Back to kitchen remodel contractors
Community Reconstruction Solutions
- Based in
- Burlingame
- On San Francisco permits
- May 2007 to Jul 2026
- Last 24 months
- 17 permits filed
178 permits since 2000: 156 completed, 2 in progress, 14 never finaled, 6 expired or cancelled.
Of the 14 never-finaled permits, 4 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 1839 15th St | units: 151, 251, 252, 352, 351, 452, 451: remove and replace kitchen windows (7) 48x42 in-kind. remove and replace wall elevation, siding and trims. paint to match existing. non street facing. max u-factor = 0.58 per cec 141.0(b)2ai exception 1Details
units: 151, 251, 252, 352, 351, 452, 451: remove and replace kitchen windows (7) 48x42 in-kind. remove and replace wall elevation, siding and trims. paint to match existing. non street facing. max u-factor = 0.58 per cec 141.0(b)2ai exception 1 | $17,847 |
| Nov 7, 2013 | Completed final sign-off Jan 2014 | 85 Ora Wy | reinstalled cabinets in kitchen & installed vinyl floor. change tile in bathroom, bathtub. no change at wall, window and doorDetails
reinstalled cabinets in kitchen & installed vinyl floor. change tile in bathroom, bathtub. no change at wall, window and door | $4,500 |
| Jul 20, 2009 | Completed final sign-off Oct 2009 | 45 Ora Wy | kitchen remodel, replace cabinets and floorDetails
kitchen remodel, replace cabinets and floor | $7,500 |