Back to kitchen remodel contractors
Colindres & Associates
- Based in
- San Rafael
- On San Francisco permits
- Aug 2012 to Sep 2026
- Last 24 months
- 17 permits filed
107 permits since 2000: 70 completed, 17 in progress, 9 never finaled, 11 expired or cancelled.
Of the 9 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 17 completed, 4 in progress, 1 expired or cancelled. Typically 23 days from filing to permit and 500 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Aug 2026 | 2961 Broderick St | rev to pa# 2026-0417-9680: new kitchen range exhause hood on the 2nd fl.Details
rev to pa# 2026-0417-9680: new kitchen range exhause hood on the 2nd fl. | $2,500 |
| Oct 1, 2025 | In progress issued Feb 2026 | 3217 Baker St | horizontal addition to barhroom on 3/f.replace window in kind at front facade. enclose (e) lightwell. new hallway & renovation of (e) family room on 1/f. renovation of (e) kitchen & bathrooms on 2/f.Details
horizontal addition to barhroom on 3/f.replace window in kind at front facade. enclose (e) lightwell. new hallway & renovation of (e) family room on 1/f. renovation of (e) kitchen & bathrooms on 2/f. | $250,655 |
| Aug 26, 2025 | Expired or cancelled cancelled Jun 2026 | 2460 Lyon St | remodel 2 bathrooms and one kitchen. includes replacing toilets, faucets, shower, adn tub.Details
remodel 2 bathrooms and one kitchen. includes replacing toilets, faucets, shower, adn tub. | $150,000 |
| May 22, 2025 | In progress issued May 2025 | 358 El Camino Del Mar | revision to pa# 202503252967, kitchen and 3 1/2 bathrooms remodel, update electrical and plumbing. window replacement like for like, dryrot repairs on exterior decorative balcony like for like, voluntary str strengthening 1/f walls and alteration of closet walls at 3/f.Details
revision to pa# 202503252967, kitchen and 3 1/2 bathrooms remodel, update electrical and plumbing. window replacement like for like, dryrot repairs on exterior decorative balcony like for like, voluntary str strengthening 1/f walls and alteration of closet walls at 3/f. | $100,000 |
| Sep 27, 2024 | In progress issued Feb 2025 | 2600 Green St | revision to pa# 202406204927. relocate skylight & roof access. windows. 1st fl: bath remodel & (n) full bathroom at gym. 2nd fl: powder rm remodel. (n) kitchen cabinets, countertops, appliances, plumbing. replace (e) living room fireplace. 3rd fl: remodel 3 baths. 4rd fl: remodel 1 bath.Details
revision to pa# 202406204927. relocate skylight & roof access. windows. 1st fl: bath remodel & (n) full bathroom at gym. 2nd fl: powder rm remodel. (n) kitchen cabinets, countertops, appliances, plumbing. replace (e) living room fireplace. 3rd fl: remodel 3 baths. 4rd fl: remodel 1 bath. | $923,500 |
| Aug 26, 2024 | Completed final sign-off Jan 2026 | 827 Marina Bl | revision to pa# 202406275400 - 1/f: addition of conditioned space + remodel, new front door & heatpump & tankless wh. 2/f: (n) windows + pocket door between kitchen + dining. 3/f: (n) lighting. 4/f: reconfigure bath + closet + add office (n) windows + doors on north & south facade.Details
revision to pa# 202406275400 - 1/f: addition of conditioned space + remodel, new front door & heatpump & tankless wh. 2/f: (n) windows + pocket door between kitchen + dining. 3/f: (n) lighting. 4/f: reconfigure bath + closet + add office (n) windows + doors on north & south facade. | $125,000 |
| Jun 27, 2024 | Completed final sign-off Mar 2025 | 827 Marina Bl | remodel level 2-reconfig closet bathroom doors and handrails, kit-island cabinets, level 3 remodel of master bathroom and guest bathroom. lighting and plumbing work to be performed. handrail work on 2nd floor, basement, and 4th floor. 2nd level kitchen island.Details
remodel level 2-reconfig closet bathroom doors and handrails, kit-island cabinets, level 3 remodel of master bathroom and guest bathroom. lighting and plumbing work to be performed. handrail work on 2nd floor, basement, and 4th floor. 2nd level kitchen island. | |
| Aug 11, 2022 | Completed final sign-off May 2024 | 2505 Pacific Av | swap out tub for standing shower- demo existing stairs to level 1 and reverse direction, demo stair wall, demo wall to (e) dark room. level 1: replace kitchen cabinets in kind, expand kitchen wall out into stair wall construct (n) wet bar . l/2 replace plumb fixtures and relocate toiler and shower sDetails
swap out tub for standing shower- demo existing stairs to level 1 and reverse direction, demo stair wall, demo wall to (e) dark room. level 1: replace kitchen cabinets in kind, expand kitchen wall out into stair wall construct (n) wet bar . l/2 replace plumb fixtures and relocate toiler and shower s | $100,000 |
| Jun 22, 2022 | Completed final sign-off Nov 2023 | 2505 Pacific Av | remove and replace finishes in kitchen, primary bath, lower guest bath, and upper kids bath. add washer and dryer to lower level laundry. all work to current codes. dryer exhaust to terminate 3'-0" minimum from property lines & openings. comply duct length limitation per cmc 504.4.2.1.Details
remove and replace finishes in kitchen, primary bath, lower guest bath, and upper kids bath. add washer and dryer to lower level laundry. all work to current codes. dryer exhaust to terminate 3'-0" minimum from property lines & openings. comply duct length limitation per cmc 504.4.2.1. | $85,000 |
| Feb 1, 2022 | Completed final sign-off Feb 2023 | 2340 Washington St | renovate & reconfiguration of habitable space at basement level with addition of laundry and bar. replace door to storage to extg concrete steps to rear yard. romove extg in-wall fireplace & infill wall at 1st level (kitchen area) add nw pair of doors at 3rd level play room.Details
renovate & reconfiguration of habitable space at basement level with addition of laundry and bar. replace door to storage to extg concrete steps to rear yard. romove extg in-wall fireplace & infill wall at 1st level (kitchen area) add nw pair of doors at 3rd level play room. | $250,000 |
| Apr 1, 2021 | Completed final sign-off Nov 2023 | 930 Minnesota St | expansion of lower unit of e 3 story,2unit res into unconditioned storage space. new infill area to includ bedroom suite, relocation of kitchen, total 550 sq ft. fire reated corridor connecting rear yard and street. 1st fl remodel rear portion of unit to include interior connecting stair, open greatDetails
expansion of lower unit of e 3 story,2unit res into unconditioned storage space. new infill area to includ bedroom suite, relocation of kitchen, total 550 sq ft. fire reated corridor connecting rear yard and street. 1st fl remodel rear portion of unit to include interior connecting stair, open great | $200,000 |
| Dec 15, 2020 | Completed final sign-off Mar 2022 | 45 Almaden Ct | interior remodel at 2nd fl (main floor): remodel and expand kitchen. replace all windows and stucco.Details
interior remodel at 2nd fl (main floor): remodel and expand kitchen. replace all windows and stucco. | $50,000 |
| Aug 29, 2020 | Completed final sign-off Jan 2023 | 3070 Pacific Av | interior remodel including basement bath, 1st fl kitchen, 2nd fl bathrooms, and reconfiguration of 3rd fl. exterior work includes replacements of 3 windows in-kind on north elevation. 1 window & 4 doors in kind on east. replace glass only on 5 windows & doors on east & south.Details
interior remodel including basement bath, 1st fl kitchen, 2nd fl bathrooms, and reconfiguration of 3rd fl. exterior work includes replacements of 3 windows in-kind on north elevation. 1 window & 4 doors in kind on east. replace glass only on 5 windows & doors on east & south. | $465,000 |
| Sep 3, 2019 | Completed final sign-off Jun 2020 | 151 Alice B Toklas Pl | removal & replacement of kitchen cabinets, all rough-ins to remain in same location, re use (e) appliances replace countertops, all plumbing, electrical & mechanincal to be done to code. no structural work or modification to wall layoutDetails
removal & replacement of kitchen cabinets, all rough-ins to remain in same location, re use (e) appliances replace countertops, all plumbing, electrical & mechanincal to be done to code. no structural work or modification to wall layout | $17,500 |
| Sep 21, 2017 | Completed final sign-off Jun 2020 | 161 28th Av | remove (e) 1st floor. family room & roof deck. new rear addition with new dinning room @ 1st floor. new closet & master bath @ 2nd floor. kitchen & bath remodel @ 1st floor. 2 bath remodel @ 2nd floor. new storage & laundry room @ basement. new deck @ rear yard. new windows, patio doors &garage doorDetails
remove (e) 1st floor. family room & roof deck. new rear addition with new dinning room @ 1st floor. new closet & master bath @ 2nd floor. kitchen & bath remodel @ 1st floor. 2 bath remodel @ 2nd floor. new storage & laundry room @ basement. new deck @ rear yard. new windows, patio doors &garage door | $140,000 |
| Apr 21, 2017 | Completed final sign-off Aug 2019 | 36 Commonwealth Av | 1/f: (n) rebuilt stair at same location; 2/f: relocate kitchen, n powder rm,bath relocated; 3/f: (n) full bathrm, (n) laundry rm; foundation - ref.#201701257867 (new perimeter foundation/lower slab)Details
1/f: (n) rebuilt stair at same location; 2/f: relocate kitchen, n powder rm,bath relocated; 3/f: (n) full bathrm, (n) laundry rm; foundation - ref.#201701257867 (new perimeter foundation/lower slab) | $600,000 |
| Nov 10, 2015 | Completed final sign-off Oct 2016 | 653 Marina Bl | remove interior finishes only, no work on exterior or structural components at ceiling of kitchen, garage, family room, walls of master bath. all demo to be patched back to (e) condition.Details
remove interior finishes only, no work on exterior or structural components at ceiling of kitchen, garage, family room, walls of master bath. all demo to be patched back to (e) condition. | $4,000 |
| Aug 28, 2015 | Completed final sign-off Mar 2017 | 1170 Sacramento St | remove and replace countertops, install tile back splash, new cooktop at kitchen. removing shower and installing tub, move and relocate some existing lighting.Details
remove and replace countertops, install tile back splash, new cooktop at kitchen. removing shower and installing tub, move and relocate some existing lighting. | $35,000 |
| Jul 2, 2015 | Completed final sign-off Oct 2015 | 733 Front St | remove and replace kitchen cabinets. all rough in locations to remain the same. no lighting work, no new wall and no existing wall relocation.Details
remove and replace kitchen cabinets. all rough in locations to remain the same. no lighting work, no new wall and no existing wall relocation. | $7,500 |
| Feb 20, 2015 | Completed final sign-off Jun 2019 | 3829 Clay St | horizontal addition at rear. new dormers, new elevator and interior remodel work. add 3 & 1/2 new bathrooms & kitchen remodel.Details
horizontal addition at rear. new dormers, new elevator and interior remodel work. add 3 & 1/2 new bathrooms & kitchen remodel. | $700,000 |
| Oct 4, 2013 | Completed final sign-off Oct 2014 | 3070 Pacific Av | revision to app#201308224946. interior remodel on basement floor an interior stair is to be removed and an exterior doorway to be infilled. on 1st floor, bedroom converted to excercise room, exercise room converted to playroom,power room relocated. on 2nd floor kitchen remodeled with relocatedDetails
revision to app#201308224946. interior remodel on basement floor an interior stair is to be removed and an exterior doorway to be infilled. on 1st floor, bedroom converted to excercise room, exercise room converted to playroom,power room relocated. on 2nd floor kitchen remodeled with relocated | $174,461 |
| May 2, 2013 | Completed final sign-off Feb 2015 | 3426 Broderick St | level #1: build out under deck & create space in garage for 2nd car. level #2: remodel kitchen & create family room, (n) door & window. level #3: build out over kitchen work below & create master suite.Details
level #1: build out under deck & create space in garage for 2nd car. level #2: remodel kitchen & create family room, (n) door & window. level #3: build out over kitchen work below & create master suite. | $600,000 |