Back to bathroom remodel contractors
Cove Construction
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2000 to Sep 2011
- Last 24 months
- 0 permits filed
89 permits since 2000: 69 completed, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 0 days from filing to permit and 259 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2011 | Completed final sign-off Oct 2011 | 1069 Church St | replace drywall in living room, replace pocket doors in living room on 1/f, demo 2/f bath, replace vanity cabinet, new tub, new shower. no added fixtures, add new recessed can lights in dining, living and bathroom. no exterior work. comply with cec 150(k) lighting requirements.Details
replace drywall in living room, replace pocket doors in living room on 1/f, demo 2/f bath, replace vanity cabinet, new tub, new shower. no added fixtures, add new recessed can lights in dining, living and bathroom. no exterior work. comply with cec 150(k) lighting requirements. | $42,000 |
| Dec 10, 2010 | Completed final sign-off Aug 2011 | 1234 Page St | remodel kitchen and bathroom; add moment frame; raise deck at 3rd floor; restore gas fireplace at parlorDetails
remodel kitchen and bathroom; add moment frame; raise deck at 3rd floor; restore gas fireplace at parlor | $120,000 |
| Nov 12, 2010 | Completed final sign-off Jun 2011 | 3855 Washington St | re-design of interior wall layout at 4th floor. move bathroom, add 1 sink, 1 toilet, add master closet, no structural changes, no exterior work.Details
re-design of interior wall layout at 4th floor. move bathroom, add 1 sink, 1 toilet, add master closet, no structural changes, no exterior work. | $65,000 |
| Aug 10, 2010 | Completed final sign-off Jun 2012 | 67 Belcher St | 1st fl: revise bedroom #4, add sink. revise entry at front. 2nd fl: revise bath layout, add bath. exterior: substitute aluminum clad windows for woodDetails
1st fl: revise bedroom #4, add sink. revise entry at front. 2nd fl: revise bath layout, add bath. exterior: substitute aluminum clad windows for wood | $9,500 |
| May 10, 2010 | Completed final sign-off Jun 2012 | 67 Belcher St | add 3 bedroom mezzanine, storage area, relocate laundry, remodel master bath, add 5 skylights, add new dressing area, add awning windows, add dressing areaDetails
add 3 bedroom mezzanine, storage area, relocate laundry, remodel master bath, add 5 skylights, add new dressing area, add awning windows, add dressing area | $58,000 |
| Apr 30, 2009 | Completed final sign-off Aug 2009 | 430 Hayes St | work on unit#201 only. replace kitchen cabinets. no relocation of fixtures, plumbing or eletrical). replace bath tub, faucets & vanity (no relocation of fixtures, plumbing, electrical) add hardwood flooring in kind.Details
work on unit#201 only. replace kitchen cabinets. no relocation of fixtures, plumbing or eletrical). replace bath tub, faucets & vanity (no relocation of fixtures, plumbing, electrical) add hardwood flooring in kind. | $25,000 |
| Jan 5, 2009 | Completed final sign-off Apr 2009 | 111 Terrace Dr | remodel master bathroom at 3rd floor: replace bathtub, shower, vanity & w.c in same location, new tile floor.Details
remodel master bathroom at 3rd floor: replace bathtub, shower, vanity & w.c in same location, new tile floor. | $35,000 |
| Mar 31, 2008 | Completed final sign-off Feb 2009 | 111 Terrace Dr | remove non-bearing walls to enlarge laundry room including add sink & relocate washer/dryer & new lighting on 1st floor. remodel master bath including relocate toilet (w/c) & shower, new lighting on 3rd floor.Details
remove non-bearing walls to enlarge laundry room including add sink & relocate washer/dryer & new lighting on 1st floor. remodel master bath including relocate toilet (w/c) & shower, new lighting on 3rd floor. | $30,000 |
| Apr 12, 2007 | Completed final sign-off Aug 2008 | 4452 23rd St | demolish rear family room and rebuild larger, remodel kitchen and bathroomDetails
demolish rear family room and rebuild larger, remodel kitchen and bathroom | $175,000 |
| Mar 28, 2005 | Completed final sign-off Nov 2005 | 2302 Steiner St | revision of permit# 1044324. (pa# 2004/12/22/1979). remove 1 sink @ master bath.Details
revision of permit# 1044324. (pa# 2004/12/22/1979). remove 1 sink @ master bath. | |
| Mar 16, 2004 | Completed final sign-off Nov 2004 | 1907 Buchanan St | remodel kitchen and master bath, repalce damaged skylight, paito door, replace roof covering, ***Details
remodel kitchen and master bath, repalce damaged skylight, paito door, replace roof covering, *** | $55,000 |