Cody Design Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2023 to Aug 2026
- Last 24 months
- 13 permits filed
17 permits since 2000: 13 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 in progress. Typically 6 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Aug 2026 | 2243 Steiner St | remodel kitchen and (3) (e) bathrooms. relocate laundry to 2/f. add wall to close off (e) den.Details
remodel kitchen and (3) (e) bathrooms. relocate laundry to 2/f. add wall to close off (e) den. | $208,177 |
| Jul 8, 2025 | Completed final sign-off Jan 2026 | 3992 25th St | upper unit kitchen 3992: remodel one kitchen. replace in kind cabinets, appliances, flooring, plumbing fixtures.Details
upper unit kitchen 3992: remodel one kitchen. replace in kind cabinets, appliances, flooring, plumbing fixtures. | $40,000 |
| Jun 20, 2025 | Completed final sign-off Jul 2026 | 978 Teresita Bl | remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from insideDetails
remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from inside | $70,000 |
| May 22, 2025 | Completed final sign-off Aug 2026 | 2631 Balboa St | 1st/f: addition to rear. n) conditioned space bedroom, bath, mud rm & laundry w/ new stair to 2nd/f, updated foundation to bedroom. 2nd/f: remodel kitchen, bath, living, entry, den & powder rm. 3rd/f: remodel master suite, 2nd bath, n) laundry closet, linen closet. n) windows & doors thruDetails
1st/f: addition to rear. n) conditioned space bedroom, bath, mud rm & laundry w/ new stair to 2nd/f, updated foundation to bedroom. 2nd/f: remodel kitchen, bath, living, entry, den & powder rm. 3rd/f: remodel master suite, 2nd bath, n) laundry closet, linen closet. n) windows & doors thru | $195,000 |
| Jan 10, 2025 | Completed final sign-off Mar 2025 | 54 Elizabeth St | like for like kitchen remodel replace cabinets, counter tops, appliances and flooring. approx 85sqftDetails
like for like kitchen remodel replace cabinets, counter tops, appliances and flooring. approx 85sqft | $24,000 |
| Apr 5, 2024 | In progress issued Apr 2024 | 25 Forest Side Av | 1x kitchen remodel. new cabinets and countertops , sink and faucet. and hood vent- no wall removal.Details
1x kitchen remodel. new cabinets and countertops , sink and faucet. and hood vent- no wall removal. | $12,000 |