Collins Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Oct 2024
- Last 24 months
- 1 permit filed
68 permits since 2000: 44 completed, 7 never finaled, 17 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 8 completed, 1 never finaled. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2018 | Never finaled issued Feb 2018, no final | 245 Carl St | repari to existing decking, in kind. less than 50%Details
repari to existing decking, in kind. less than 50% | $5,000 |
| Feb 16, 2016 | Completed final sign-off Nov 2016 | 409 Mississippi St | extend (e) 3rd flr deck 3'-0" towards the rear of the hous, replace (e) rotten decking at 3rd flr and install new glass and steel railingDetails
extend (e) 3rd flr deck 3'-0" towards the rear of the hous, replace (e) rotten decking at 3rd flr and install new glass and steel railing | $10,000 |
| Nov 21, 2013 | Completed final sign-off Jan 2014 | 200 Cresta Vista Dr | repairs to existing deck, replace in kind existing rails, less than 50%Details
repairs to existing deck, replace in kind existing rails, less than 50% | $20,000 |
| Jul 11, 2012 | Completed final sign-off Oct 2013 | 280 Casitas Av | full remodel of (e) house. relocate partitions, (n) siding & relocate (n) windows. refixture kitchen & baths. enclose 3rd floor deck.Details
full remodel of (e) house. relocate partitions, (n) siding & relocate (n) windows. refixture kitchen & baths. enclose 3rd floor deck. | $42,000 |
| Sep 7, 2010 | Completed final sign-off Dec 2010 | 618 San Bruno Av | repair dry rot to (e) stairs & deck rail less than 50%.Details
repair dry rot to (e) stairs & deck rail less than 50%. | $500 |
| Apr 9, 2007 | Completed final sign-off May 2007 | 1822 10th Av | replace in kind front and rar windows, 8 windows, repair damage to rear deck less than 50% of deck., both down sill plate to (e) foundation voluntary . min 5/8 bolts. 7" embedment, 2 per piece.Details
replace in kind front and rar windows, 8 windows, repair damage to rear deck less than 50% of deck., both down sill plate to (e) foundation voluntary . min 5/8 bolts. 7" embedment, 2 per piece. | $9,000 |
| Apr 11, 2002 | Completed final sign-off Jan 2004 | 101 Elsie St | construct family room w/loft and deckDetails
construct family room w/loft and deck | $40,000 |
| Aug 6, 2001 | Completed final sign-off Jan 2002 | 214 Roanoke St | remodel kitchen, install new cabinets, new spiral staircase in rear deck, prepare concrete footingDetails
remodel kitchen, install new cabinets, new spiral staircase in rear deck, prepare concrete footing | $10,000 |
| May 7, 2001 | Completed final sign-off Jun 2001 | 1214 20th Av | demo rear porch area per violation notice #200113389 demo rear deck areaDetails
demo rear porch area per violation notice #200113389 demo rear deck area | $2,500 |