Back to kitchen remodel contractors
Christopher Gate Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Sep 2026
- Last 24 months
- 14 permits filed
178 permits since 2000: 127 completed, 15 in progress, 23 never finaled, 13 expired or cancelled.
Of the 23 never-finaled permits, 1 is 3 to 5 years old, 17 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
45 kitchen remodel permits: 39 completed, 2 in progress, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2026 | Completed final sign-off Sep 2026 | 226 Quintara St | remodel of kitchen and remodel of bathroom. no structural work and all work in kind.Details
remodel of kitchen and remodel of bathroom. no structural work and all work in kind. | $80,000 |
| Mar 20, 2025 | Completed final sign-off Feb 2026 | 1011 Church St | kitchen remodel including removal of exterior door and window and installation of (n) sliding door in same location. related structrual, electrical and plumbingDetails
kitchen remodel including removal of exterior door and window and installation of (n) sliding door in same location. related structrual, electrical and plumbing | $25,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 601 Ortega St | exploratory work including removal of some finishes, cabinetry & partial non-structural walls to single-family residence, removal of (e) fireplace in the (e) kitchen, no visible from the public right of way. no exterior work. all propsed work under separate permit, #202311171053.Details
exploratory work including removal of some finishes, cabinetry & partial non-structural walls to single-family residence, removal of (e) fireplace in the (e) kitchen, no visible from the public right of way. no exterior work. all propsed work under separate permit, #202311171053. | $2,000 |
| Nov 17, 2023 | In progress issued Jul 2024 | 601 Ortega St | remodel (e) 4-bedrooms, kitchen, living/dining rooms, (3) full bathrooms, (2) (n)powder rooms, & laundry relocation. exterior, (2) new windows east facingn & (1) (n) window west facing.Details
remodel (e) 4-bedrooms, kitchen, living/dining rooms, (3) full bathrooms, (2) (n)powder rooms, & laundry relocation. exterior, (2) new windows east facingn & (1) (n) window west facing. | $590,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2024 | 2734 Diamond St | rev pa# 202206287271: r/r (e) footings & sog in area of demo (kitchen). reframe portion of southern wall w/ inadequate (e) framing. add step between living room & kitchen to level floor. no exterior work.Details
rev pa# 202206287271: r/r (e) footings & sog in area of demo (kitchen). reframe portion of southern wall w/ inadequate (e) framing. add step between living room & kitchen to level floor. no exterior work. | $25,000 |
| Jan 12, 2023 | Completed final sign-off Sep 2023 | 144 Clipper St | revision to bpa#202210073977, interior renoto removal all (e) floor joists in kitchen currently in substandard state, frame new flooring to provide continuous floor level btwn kitchen & libraryDetails
revision to bpa#202210073977, interior renoto removal all (e) floor joists in kitchen currently in substandard state, frame new flooring to provide continuous floor level btwn kitchen & library | $1,500 |
| Oct 7, 2022 | Completed final sign-off Sep 2023 | 144 Clipper St | interior renovations of garage laundry, 1st floor kitchen and powder room, 2nd floor master suite, office and bath. exterior window replacement, new garage door, entry handrail, deck guard rails, light fixtures and paint.Details
interior renovations of garage laundry, 1st floor kitchen and powder room, 2nd floor master suite, office and bath. exterior window replacement, new garage door, entry handrail, deck guard rails, light fixtures and paint. | $700,000 |
| Aug 8, 2022 | Completed final sign-off Oct 2023 | 1779 10th Av | 1/f: new habitable space - family room, office, bathroom, laundry room. rmeodel (e) kitchen and hall bathroom on 2/f.Details
1/f: new habitable space - family room, office, bathroom, laundry room. rmeodel (e) kitchen and hall bathroom on 2/f. | $85,000 |
| Jun 28, 2022 | Completed final sign-off Apr 2024 | 2734 Diamond St | reconfigure extg kitchen and upgrade with new finishes. replace extg windows and door with new french door and window at side of house. frame as needed to support new openings. (not visible from street)Details
reconfigure extg kitchen and upgrade with new finishes. replace extg windows and door with new french door and window at side of house. frame as needed to support new openings. (not visible from street) | $120,000 |
| May 6, 2022 | Expired or cancelled expired Oct 2026 | 350 Collingwood St | add/remodel main interior stair from garage to 2nd fl.horizontal additions on the south & north sides of 1st fl,under 2nd fl overhangs. new green roof over (e)garage,raise north side entry porch to align with 1st fl level. extend(e)balcony north side 2nd fl.partial remodel of 2nd fl kitchen.Details
add/remodel main interior stair from garage to 2nd fl.horizontal additions on the south & north sides of 1st fl,under 2nd fl overhangs. new green roof over (e)garage,raise north side entry porch to align with 1st fl level. extend(e)balcony north side 2nd fl.partial remodel of 2nd fl kitchen. | $50,000 |
| Feb 8, 2022 | Completed final sign-off Jan 2023 | 3737 23rd St | partial infill of existing lighwell. remodel of two existing apartments including selected demolition of walls, doors, kitchens & baths, plus reframing of walls and new kitchens, baths, finishes, lighting.Details
partial infill of existing lighwell. remodel of two existing apartments including selected demolition of walls, doors, kitchens & baths, plus reframing of walls and new kitchens, baths, finishes, lighting. | $160,000 |
| May 24, 2021 | Never finaled issued May 2022, no final | 188 Huntington Dr | 1st fl: enlarge garage, addition toward rear yard for master bedroom suite, (n) powder, laundry & sunken patio. 2nd fl: move bedroodm 2 toward front, addition toward rear yard to accomodate kitchen & living room, deck addition & stair to rear yard, remodel bathDetails
1st fl: enlarge garage, addition toward rear yard for master bedroom suite, (n) powder, laundry & sunken patio. 2nd fl: move bedroodm 2 toward front, addition toward rear yard to accomodate kitchen & living room, deck addition & stair to rear yard, remodel bath | $80,000 |
| Nov 9, 2020 | Completed final sign-off Feb 2023 | 3625 Buchanan St | 2nd flr(two story building at rear of lot) - second floor residential remodel, with new bathroom, kitchen, and bedroom. change of use @ ground flr under pa#202009265117Details
2nd flr(two story building at rear of lot) - second floor residential remodel, with new bathroom, kitchen, and bedroom. change of use @ ground flr under pa#202009265117 | $234,000 |
| Jul 15, 2020 | Completed final sign-off Dec 2022 | 3625 Buchanan St | replace kitchen cabinets, kitchen in same location. replace tile in bath . replace flooringDetails
replace kitchen cabinets, kitchen in same location. replace tile in bath . replace flooring | $50,000 |
| Jun 30, 2020 | Completed final sign-off Oct 2021 | 1219 14th Av | (1) kitchen & (1) bath remodel inkind onlyDetails
(1) kitchen & (1) bath remodel inkind only | $80,000 |
| Dec 27, 2018 | Completed final sign-off Nov 2019 | 3021 26th Av | interior remodel at kitchen, 2 small baths and laundry, includes electrical, mechanical, plumbing upgrades as required, new ducts at garage.Details
interior remodel at kitchen, 2 small baths and laundry, includes electrical, mechanical, plumbing upgrades as required, new ducts at garage. | $150,000 |
| Aug 20, 2018 | Completed final sign-off Nov 2022 | 34 Gladys St | reconfiguration on (3) levels to add bathroom @ upper & lower level, kitchen & bath renovation @ main level. rebuild (e) decks @ rear w/ firewalls. raise roof @ upper level & (n) upper level deck.Details
reconfiguration on (3) levels to add bathroom @ upper & lower level, kitchen & bath renovation @ main level. rebuild (e) decks @ rear w/ firewalls. raise roof @ upper level & (n) upper level deck. | $600,000 |
| Jul 13, 2018 | Never finaled issued Jul 2018, no final | 2611 37th Av | kitchen remodelDetails
kitchen remodel | $25,000 |
| Jul 13, 2018 | Completed final sign-off May 2019 | 1754 25th Av | kitchen remodelDetails
kitchen remodel | $25,000 |
| Apr 23, 2018 | Completed final sign-off Feb 2020 | 855 Folsom St | unit 527: replace kitchen cabinet, new electrical lighting, kitchen remodel - no walls changed. maher ord 155-13 naDetails
unit 527: replace kitchen cabinet, new electrical lighting, kitchen remodel - no walls changed. maher ord 155-13 na | $20,000 |
| Jan 3, 2018 | Completed final sign-off May 2018 | 307 Athens St | remodel of kitchen - upgrade electrical, plumbing and cabinets. no structural work.Details
remodel of kitchen - upgrade electrical, plumbing and cabinets. no structural work. | $15,000 |
| Dec 18, 2017 | Completed final sign-off Feb 2021 | 269 Waller St | remodel of exgg s.f.d.: modify sill of extg front windows at 1st floor: infill at ground floor undedr extg 2nd floor per zaboy, convert portion of extg non habitable space on 1st floor to nw habitable space. interior remodel with nw bathrooms, kitchen remodel & nw interior stairs, nw nfpa-13 fireDetails
remodel of exgg s.f.d.: modify sill of extg front windows at 1st floor: infill at ground floor undedr extg 2nd floor per zaboy, convert portion of extg non habitable space on 1st floor to nw habitable space. interior remodel with nw bathrooms, kitchen remodel & nw interior stairs, nw nfpa-13 fire | $273,068 |
| Jul 18, 2016 | Completed final sign-off Jan 2017 | 2409 Green St | basement level-no work. level one-remodel kitchen, breakfast room and powder room. level 2- no work.Details
basement level-no work. level one-remodel kitchen, breakfast room and powder room. level 2- no work. | $105,000 |
| May 23, 2016 | Completed final sign-off Mar 2017 | 8 Sherwood Ct | 1st flr: modify (e) stair to 2nd flr. 2nd flr: reconfigure kitchen. ext work: new rear deck with stairs to grade less than 10' above grade at rear of property & w/i build site area, new replacement windows & doors. new treads & risers & handrail at front stair, replacement of stucco & fasciaDetails
1st flr: modify (e) stair to 2nd flr. 2nd flr: reconfigure kitchen. ext work: new rear deck with stairs to grade less than 10' above grade at rear of property & w/i build site area, new replacement windows & doors. new treads & risers & handrail at front stair, replacement of stucco & fascia | $150,000 |
| Jan 7, 2016 | Completed final sign-off Aug 2016 | 68 San Gabriel Av | kitchen remodel: replace cabinets, upgrade plumbing & electricalDetails
kitchen remodel: replace cabinets, upgrade plumbing & electrical | $20,000 |
| Nov 3, 2015 | Completed final sign-off Sep 2016 | 158 Precita Av | extension to existing 2nd level deck and replacement of existing 182 sf. replace existing rear door, combine kitchen and adjacent room by removing wall. add closet and relocate door at front roomDetails
extension to existing 2nd level deck and replacement of existing 182 sf. replace existing rear door, combine kitchen and adjacent room by removing wall. add closet and relocate door at front room | $50,000 |
| Aug 12, 2015 | Completed final sign-off Jul 2020 | 3704 22nd St | horizontal addition. new garage, rear addition @ 1st floor (family room) & 2nd floor (master bedroom). remodel basement, 1st floor kitchen & 2nd floor bedroom & new bathroom.Details
horizontal addition. new garage, rear addition @ 1st floor (family room) & 2nd floor (master bedroom). remodel basement, 1st floor kitchen & 2nd floor bedroom & new bathroom. | $30,000 |
| May 8, 2014 | Completed final sign-off Sep 2014 | 774 Natoma St | renovate kitchen. reconfigure kitchen, utility area at main level, remove exterior window at kitchen, relocate support for existing beam at living area. maher 155-13 not required.Details
renovate kitchen. reconfigure kitchen, utility area at main level, remove exterior window at kitchen, relocate support for existing beam at living area. maher 155-13 not required. | $60,000 |
| Oct 15, 2013 | Completed final sign-off Aug 2016 | 966 Elizabeth St | a single story g/f addition of 214 sf is proposed at the rear of the residence on the northern side. the proposed would expand upon an (e) dining area and relocate a kitchen, laundry room and wc. the addition's basement will provide a full height unconditioned storageDetails
a single story g/f addition of 214 sf is proposed at the rear of the residence on the northern side. the proposed would expand upon an (e) dining area and relocate a kitchen, laundry room and wc. the addition's basement will provide a full height unconditioned storage | $150,000 |
| Aug 14, 2013 | Completed final sign-off Jun 2014 | 2155 Buchanan St | #1- interior remodeling on ground floor: remodel kitchen & enlarge bathroom.Details
#1- interior remodeling on ground floor: remodel kitchen & enlarge bathroom. | $20,000 |
| Oct 4, 2012 | Completed final sign-off Feb 2013 | 1944 14th Av | kitchen remodeling. remodeling 1st floor rear facade: new french door and window at rear facade.Details
kitchen remodeling. remodeling 1st floor rear facade: new french door and window at rear facade. | $5,000 |
| Jul 13, 2012 | Completed final sign-off Oct 2012 | 69 Devonshire Wy | remove and replace kitchen cabinets and flooring. minor plmg and electrical upgrades. replace kitchen window in extg location. no change on walls and opening.Details
remove and replace kitchen cabinets and flooring. minor plmg and electrical upgrades. replace kitchen window in extg location. no change on walls and opening. | $15,000 |
| Feb 23, 2012 | Completed final sign-off May 2012 | 326 Marietta Dr | one kitchen replace cabinets, floor, appliances, 2 bathrooms, replace tiling, floor fixtures, upgrade plumbing and electricalDetails
one kitchen replace cabinets, floor, appliances, 2 bathrooms, replace tiling, floor fixtures, upgrade plumbing and electrical | $21,000 |
| Feb 14, 2012 | Completed final sign-off Apr 2012 | 1422 18th Av | replace kitchen cabinets and flooring upgrade plumbing and electrical; no structural work, all (n) lighting must comply with cec 150(k)Details
replace kitchen cabinets and flooring upgrade plumbing and electrical; no structural work, all (n) lighting must comply with cec 150(k) | $9,000 |
| Apr 29, 2011 | Completed final sign-off Sep 2011 | 2311 Bryant St | interior remodel. relocate (e) kitchen and bathroom, electrical, plbg,mech. relocate (e) walls. work on unit top floor.Details
interior remodel. relocate (e) kitchen and bathroom, electrical, plbg,mech. relocate (e) walls. work on unit top floor. | $35,000 |
| Mar 17, 2011 | Completed final sign-off Jun 2011 | 4150 17th St | replace kitchen cabinets, replace appliances, new tiles in kitchen & 2 baths, replace plumbing fixtures in existing location, minor electrical work. kitchen: at least 50% high efficency (he) lighting by wattage. bathroom: he or occupancy sensor, no changes to exhaust system.Details
replace kitchen cabinets, replace appliances, new tiles in kitchen & 2 baths, replace plumbing fixtures in existing location, minor electrical work. kitchen: at least 50% high efficency (he) lighting by wattage. bathroom: he or occupancy sensor, no changes to exhaust system. | $15,000 |
| May 17, 2010 | Completed final sign-off Sep 2010 | 1328 05th Av | remove (e) kitchen cabinets. upgrade electrical in kitchen & bath. remove bathroom fixtures & replace. install (n) kitchen, non-structural, in-kind. work on 1328 - 5th ave only.Details
remove (e) kitchen cabinets. upgrade electrical in kitchen & bath. remove bathroom fixtures & replace. install (n) kitchen, non-structural, in-kind. work on 1328 - 5th ave only. | $20,000 |
| Mar 11, 2010 | Completed final sign-off May 2010 | 1602 York St | unit 1602. remodel kitchen, remove and replace cabinets, new hardwood floor. 10'x12' new flourecent under cabinets lights.Details
unit 1602. remodel kitchen, remove and replace cabinets, new hardwood floor. 10'x12' new flourecent under cabinets lights. | $20,159 |
| Jun 23, 2009 | Completed final sign-off Dec 2009 | 1326 05th Av | replace sheetrock and install new kitchen cabinets. replace bathroom fixtures and install new tile. upgrade electrical.Details
replace sheetrock and install new kitchen cabinets. replace bathroom fixtures and install new tile. upgrade electrical. | $14,000 |
| Mar 13, 2008 | Expired or cancelled expired Mar 2010 | 1 19th Av | install cabinets in kitchen, install tile in 2 upstairs bathrooms/ minor electrical work. some finish plumbingDetails
install cabinets in kitchen, install tile in 2 upstairs bathrooms/ minor electrical work. some finish plumbing | $50,000 |
| Nov 20, 2007 | Completed final sign-off Mar 2008 | 160 Swiss Av | remodel kitchen. new cabinets. upgrade electrical. minor plumbing. resurface hardwood floors.Details
remodel kitchen. new cabinets. upgrade electrical. minor plumbing. resurface hardwood floors. | $12,000 |
| Jun 21, 2007 | Completed final sign-off Oct 2007 | 1526 12th Av | kitchen remodel, replace rotten stairs & landing with new deck.Details
kitchen remodel, replace rotten stairs & landing with new deck. | $30,000 |
| Jun 4, 2007 | Completed final sign-off Aug 2007 | 57 Rivoli St | replace kitchen cabinets, retile floor. move gas for stove, upgrade electric. no structural work. at least 50% lighting wattage must be fluorescent.Details
replace kitchen cabinets, retile floor. move gas for stove, upgrade electric. no structural work. at least 50% lighting wattage must be fluorescent. | $12,000 |
| Oct 24, 2005 | Completed final sign-off Feb 2006 | 546 Panorama Dr | removal & replacement of kitchen cabinets, upgrade of electrical minor plumbing work, tiling of floor, work on 2nd floorDetails
removal & replacement of kitchen cabinets, upgrade of electrical minor plumbing work, tiling of floor, work on 2nd floor | $19,000 |
| Nov 15, 2004 | Completed final sign-off Jan 2005 | 1455 15th Av | replace of kitchen cabinets, installation of new wood fl, shectrock, insolation.Details
replace of kitchen cabinets, installation of new wood fl, shectrock, insolation. | $8,000 |