Back to kitchen remodel contractors
Cjc Management Group Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2017 to Apr 2026
- Last 24 months
- 16 permits filed
54 permits since 2000: 50 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
26 kitchen remodel permits: 24 completed, 2 never finaled. Typically 0 days from filing to permit and 81 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2026 | Completed final sign-off Jul 2026 | 3730 25th St | unit #11: in-kind kitchen remodel, remove & replace cabinets, countertops and sink/faucet. perform necessary plumbing & electrical scope to meet requirements.Details
unit #11: in-kind kitchen remodel, remove & replace cabinets, countertops and sink/faucet. perform necessary plumbing & electrical scope to meet requirements. | $15,000 |
| Feb 4, 2026 | Completed final sign-off Feb 2026 | 1450 07th Av | unit 2- kitchen subfloor where soft/rotted, install (n) lup finished flooring in kitchen. no layout change or wall removal.Details
unit 2- kitchen subfloor where soft/rotted, install (n) lup finished flooring in kitchen. no layout change or wall removal. | $2,000 |
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 2130 Market St | unit #1: kitchen remodel and bathroom update. replace kitchen cabinets and countertop, new sink and faucet (convert wall-mount faucet to couner top mount) update unit subpanel to enable required new kitchen circuits. bathroom convert flush-o-meter toilet to standard angle stop and tank toiletDetails
unit #1: kitchen remodel and bathroom update. replace kitchen cabinets and countertop, new sink and faucet (convert wall-mount faucet to couner top mount) update unit subpanel to enable required new kitchen circuits. bathroom convert flush-o-meter toilet to standard angle stop and tank toilet | $20,000 |
| Aug 12, 2025 | Completed final sign-off Oct 2025 | 184 Park St | kitchen remodel unit a (lower unit). (n) cabinets, countertops and appliances, in kind. no layout changes. (n) electrical circuits for kitchen update. no removal of walls.Details
kitchen remodel unit a (lower unit). (n) cabinets, countertops and appliances, in kind. no layout changes. (n) electrical circuits for kitchen update. no removal of walls. | $25,000 |
| Dec 24, 2024 | Completed final sign-off Apr 2025 | 305 Franklin St | unit 31; kitchen upgrade remove and replace kitchen cabinets and countertops all (e) rough ins electrical upgrade to support (n) kitchen circuits no layout changes no change to bathroom new toilet and sinkDetails
unit 31; kitchen upgrade remove and replace kitchen cabinets and countertops all (e) rough ins electrical upgrade to support (n) kitchen circuits no layout changes no change to bathroom new toilet and sink | $30,000 |
| Dec 24, 2024 | Completed final sign-off Apr 2025 | 685 Haight St | #9. remove and replace kitchen cabinet and counter tops all (e) rough ins electric upgrade to support (n) kitchen circuits no layout changes bathroooms (n) tolet and sink w/ (e) rough ins (e) claw foot tub to remainDetails
#9. remove and replace kitchen cabinet and counter tops all (e) rough ins electric upgrade to support (n) kitchen circuits no layout changes bathroooms (n) tolet and sink w/ (e) rough ins (e) claw foot tub to remain | $30,000 |
| Sep 20, 2024 | Completed final sign-off Dec 2024 | 1132 Haight St | replace kitchen cabinets/countertop in-kind. patch + paint plaster throughout. provide necessary electrical circuits for appliances in kitchen.Details
replace kitchen cabinets/countertop in-kind. patch + paint plaster throughout. provide necessary electrical circuits for appliances in kitchen. | $30,000 |
| Jan 3, 2024 | Completed final sign-off May 2024 | 166 15th Av | paint unit, refinish floors, replace countertop and sink in kitchen. replace vanity in kind, toilet. re-surface tub and surround.Details
paint unit, refinish floors, replace countertop and sink in kitchen. replace vanity in kind, toilet. re-surface tub and surround. | $35,000 |
| Jul 18, 2023 | Completed final sign-off Nov 2023 | 55 Hermann St | unit# 602: kitchen remodel - remove and replace kitchen cabinets and countertops, new sink, faucet, new appliances, install req kitchen circuits (electrical), in kind no layout changes. bathroom upgrade for tile surround replacement and new tub/shower valve.Details
unit# 602: kitchen remodel - remove and replace kitchen cabinets and countertops, new sink, faucet, new appliances, install req kitchen circuits (electrical), in kind no layout changes. bathroom upgrade for tile surround replacement and new tub/shower valve. | $35,000 |
| Jun 23, 2023 | Completed final sign-off Nov 2023 | 2074 Union St | kitchen remodel- cabinets-countertops, use (e) plumbing roughins, install new subpanel in unit w/ (e) ckts, new d/w and g/d, sand and refinish (e) h/w floors,painitng. in kind remodelDetails
kitchen remodel- cabinets-countertops, use (e) plumbing roughins, install new subpanel in unit w/ (e) ckts, new d/w and g/d, sand and refinish (e) h/w floors,painitng. in kind remodel | $30,000 |
| Jun 23, 2023 | Completed final sign-off Nov 2023 | 2130 Market St | unit #12: kitchen remodel- cabinets+ countertops, use (e) plumbing roug ins, install new subpanel in unit w/ (e) ckts and (n) ckts for kit. remodel new d/w and g.d. install lvp throughout, painting- replace shower/tub valve in bath and replace surround w/ marble panels.Details
unit #12: kitchen remodel- cabinets+ countertops, use (e) plumbing roug ins, install new subpanel in unit w/ (e) ckts and (n) ckts for kit. remodel new d/w and g.d. install lvp throughout, painting- replace shower/tub valve in bath and replace surround w/ marble panels. | $30,000 |
| Feb 8, 2023 | Completed final sign-off Apr 2023 | 3650 Fillmore St | #202: kitchen remodel: replace cabinets, countertops in kind, no layout changes. electrical upgrades to include nw receptacles and light fixtures though out, and in unit subpanel. kitchen sink plmg only, extg rouph ins.Details
#202: kitchen remodel: replace cabinets, countertops in kind, no layout changes. electrical upgrades to include nw receptacles and light fixtures though out, and in unit subpanel. kitchen sink plmg only, extg rouph ins. | $30,000 |
| Sep 16, 2022 | Completed final sign-off Dec 2022 | 2659 Lombard St | unit 302: replace kitchen cabinets, counters, and appliances in kind. replace carpet and paint throughout. no wall orr llayout changes. bathrooms relace the surround w/ marble panels.Details
unit 302: replace kitchen cabinets, counters, and appliances in kind. replace carpet and paint throughout. no wall orr llayout changes. bathrooms relace the surround w/ marble panels. | $20,000 |
| Aug 16, 2022 | Completed final sign-off Mar 2023 | 3045 Jackson St | unit 504: bathroom remodel: new shower pan + tile, vanity, toilet. install new shut off valves for bathroom. kitchen: repaint cabinets + replace countertops + sink. new appliances.Details
unit 504: bathroom remodel: new shower pan + tile, vanity, toilet. install new shut off valves for bathroom. kitchen: repaint cabinets + replace countertops + sink. new appliances. | $20,000 |
| Jul 28, 2022 | Completed final sign-off Sep 2022 | 1591 Jackson St | unit #503 (condo(: replace one kitchen cabinets + countertops in-kind. replace one bathroom tile surround and tile floor in-kind. replace shower valve. carpet replacement + vanity fixtures. no electrical or structural.Details
unit #503 (condo(: replace one kitchen cabinets + countertops in-kind. replace one bathroom tile surround and tile floor in-kind. replace shower valve. carpet replacement + vanity fixtures. no electrical or structural. | $30,000 |
| Jul 27, 2022 | Completed final sign-off Nov 2022 | 121 Day St | kitchen remodel: (e) wall between kitchen & living rm to be removed. remove all carpet & replace w/ vinyl plank throughout. full paint entire unit. bathrm remodel in kind (n) tile suround.(n) tile flr, (n) vanity fixtures.(e) layout to remain. no plumbing or elec scope. (e) elec. p. to be relocatedDetails
kitchen remodel: (e) wall between kitchen & living rm to be removed. remove all carpet & replace w/ vinyl plank throughout. full paint entire unit. bathrm remodel in kind (n) tile suround.(n) tile flr, (n) vanity fixtures.(e) layout to remain. no plumbing or elec scope. (e) elec. p. to be relocated | $15,000 |
| Jan 20, 2021 | Completed final sign-off Mar 2021 | 901 Fell St | unit #12: remodel in kind. remove and replace kitchen cabinets in kind. remove and replace bathroom bathtub and surround. replace tub/shower valve with new single handle. electric subpanel recently upgraded with permits.Details
unit #12: remodel in kind. remove and replace kitchen cabinets in kind. remove and replace bathroom bathtub and surround. replace tub/shower valve with new single handle. electric subpanel recently upgraded with permits. | $36,800 |
| Sep 30, 2020 | Completed final sign-off Nov 2020 | 1379 10th Av | unit 15: kitchen remodel & bathroom remodel in-kind, all (e) walls & framing, all (e) rough plumbing, run new romex to kitchen circuits as required, replace cabinets, countertips, appliances, new tile flooringDetails
unit 15: kitchen remodel & bathroom remodel in-kind, all (e) walls & framing, all (e) rough plumbing, run new romex to kitchen circuits as required, replace cabinets, countertips, appliances, new tile flooring | $35,000 |
| Sep 30, 2020 | Completed final sign-off Nov 2020 | 1379 10th Av | unit 9: kitchen remodel & bathroom remodel in-kind, all (e) walls & framing, all (e) rough plumbing to remain, run new romex to kitchen circuits as required, replace cabinets, countertips, appliances, new tile flooringDetails
unit 9: kitchen remodel & bathroom remodel in-kind, all (e) walls & framing, all (e) rough plumbing to remain, run new romex to kitchen circuits as required, replace cabinets, countertips, appliances, new tile flooring | $25,000 |
| Jun 13, 2020 | Completed final sign-off Jul 2020 | 4740 Balboa St | unit 304. kitchen remodel in-kind: remove and replace kitchen cabinets, countertop, and appliances; replace kitchen floor with tileDetails
unit 304. kitchen remodel in-kind: remove and replace kitchen cabinets, countertop, and appliances; replace kitchen floor with tile | $15,000 |
| Oct 24, 2019 | Completed final sign-off Feb 2023 | 666 South Van Ness Av | kitchen and bath reomdel. no structural work no wall modification.Details
kitchen and bath reomdel. no structural work no wall modification. | $25,000 |
| Jan 7, 2019 | Completed final sign-off Mar 2019 | 801 Corbett Av | unit 19. new countertop on kitchen islandDetails
unit 19. new countertop on kitchen island | $4,000 |
| Aug 7, 2018 | Completed final sign-off Aug 2018 | 3133 Octavia St | repair/replacce damaged dry wall in kitchen/hall. replace tile floors in kitchen in kind. install kitchen appliancesDetails
repair/replacce damaged dry wall in kitchen/hall. replace tile floors in kitchen in kind. install kitchen appliances | $10,000 |
| Dec 27, 2017 | Completed final sign-off Feb 2018 | 1523 Taylor St | apt#5. patch & paint walls throughout. bathroom & kitchen remodel to replace (e). replace (e) hardwood in unit w/ engineered hardwood. replace door in bedroom, baseboard as needed.Details
apt#5. patch & paint walls throughout. bathroom & kitchen remodel to replace (e). replace (e) hardwood in unit w/ engineered hardwood. replace door in bedroom, baseboard as needed. | $40,000 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 31 Harriet St | #4 - replace kitchen cabinets & counters; install new outlets in kitchen to code; replace kitchen flooring w/ vinyl, kithcen sink, disposal, applicances; replace vanity sink in bath, retile shower, install new outlet & vixture in bath, paint unit. maher ord 155-13 naDetails
#4 - replace kitchen cabinets & counters; install new outlets in kitchen to code; replace kitchen flooring w/ vinyl, kithcen sink, disposal, applicances; replace vanity sink in bath, retile shower, install new outlet & vixture in bath, paint unit. maher ord 155-13 na | $15,000 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 33 Harriet St | #6 - replace kitchen cabinets & counters; install new outlets in kitchen to code; replace kitchen flooring - vinyl, kitchen sink, disposal, appliances. replace vanity sink in bath, retile shower, repalce tub & valve; install new outlet & fisxtures; paint unit. maher ord 155-13 naDetails
#6 - replace kitchen cabinets & counters; install new outlets in kitchen to code; replace kitchen flooring - vinyl, kitchen sink, disposal, appliances. replace vanity sink in bath, retile shower, repalce tub & valve; install new outlet & fisxtures; paint unit. maher ord 155-13 na | $15,000 |