Back to bathroom remodel contractors
Cody Design Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2023 to Aug 2026
- Last 24 months
- 13 permits filed
17 permits since 2000: 13 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 in progress. Typically 22 days from filing to permit and 262 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Aug 2026 | 2243 Steiner St | remodel kitchen and (3) (e) bathrooms. relocate laundry to 2/f. add wall to close off (e) den.Details
remodel kitchen and (3) (e) bathrooms. relocate laundry to 2/f. add wall to close off (e) den. | $208,177 |
| May 26, 2026 | Completed final sign-off Sep 2026 | 682 28th St | remodel in kind one bathroom including tub/shower, toilet, vanity, tile. no moving walls. approx. 85 sq ft.Details
remodel in kind one bathroom including tub/shower, toilet, vanity, tile. no moving walls. approx. 85 sq ft. | $12,000 |
| Jan 20, 2026 | Completed final sign-off Apr 2026 | 3992 25th St | remodel 1 bathroom including toilet, vanity, shower & shower pan. replace five street facing windows with new milgard v400 tuscany vinyl double-hung windows. replace one street facing sliding glass door with new milgard vinyl unit. new drywall in on room, less than 100 sq ft.Details
remodel 1 bathroom including toilet, vanity, shower & shower pan. replace five street facing windows with new milgard v400 tuscany vinyl double-hung windows. replace one street facing sliding glass door with new milgard vinyl unit. new drywall in on room, less than 100 sq ft. | $35,000 |
| Jun 20, 2025 | Completed final sign-off Jul 2026 | 978 Teresita Bl | remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from insideDetails
remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from inside | $70,000 |
| May 22, 2025 | Completed final sign-off Aug 2026 | 2631 Balboa St | 1st/f: addition to rear. n) conditioned space bedroom, bath, mud rm & laundry w/ new stair to 2nd/f, updated foundation to bedroom. 2nd/f: remodel kitchen, bath, living, entry, den & powder rm. 3rd/f: remodel master suite, 2nd bath, n) laundry closet, linen closet. n) windows & doors thruDetails
1st/f: addition to rear. n) conditioned space bedroom, bath, mud rm & laundry w/ new stair to 2nd/f, updated foundation to bedroom. 2nd/f: remodel kitchen, bath, living, entry, den & powder rm. 3rd/f: remodel master suite, 2nd bath, n) laundry closet, linen closet. n) windows & doors thru | $195,000 |
| Dec 21, 2023 | Completed final sign-off Dec 2024 | 3915 Cesar Chavez St | one 2nd flr bathroom remodel in (e) single family dwelling and associated plumbing and electrical work.Details
one 2nd flr bathroom remodel in (e) single family dwelling and associated plumbing and electrical work. | $20,552 |