Colindres & Associates
- Based in
- San Rafael
- On San Francisco permits
- Aug 2012 to Sep 2026
- Last 24 months
- 17 permits filed
107 permits since 2000: 70 completed, 17 in progress, 9 never finaled, 11 expired or cancelled.
Of the 9 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
7 deck permits: 4 completed, 1 in progress, 2 expired or cancelled. Typically 95 days from filing to permit and 462 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2024 | Expired or cancelled withdrawn Mar 2025 | 2610 Pacific Av | foundation replacement & seismic upgrade; full interior remodel; exterior window replacement; horizontal extension of rear deckDetails
foundation replacement & seismic upgrade; full interior remodel; exterior window replacement; horizontal extension of rear deck | $1,750,000 |
| May 21, 2024 | In progress filed May 2024, not yet issued | 288 29th Av | remove and replace deck in kind due to dryrot repair.Details
remove and replace deck in kind due to dryrot repair. | $15,000 |
| May 12, 2023 | Completed final sign-off Feb 2024 | 3225 Clay St | south facade repairs new wood deck, new in kind replacement windows and doors at south facade onlyDetails
south facade repairs new wood deck, new in kind replacement windows and doors at south facade only | $100,000 |
| Mar 19, 2018 | Expired or cancelled cancelled Nov 2022 | 256 Pennsylvania Av | work @ unit# 256 only. alteration to (e) rear deck & roof deck. alterations include a new steel trellis @ each deck. new door @ rear deck, new guardrail @ rear deck. new wind screens & pavers. no new sq.ft. or interior work.Details
work @ unit# 256 only. alteration to (e) rear deck & roof deck. alterations include a new steel trellis @ each deck. new door @ rear deck, new guardrail @ rear deck. new wind screens & pavers. no new sq.ft. or interior work. | $50,000 |
| Sep 21, 2017 | Completed final sign-off Jun 2020 | 161 28th Av | remove (e) 1st floor. family room & roof deck. new rear addition with new dinning room @ 1st floor. new closet & master bath @ 2nd floor. kitchen & bath remodel @ 1st floor. 2 bath remodel @ 2nd floor. new storage & laundry room @ basement. new deck @ rear yard. new windows, patio doors &garage doorDetails
remove (e) 1st floor. family room & roof deck. new rear addition with new dinning room @ 1st floor. new closet & master bath @ 2nd floor. kitchen & bath remodel @ 1st floor. 2 bath remodel @ 2nd floor. new storage & laundry room @ basement. new deck @ rear yard. new windows, patio doors &garage door | $140,000 |
| Jul 13, 2015 | Completed final sign-off Oct 2016 | 2846 Washington St | exterior alterations to an existing single-family dwelling, including new guardrails at entry patio, egress stair replacement at rear yard, guardrail replacement at existing rear yard deck and roof deck and new pavers / decking throughoutDetails
exterior alterations to an existing single-family dwelling, including new guardrails at entry patio, egress stair replacement at rear yard, guardrail replacement at existing rear yard deck and roof deck and new pavers / decking throughout | $80,000 |
| May 2, 2013 | Completed final sign-off Feb 2015 | 3426 Broderick St | level #1: build out under deck & create space in garage for 2nd car. level #2: remodel kitchen & create family room, (n) door & window. level #3: build out over kitchen work below & create master suite.Details
level #1: build out under deck & create space in garage for 2nd car. level #2: remodel kitchen & create family room, (n) door & window. level #3: build out over kitchen work below & create master suite. | $600,000 |