expired or cancelled. Typically 16 days from filing to permit and 490 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 2520 Quint St | replace dry rotted wood to comply with nob # 201993851. repair of front exterior balcony at 2nd fl. interior remodeling of 2nd fl units. to relocate (e) kitchen, bedrm, & bath. to add 1 master bathroom to each unit. all work to be performanced within hte existing boundary of the bldg.Details
replace dry rotted wood to comply with nob # 201993851. repair of front exterior balcony at 2nd fl. interior remodeling of 2nd fl units. to relocate (e) kitchen, bedrm, & bath. to add 1 master bathroom to each unit. all work to be performanced within hte existing boundary of the bldg. | $35,000 |
| Feb 12, 2021 | Completed final sign-off Jan 2024 | 5 Joy St | revision to pa 201702270142. relocate kitchen and half bath to rear at 2nd floor. relocate washer/dryer to 3rd floor from garage level.Details
revision to pa 201702270142. relocate kitchen and half bath to rear at 2nd floor. relocate washer/dryer to 3rd floor from garage level. | |
| Oct 29, 2020 | Never finaled issued Oct 2020, no final | 2522 Quint St | kitchen and bath remodel. replace e windows in kind, sheet roof with plywood 1 1/8 on high roof 1 /1/8 low roof ad dry rot repair. aluminum windowsDetails
kitchen and bath remodel. replace e windows in kind, sheet roof with plywood 1 1/8 on high roof 1 /1/8 low roof ad dry rot repair. aluminum windows | $80,000 |
| Oct 29, 2019 | Completed final sign-off Sep 2020 | 1801 Mission St | revision to pa 2019-0425-8975rerevise unit 204 to 486 ft 1 bed/bath, reassign previous 2nd bedroom to storage room off corridor. change east rooftop penthouse room designation to mechanical room from previous designation as emergency generator; show uninterrupted power supply room at basement levelDetails
revision to pa 2019-0425-8975rerevise unit 204 to 486 ft 1 bed/bath, reassign previous 2nd bedroom to storage room off corridor. change east rooftop penthouse room designation to mechanical room from previous designation as emergency generator; show uninterrupted power supply room at basement level | |
| Aug 29, 2017 | Completed final sign-off Sep 2017 | 175 Brewster St | revision to pa 2013-0515-7021 - bathroom modification in 1st floor; 2nd floor - bedroom & bathroom modification; 3rd floor - kitchen/bathroom modification; 4th floor - bathroom renovationDetails
revision to pa 2013-0515-7021 - bathroom modification in 1st floor; 2nd floor - bedroom & bathroom modification; 3rd floor - kitchen/bathroom modification; 4th floor - bathroom renovation | |
| Nov 23, 2015 | Completed final sign-off Apr 2017 | 4308 21st St | revision to pa 2013-0515-7001 2nd floor - create bathroom instead of bedroom, add new washer/dryer, relocate closet & bathroom; 3rd floor - create new closet in family room & re-arrange bathroom fixturesDetails
revision to pa 2013-0515-7001 2nd floor - create bathroom instead of bedroom, add new washer/dryer, relocate closet & bathroom; 3rd floor - create new closet in family room & re-arrange bathroom fixtures | |
| Nov 23, 2015 | Completed final sign-off May 2017 | 492 Douglass St | revision to pa 2013-0515-6968 - bedroom #4 to become bathroom; relocate bathroom for bedroom 2; relocate washer/dryerDetails
revision to pa 2013-0515-6968 - bedroom #4 to become bathroom; relocate bathroom for bedroom 2; relocate washer/dryer | |
| Oct 6, 2015 | Completed final sign-off Jun 2021 | 224 Laidley St | vertical & horizontal addition including (n) penthouse & (3) bathrooms & (1) vanity. remodel front elevation.Details
vertical & horizontal addition including (n) penthouse & (3) bathrooms & (1) vanity. remodel front elevation. | $650,000 |
| May 5, 2015 | Never finaled issued May 2015, no final | 561 Columbus Av | barrier removal- new 2 ada bathrooms, power door operated main entry, provide accessible bar counter for adaDetails
barrier removal- new 2 ada bathrooms, power door operated main entry, provide accessible bar counter for ada | $25,000 |
| Feb 11, 2015 | Completed final sign-off Feb 2015 | 806 Dolores St | relocate stair at 2nd floor to lower level from previously approved, other interior changes, identify unit parking/ storage/ yard ownership. revision to app#201309207368. add half bath at 2nd floor. corrects overall bldg length from previous approved permit.Details
relocate stair at 2nd floor to lower level from previously approved, other interior changes, identify unit parking/ storage/ yard ownership. revision to app#201309207368. add half bath at 2nd floor. corrects overall bldg length from previous approved permit. | |
| Jan 29, 2015 | Completed final sign-off Dec 2015 | 68 Landers St | front bldg - abaement of n.o.v. #201490832 & 201492516: remodel interior of 2 units 2nd & 3rd floors. remodel ground floor to add corridor to rear yard. add bathroom on both floors. reconfigure rear stairs. infill ground floor below second floor.Details
front bldg - abaement of n.o.v. #201490832 & 201492516: remodel interior of 2 units 2nd & 3rd floors. remodel ground floor to add corridor to rear yard. add bathroom on both floors. reconfigure rear stairs. infill ground floor below second floor. | $1,000 |
| Dec 3, 2014 | Completed final sign-off Oct 2018 | 4540 19th St | remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room.Details
remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room. | $560,000 |
| Sep 12, 2014 | Completed final sign-off Nov 2016 | 837 South Van Ness Av | (n) bedroom & bath at 1st flr w/ (n) interior stair up to 2nd flr at rear. new roof deck at 3rd and 4th floor. (n) elevator. 4 feet set back deck over garage. new bath at 4th floor. structural drawing.Details
(n) bedroom & bath at 1st flr w/ (n) interior stair up to 2nd flr at rear. new roof deck at 3rd and 4th floor. (n) elevator. 4 feet set back deck over garage. new bath at 4th floor. structural drawing. | $400,000 |
| Jul 31, 2014 | Completed final sign-off Dec 2015 | 66 Landers St | interior remodel of rear cottage, relocate interior stairs, relocate kitchen, 2 baths, no changes to existing windowDetails
interior remodel of rear cottage, relocate interior stairs, relocate kitchen, 2 baths, no changes to existing window | $40,000 |
| Jul 3, 2014 | Completed final sign-off Dec 2015 | 68 Landers St | interior remodeling of front 68, 70; relocate (e) kitchen, remodel (e) bathroomDetails
interior remodeling of front 68, 70; relocate (e) kitchen, remodel (e) bathroom | $100,000 |
| Jun 9, 2014 | Expired or cancelled withdrawn Jul 2014 | 68 Landers St | front bldg. remodel 2-unit over garage bldg. new kitchens, bathrooms & laundry room will be provided for each living unit. some walls will be removed.garage will be expanded within (e) foot print.bldg to receive new foundation & extensive structural improvements, & upgrade elec,plumb & mech systems.Details
front bldg. remodel 2-unit over garage bldg. new kitchens, bathrooms & laundry room will be provided for each living unit. some walls will be removed.garage will be expanded within (e) foot print.bldg to receive new foundation & extensive structural improvements, & upgrade elec,plumb & mech systems. | $500,000 |
| Jun 9, 2014 | Expired or cancelled withdrawn Jul 2014 | 66 Landers St | rear bldg. remodel single family cottage. new kitchen, bathrooms & laundry room. some walls will be removed. cottage to receive new foundation & extensive structural improvements, & upgrade elec,plumb & mech system.Details
rear bldg. remodel single family cottage. new kitchen, bathrooms & laundry room. some walls will be removed. cottage to receive new foundation & extensive structural improvements, & upgrade elec,plumb & mech system. | $245,000 |
| Mar 7, 2014 | Completed final sign-off Sep 2015 | 1725 Wawona St | rooms down. creation of 2 bedrooms, 2 baths, family room, laundry and exercise room in existing crawl space/basement below residence. new interior connecting stairs. no added bulk or mass to structure. scope includes elec, plumbing, modificationsDetails
rooms down. creation of 2 bedrooms, 2 baths, family room, laundry and exercise room in existing crawl space/basement below residence. new interior connecting stairs. no added bulk or mass to structure. scope includes elec, plumbing, modifications | $150,000 |
| Jan 9, 2014 | Completed final sign-off Nov 2015 | 127 Central Av | remodel (e) building. new kitchens, bathrooms & laundry rooms will be provided for each unit. some walls will be removed. garage will be expanded & an elevator added. ground floor will be lowered with new foundations. repair porches at rear of building, in kind. no roof deck. sprinklers required.Details
remodel (e) building. new kitchens, bathrooms & laundry rooms will be provided for each unit. some walls will be removed. garage will be expanded & an elevator added. ground floor will be lowered with new foundations. repair porches at rear of building, in kind. no roof deck. sprinklers required. | $700,000 |
| Nov 21, 2013 | Completed final sign-off Nov 2015 | 127 Central Av | soft demo, non-structural, 3 kitchens and 3 bathrooms remodel. no change of wall, window and door.Details
soft demo, non-structural, 3 kitchens and 3 bathrooms remodel. no change of wall, window and door. | $20,000 |
| Oct 8, 2013 | Expired or cancelled cancelled Mar 2016 | 806 Dolores St | remodel bathrooms: 1 per unitDetails
remodel bathrooms: 1 per unit | $7,000 |
| Sep 20, 2013 | Completed final sign-off Feb 2015 | 806 Dolores St | interior alteration at all floors: infill lightwells, new bedroom & bath @ garage level, expand rooms at 1st floor to connect with unit on 2nd floor. wet bar, new bath @ 2nd & new bath @ 3rd floor. new sprinkler system @ all floor under separate permit.Details
interior alteration at all floors: infill lightwells, new bedroom & bath @ garage level, expand rooms at 1st floor to connect with unit on 2nd floor. wet bar, new bath @ 2nd & new bath @ 3rd floor. new sprinkler system @ all floor under separate permit. | $40,000 |
| Oct 9, 2012 | Expired or cancelled expired Dec 2023 | 2207 25th St | rear bldg. to comply with c-201033584. remodel rear cottage, legalize the use as dwelling unit. close (e) prop line windows. new plumbing & elec, new 1-hr pl wall protection new windows & doors. remodel kitchen & bath, new conc, patio.Details
rear bldg. to comply with c-201033584. remodel rear cottage, legalize the use as dwelling unit. close (e) prop line windows. new plumbing & elec, new 1-hr pl wall protection new windows & doors. remodel kitchen & bath, new conc, patio. | $40,000 |
| Jan 18, 2011 | Never finaled issued May 2011, no final | 3953 24th St | legalize nail salon: add operable intake vent window above 9e) entry. add vent grills lower right of entry, add bath lower floor. add ada stair stripping, add ada sink on ground flr., add circulating exhaust & filters fans, add drop clg., add vapor strips.Details
legalize nail salon: add operable intake vent window above 9e) entry. add vent grills lower right of entry, add bath lower floor. add ada stair stripping, add ada sink on ground flr., add circulating exhaust & filters fans, add drop clg., add vapor strips. | $15,000 |
| Sep 23, 2010 | Completed final sign-off May 2011 | 140 Santa Monica Wy | expand existing basement utility room to create additional bedroom, full bath, and utility area. remove wall at stair down, adjust grade at side yard and pave. new beam and post added to garage.Details
expand existing basement utility room to create additional bedroom, full bath, and utility area. remove wall at stair down, adjust grade at side yard and pave. new beam and post added to garage. | $50,000 |
| Aug 23, 2010 | Expired or cancelled cancelled Aug 2022 | 300 Saint Francis Bl | add new bath and enlarge family room at basement. replace 11 windows. visible from streetDetails
add new bath and enlarge family room at basement. replace 11 windows. visible from street | $40,000 |
| Aug 2, 2010 | Completed final sign-off Jan 2011 | 300 Saint Francis Bl | interior remodel. 4 bedrooms, add two new full bath rooms and update kitchen. all windows, basement remodel and photo voltaic array under future permit.Details
interior remodel. 4 bedrooms, add two new full bath rooms and update kitchen. all windows, basement remodel and photo voltaic array under future permit. | $60,000 |
| Jun 14, 2010 | Never finaled issued Jun 2010, no final | 210 Holladay Av | add new full bathroom and relocate laundry on the 2nd floor shown as delta 2 on plans. pa# 2006.05.26.2657 ( new construction) completed.Details
add new full bathroom and relocate laundry on the 2nd floor shown as delta 2 on plans. pa# 2006.05.26.2657 ( new construction) completed. | $5,000 |
| Mar 30, 2007 | Completed final sign-off May 2017 | 2149 Castro St | site permit application for horizontal and vertical additions. interior to be gutted, new garage, kitchen, baths, windows, doors, plmg, electricalDetails
site permit application for horizontal and vertical additions. interior to be gutted, new garage, kitchen, baths, windows, doors, plmg, electrical | $251,000 |