Collins Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Oct 2024
- Last 24 months
- 1 permit filed
68 permits since 2000: 44 completed, 7 never finaled, 17 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
8 stairs permits: 4 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 159 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2010 | Completed final sign-off Dec 2010 | 618 San Bruno Av | repair dry rot to (e) stairs & deck rail less than 50%.Details
repair dry rot to (e) stairs & deck rail less than 50%. | $500 |
| Jul 9, 2010 | Completed final sign-off Dec 2010 | 618 San Bruno Av | install an interior spiral stair from 2nd. to 3rd. flr. replace (e) footing @ the back of the house. repair & replace dry-rot in rear wall.Details
install an interior spiral stair from 2nd. to 3rd. flr. replace (e) footing @ the back of the house. repair & replace dry-rot in rear wall. | $10,000 |
| Feb 19, 2010 | Completed final sign-off Dec 2010 | 7 Delano Av | replace e foundation, relocate e interior stair. 2 new bedrooms, 1 new family room,2 new bathrooms, 1 new media room on ground levelDetails
replace e foundation, relocate e interior stair. 2 new bedrooms, 1 new family room,2 new bathrooms, 1 new media room on ground level | $50,000 |
| Dec 5, 2002 | Never finaled issued Dec 2002, no final | 2419 21st Av | repair h2o damage @ front stair wall.break stucco,repair damage,restucco about 30 sq ft of stucco woDetails
repair h2o damage @ front stair wall.break stucco,repair damage,restucco about 30 sq ft of stucco wo | $1,500 |
| May 17, 2002 | Expired or cancelled expired Jun 2005 | 1335 Noe St | to fininalize appl#200110191236 rev. (e) stairs to accommodate new with fire wall at lower landingDetails
to fininalize appl#200110191236 rev. (e) stairs to accommodate new with fire wall at lower landing | $500 |
| Aug 6, 2001 | Completed final sign-off Jan 2002 | 214 Roanoke St | remodel kitchen, install new cabinets, new spiral staircase in rear deck, prepare concrete footingDetails
remodel kitchen, install new cabinets, new spiral staircase in rear deck, prepare concrete footing | $10,000 |
| Jun 11, 2001 | Expired or cancelled expired Oct 2001 | 7 Delano Av | voluntary bolting of (e) foundationreplacement of g treads on (e) staircase to storage areaDetails
voluntary bolting of (e) foundationreplacement of g treads on (e) staircase to storage area | $2,500 |
| Feb 10, 2000 | Expired or cancelled expired Sep 2000 | 25 Vasquez Av | stair repair and termite repairDetails
stair repair and termite repair |