Cody Design Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2023 to Aug 2026
- Last 24 months
- 13 permits filed
17 permits since 2000: 13 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 3 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2025 | Completed final sign-off Aug 2026 | 2631 Balboa St | revision to pa # 2025-0522-7130. add new deck on the entry level (2nd fl) top of flat roofDetails
revision to pa # 2025-0522-7130. add new deck on the entry level (2nd fl) top of flat roof | |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 863 Vermont St | repair roof deck above garage. remove (e) deck boards & sleepers. replace sleeprs and deck boards w/ trex material. deck is on a garage roof, roofer will replace roofing. we will remove and replace siding and door as needed so roofer can install membrane properly.Details
repair roof deck above garage. remove (e) deck boards & sleepers. replace sleeprs and deck boards w/ trex material. deck is on a garage roof, roofer will replace roofing. we will remove and replace siding and door as needed so roofer can install membrane properly. | $14,000 |