Cove Construction
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2000 to Sep 2011
- Last 24 months
- 0 permits filed
89 permits since 2000: 69 completed, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 1 completed, 1 never finaled. Typically 143 days from filing to permit and 518 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 31, 2011 | Never finaled issued Jan 2012, no final | 540 10th Av | site permit. ground floor rear horizontal addition. w/second floor roof deck & stairs to grade. ground floor is a home study.Details
site permit. ground floor rear horizontal addition. w/second floor roof deck & stairs to grade. ground floor is a home study. | $25,000 |
| Jul 10, 2006 | Completed final sign-off Jan 2008 | 1020 Baker St | (work to be done at unit 1 only) replace damaged wood framing door and windows with metal framing, windwos and doors 2 replace waterproof deck surface.Details
(work to be done at unit 1 only) replace damaged wood framing door and windows with metal framing, windwos and doors 2 replace waterproof deck surface. | $17,750 |