Back to bathroom remodel contractors
Community Reconstruction Solutions
- Based in
- Burlingame
- On San Francisco permits
- May 2007 to Jul 2026
- Last 24 months
- 17 permits filed
178 permits since 2000: 156 completed, 2 in progress, 14 never finaled, 6 expired or cancelled.
Of the 14 never-finaled permits, 4 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 57 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 65 Ora Wy | apt 308: remodel bathroom: replace bath tub for shower pan. new tiles & shower mixed.Details
apt 308: remodel bathroom: replace bath tub for shower pan. new tiles & shower mixed. | $11,000 |
| Jul 14, 2015 | Completed final sign-off Oct 2015 | 45 Ora Wy | (e) lightwell & existing bathroom renovation. (replaced bath tub for shower pan & installed tile on wall). no change to wall location or fixture locations.Details
(e) lightwell & existing bathroom renovation. (replaced bath tub for shower pan & installed tile on wall). no change to wall location or fixture locations. | $4,750 |
| Nov 7, 2013 | Completed final sign-off Jan 2014 | 85 Ora Wy | reinstalled cabinets in kitchen & installed vinyl floor. change tile in bathroom, bathtub. no change at wall, window and doorDetails
reinstalled cabinets in kitchen & installed vinyl floor. change tile in bathroom, bathtub. no change at wall, window and door | $4,500 |
| Jun 25, 2013 | Completed final sign-off Aug 2013 | 65 Ora Wy | remove bath tub & tile, install new shower pan & tile. install new electric outlet & upgrade electric panel. upgrade water valve in showerDetails
remove bath tub & tile, install new shower pan & tile. install new electric outlet & upgrade electric panel. upgrade water valve in shower | $9,300 |