Back to kitchen remodel contractors
Cove Construction
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2000 to Sep 2011
- Last 24 months
- 0 permits filed
89 permits since 2000: 69 completed, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 11 completed. Typically 0 days from filing to permit and 259 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2011 | Completed final sign-off Nov 2011 | 2281 Filbert St | replace all kitchen cabinets, countertops and back splash. replacee sink and faucet. replace appliances. all fixtures in existing locations. no structural work. no exterior work.Details
replace all kitchen cabinets, countertops and back splash. replacee sink and faucet. replace appliances. all fixtures in existing locations. no structural work. no exterior work. | $30,000 |
| Jun 23, 2011 | Completed final sign-off Nov 2011 | 2281 Filbert St | remodel kitchen on 2nd level & bay window horiz.addition:remove & replace with new cabinetry. all fixtures in same location. upgrade new counter tops. no electrical work. remove window at rear of house. replace with new. bay window to match extg bay window at rear of house.no work at front of house.Details
remodel kitchen on 2nd level & bay window horiz.addition:remove & replace with new cabinetry. all fixtures in same location. upgrade new counter tops. no electrical work. remove window at rear of house. replace with new. bay window to match extg bay window at rear of house.no work at front of house. | $65,000 |
| Dec 10, 2010 | Completed final sign-off Aug 2011 | 1234 Page St | remodel kitchen and bathroom; add moment frame; raise deck at 3rd floor; restore gas fireplace at parlorDetails
remodel kitchen and bathroom; add moment frame; raise deck at 3rd floor; restore gas fireplace at parlor | $120,000 |
| Jul 2, 2010 | Completed final sign-off Sep 2010 | 3855 Washington St | add curved steel beans to existing headers over kitchen and dining room doors. fasten existing 2x3 tube steel columns. existing header did not conform work. work at back of houseDetails
add curved steel beans to existing headers over kitchen and dining room doors. fasten existing 2x3 tube steel columns. existing header did not conform work. work at back of house | $12,000 |
| Mar 31, 2010 | Completed final sign-off Mar 2011 | 2302 Steiner St | remodel kitchen: add seimic upgrade; footing & shearwall reconfigure (e) window.Details
remodel kitchen: add seimic upgrade; footing & shearwall reconfigure (e) window. | $87,500 |
| Feb 8, 2010 | Completed final sign-off Jun 2011 | 3855 Washington St | new countertops in kitchen, sand,stain ,refinish hardwood floors, paint interior through out, reface kitchen , living room and library cabinets (new cabinet doors, drawer files). no wall removal. no new lighting, no structural changes.Details
new countertops in kitchen, sand,stain ,refinish hardwood floors, paint interior through out, reface kitchen , living room and library cabinets (new cabinet doors, drawer files). no wall removal. no new lighting, no structural changes. | $138,000 |
| Apr 30, 2009 | Completed final sign-off Aug 2009 | 430 Hayes St | work on unit#201 only. replace kitchen cabinets. no relocation of fixtures, plumbing or eletrical). replace bath tub, faucets & vanity (no relocation of fixtures, plumbing, electrical) add hardwood flooring in kind.Details
work on unit#201 only. replace kitchen cabinets. no relocation of fixtures, plumbing or eletrical). replace bath tub, faucets & vanity (no relocation of fixtures, plumbing, electrical) add hardwood flooring in kind. | $25,000 |
| Oct 14, 2008 | Completed final sign-off Aug 2009 | 1815 Vallejo St | revision to 2006101945533, reduce scope of work. delete addition at kitchen and family room. remodel only. replace windows in kind at family room. replace damaged exterior stair off kitchen in kind.Details
revision to 2006101945533, reduce scope of work. delete addition at kitchen and family room. remodel only. replace windows in kind at family room. replace damaged exterior stair off kitchen in kind. | |
| Apr 12, 2007 | Completed final sign-off Aug 2008 | 4452 23rd St | demolish rear family room and rebuild larger, remodel kitchen and bathroomDetails
demolish rear family room and rebuild larger, remodel kitchen and bathroom | $175,000 |
| Mar 16, 2004 | Completed final sign-off Nov 2004 | 1907 Buchanan St | remodel kitchen and master bath, repalce damaged skylight, paito door, replace roof covering, ***Details
remodel kitchen and master bath, repalce damaged skylight, paito door, replace roof covering, *** | $55,000 |
| Jul 30, 2003 | Completed final sign-off Mar 2004 | 1000 Mason St | remove 2 non bearing walls, remodel kitchen, add cabinetry, bar sink and misc lighting upgradeDetails
remove 2 non bearing walls, remodel kitchen, add cabinetry, bar sink and misc lighting upgrade | $130,000 |