Back to bathroom remodel contractors
Cjc Management Group Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2017 to Apr 2026
- Last 24 months
- 16 permits filed
54 permits since 2000: 50 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 14 completed, 4 never finaled. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 2130 Market St | unit #1: kitchen remodel and bathroom update. replace kitchen cabinets and countertop, new sink and faucet (convert wall-mount faucet to couner top mount) update unit subpanel to enable required new kitchen circuits. bathroom convert flush-o-meter toilet to standard angle stop and tank toiletDetails
unit #1: kitchen remodel and bathroom update. replace kitchen cabinets and countertop, new sink and faucet (convert wall-mount faucet to couner top mount) update unit subpanel to enable required new kitchen circuits. bathroom convert flush-o-meter toilet to standard angle stop and tank toilet | $20,000 |
| Dec 24, 2024 | Completed final sign-off Apr 2025 | 305 Franklin St | unit 31; kitchen upgrade remove and replace kitchen cabinets and countertops all (e) rough ins electrical upgrade to support (n) kitchen circuits no layout changes no change to bathroom new toilet and sinkDetails
unit 31; kitchen upgrade remove and replace kitchen cabinets and countertops all (e) rough ins electrical upgrade to support (n) kitchen circuits no layout changes no change to bathroom new toilet and sink | $30,000 |
| Aug 22, 2024 | Completed final sign-off Sep 2024 | 184 Park St | moisture remediation in lr + bedroom + bathroom. interior. repair drywall in 3 rooms: bathroom celing, bedroom + lr walls. tar paper + insulate walls, drywall tape + paint.Details
moisture remediation in lr + bedroom + bathroom. interior. repair drywall in 3 rooms: bathroom celing, bedroom + lr walls. tar paper + insulate walls, drywall tape + paint. | $3,000 |
| Jan 3, 2024 | Completed final sign-off Mar 2024 | 29 Palm Av | (unit#2) bathroom upgrade: replace tile tub surround, vanity and toilet.Details
(unit#2) bathroom upgrade: replace tile tub surround, vanity and toilet. | $20,000 |
| Jul 18, 2023 | Completed final sign-off Nov 2023 | 55 Hermann St | unit# 602: kitchen remodel - remove and replace kitchen cabinets and countertops, new sink, faucet, new appliances, install req kitchen circuits (electrical), in kind no layout changes. bathroom upgrade for tile surround replacement and new tub/shower valve.Details
unit# 602: kitchen remodel - remove and replace kitchen cabinets and countertops, new sink, faucet, new appliances, install req kitchen circuits (electrical), in kind no layout changes. bathroom upgrade for tile surround replacement and new tub/shower valve. | $35,000 |
| Jun 23, 2023 | Completed final sign-off Nov 2023 | 2130 Market St | unit #12: kitchen remodel- cabinets+ countertops, use (e) plumbing roug ins, install new subpanel in unit w/ (e) ckts and (n) ckts for kit. remodel new d/w and g.d. install lvp throughout, painting- replace shower/tub valve in bath and replace surround w/ marble panels.Details
unit #12: kitchen remodel- cabinets+ countertops, use (e) plumbing roug ins, install new subpanel in unit w/ (e) ckts and (n) ckts for kit. remodel new d/w and g.d. install lvp throughout, painting- replace shower/tub valve in bath and replace surround w/ marble panels. | $30,000 |
| Sep 16, 2022 | Completed final sign-off Dec 2022 | 2659 Lombard St | unit 302: replace kitchen cabinets, counters, and appliances in kind. replace carpet and paint throughout. no wall orr llayout changes. bathrooms relace the surround w/ marble panels.Details
unit 302: replace kitchen cabinets, counters, and appliances in kind. replace carpet and paint throughout. no wall orr llayout changes. bathrooms relace the surround w/ marble panels. | $20,000 |
| Aug 16, 2022 | Completed final sign-off Mar 2023 | 3045 Jackson St | unit 504: bathroom remodel: new shower pan + tile, vanity, toilet. install new shut off valves for bathroom. kitchen: repaint cabinets + replace countertops + sink. new appliances.Details
unit 504: bathroom remodel: new shower pan + tile, vanity, toilet. install new shut off valves for bathroom. kitchen: repaint cabinets + replace countertops + sink. new appliances. | $20,000 |
| Jul 28, 2022 | Completed final sign-off Sep 2022 | 1591 Jackson St | unit #503 (condo(: replace one kitchen cabinets + countertops in-kind. replace one bathroom tile surround and tile floor in-kind. replace shower valve. carpet replacement + vanity fixtures. no electrical or structural.Details
unit #503 (condo(: replace one kitchen cabinets + countertops in-kind. replace one bathroom tile surround and tile floor in-kind. replace shower valve. carpet replacement + vanity fixtures. no electrical or structural. | $30,000 |
| Jan 20, 2021 | Completed final sign-off Mar 2021 | 901 Fell St | unit #12: remodel in kind. remove and replace kitchen cabinets in kind. remove and replace bathroom bathtub and surround. replace tub/shower valve with new single handle. electric subpanel recently upgraded with permits.Details
unit #12: remodel in kind. remove and replace kitchen cabinets in kind. remove and replace bathroom bathtub and surround. replace tub/shower valve with new single handle. electric subpanel recently upgraded with permits. | $36,800 |
| Sep 30, 2020 | Completed final sign-off Nov 2020 | 1379 10th Av | unit 15: kitchen remodel & bathroom remodel in-kind, all (e) walls & framing, all (e) rough plumbing, run new romex to kitchen circuits as required, replace cabinets, countertips, appliances, new tile flooringDetails
unit 15: kitchen remodel & bathroom remodel in-kind, all (e) walls & framing, all (e) rough plumbing, run new romex to kitchen circuits as required, replace cabinets, countertips, appliances, new tile flooring | $35,000 |
| Sep 30, 2020 | Completed final sign-off Nov 2020 | 1379 10th Av | unit 9: kitchen remodel & bathroom remodel in-kind, all (e) walls & framing, all (e) rough plumbing to remain, run new romex to kitchen circuits as required, replace cabinets, countertips, appliances, new tile flooringDetails
unit 9: kitchen remodel & bathroom remodel in-kind, all (e) walls & framing, all (e) rough plumbing to remain, run new romex to kitchen circuits as required, replace cabinets, countertips, appliances, new tile flooring | $25,000 |
| Oct 24, 2019 | Completed final sign-off Feb 2023 | 666 South Van Ness Av | kitchen and bath reomdel. no structural work no wall modification.Details
kitchen and bath reomdel. no structural work no wall modification. | $25,000 |
| Dec 27, 2017 | Completed final sign-off Feb 2018 | 1523 Taylor St | apt#5. patch & paint walls throughout. bathroom & kitchen remodel to replace (e). replace (e) hardwood in unit w/ engineered hardwood. replace door in bedroom, baseboard as needed.Details
apt#5. patch & paint walls throughout. bathroom & kitchen remodel to replace (e). replace (e) hardwood in unit w/ engineered hardwood. replace door in bedroom, baseboard as needed. | $40,000 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 31 Harriet St | #4 - replace kitchen cabinets & counters; install new outlets in kitchen to code; replace kitchen flooring w/ vinyl, kithcen sink, disposal, applicances; replace vanity sink in bath, retile shower, install new outlet & vixture in bath, paint unit. maher ord 155-13 naDetails
#4 - replace kitchen cabinets & counters; install new outlets in kitchen to code; replace kitchen flooring w/ vinyl, kithcen sink, disposal, applicances; replace vanity sink in bath, retile shower, install new outlet & vixture in bath, paint unit. maher ord 155-13 na | $15,000 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 31 Harriet St | #2 -retile shower, replace floor in both with vinyl, install vanity and sink in both,; replace vanity lights and ceiling fixture in bath. maher ord 155-13 naDetails
#2 -retile shower, replace floor in both with vinyl, install vanity and sink in both,; replace vanity lights and ceiling fixture in bath. maher ord 155-13 na | $7,500 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 33 Harriet St | #6 - replace kitchen cabinets & counters; install new outlets in kitchen to code; replace kitchen flooring - vinyl, kitchen sink, disposal, appliances. replace vanity sink in bath, retile shower, repalce tub & valve; install new outlet & fisxtures; paint unit. maher ord 155-13 naDetails
#6 - replace kitchen cabinets & counters; install new outlets in kitchen to code; replace kitchen flooring - vinyl, kitchen sink, disposal, appliances. replace vanity sink in bath, retile shower, repalce tub & valve; install new outlet & fisxtures; paint unit. maher ord 155-13 na | $15,000 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 33 Harriet St | #1 - retile shower, replace floor in bath w/ vinyl,; install new vanity & sink in bath. replace vanity lights & ceiling fixture in bath.Details
#1 - retile shower, replace floor in bath w/ vinyl,; install new vanity & sink in bath. replace vanity lights & ceiling fixture in bath. | $7,500 |