Back to kitchen remodel contractors
Clune Construction Company L P
- Based in
- Los Angeles
- On San Francisco permits
- Feb 2014 to Aug 2026
- Last 24 months
- 21 permits filed
190 permits since 2000: 123 completed, 4 in progress, 53 never finaled, 10 expired or cancelled.
Of the 53 never-finaled permits, 12 are 3 to 5 years old, 36 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 1 completed, 3 never finaled. Typically 14 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 1 Post St | suite 103 and 105-ref 202505227060 ti- alteration of low side air distrubution for the basement floor cafe. (n) power and signal devices throughout the space (n) title 24 compliant lighting and controls. no change to kitchen equipment.Details
suite 103 and 105-ref 202505227060 ti- alteration of low side air distrubution for the basement floor cafe. (n) power and signal devices throughout the space (n) title 24 compliant lighting and controls. no change to kitchen equipment. | $20,000 |
| Sep 29, 2021 | Never finaled issued Oct 2021, no final | 560 Mission St | 23rd floor:revision to app#202105039686. revisions include micro kitchen layout, added 3 compartment sink and mop sink, minor updates to door and hardware schedules; wall floor and ceiling finishes, millwork,lighting and associated mep.Details
23rd floor:revision to app#202105039686. revisions include micro kitchen layout, added 3 compartment sink and mop sink, minor updates to door and hardware schedules; wall floor and ceiling finishes, millwork,lighting and associated mep. | |
| May 3, 2021 | Never finaled issued Aug 2021, no final | 560 Mission St | t.i. to 18,026 sqft alterations include non-struc partitions, finishes, furniture+equipment+associated m.e.p. & smoke control system revisions, , 2-hr horizontal exit, 2-hr fire barrier, 2 zone smoke control. struc work to av supports+header for 3 large openings. expand micro kitchen for food prep.Details
t.i. to 18,026 sqft alterations include non-struc partitions, finishes, furniture+equipment+associated m.e.p. & smoke control system revisions, , 2-hr horizontal exit, 2-hr fire barrier, 2 zone smoke control. struc work to av supports+header for 3 large openings. expand micro kitchen for food prep. | $2,345,801 |
| Oct 27, 2017 | Never finaled issued Nov 2017, no final | 650 California St | 32nd floor: demo of 5 extg offices and 1 conference room. new finishes including carpet, paint and wall covering. includes new kitchenette and reception area. a/v upgrades in extg offices. n/a for maherDetails
32nd floor: demo of 5 extg offices and 1 conference room. new finishes including carpet, paint and wall covering. includes new kitchenette and reception area. a/v upgrades in extg offices. n/a for maher | $400,000 |