Back to bathroom remodel contractors
Collins Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Oct 2024
- Last 24 months
- 1 permit filed
68 permits since 2000: 44 completed, 7 never finaled, 17 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 12 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2024 | Completed final sign-off Apr 2026 | 2614 Anza St | legalize (e) dwelling unit on ground flr/1st flr, 644 sqft unit with 1-bedroom, living room, 1-bathroom, closets and a kitchen. (e) furnaces and water heater relocated to garage. project will not expand building envelope and no work at the front of building.Details
legalize (e) dwelling unit on ground flr/1st flr, 644 sqft unit with 1-bedroom, living room, 1-bathroom, closets and a kitchen. (e) furnaces and water heater relocated to garage. project will not expand building envelope and no work at the front of building. | $44,700 |
| Sep 29, 2016 | Completed final sign-off Oct 2017 | 1871 Church St | develop habitable space at extg 1st floor and under extg 2nd floor at rear of structure. add 2 bedrooms and 2 baths. replan extg 2nd floor: remodel kitchen and bath and develop new bedroom and bath. foundation replacement under pa #2016-09-15-9209Details
develop habitable space at extg 1st floor and under extg 2nd floor at rear of structure. add 2 bedrooms and 2 baths. replan extg 2nd floor: remodel kitchen and bath and develop new bedroom and bath. foundation replacement under pa #2016-09-15-9209 | $200,000 |
| Jun 30, 2014 | Completed final sign-off Oct 2015 | 211 Granville Wy | re-face kitchen cabinets; repair water damaged bedroom, and bathroom areasDetails
re-face kitchen cabinets; repair water damaged bedroom, and bathroom areas | $15,000 |
| Jul 11, 2012 | Completed final sign-off Oct 2013 | 280 Casitas Av | full remodel of (e) house. relocate partitions, (n) siding & relocate (n) windows. refixture kitchen & baths. enclose 3rd floor deck.Details
full remodel of (e) house. relocate partitions, (n) siding & relocate (n) windows. refixture kitchen & baths. enclose 3rd floor deck. | $42,000 |
| Mar 23, 2011 | Completed final sign-off Jan 2012 | 477 Day St | revision to app#201101218778. sheet a2.1,53,54,55,56, and m1. add one full bath, one study, and one bedroom on ground floor. relocate kitchen on 2nd floor.Details
revision to app#201101218778. sheet a2.1,53,54,55,56, and m1. add one full bath, one study, and one bedroom on ground floor. relocate kitchen on 2nd floor. | |
| Feb 19, 2010 | Completed final sign-off Dec 2010 | 7 Delano Av | replace e foundation, relocate e interior stair. 2 new bedrooms, 1 new family room,2 new bathrooms, 1 new media room on ground levelDetails
replace e foundation, relocate e interior stair. 2 new bedrooms, 1 new family room,2 new bathrooms, 1 new media room on ground level | $50,000 |
| Aug 15, 2003 | Completed final sign-off Mar 2004 | 435 Alvarado St | bathroom remodel of existing bathroom at 2nd floor. convert 1 larg bath and closet into 2 separate bDetails
bathroom remodel of existing bathroom at 2nd floor. convert 1 larg bath and closet into 2 separate b | $10,000 |
| Jul 17, 2001 | Completed final sign-off Jan 2002 | 474 Ulloa St | remodel kitchen new upper +base cabinet. remodel bathroom. retile + install low fow toiletDetails
remodel kitchen new upper +base cabinet. remodel bathroom. retile + install low fow toilet | $12,000 |