Back to bathroom remodel contractors
Christopher Gate Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Sep 2026
- Last 24 months
- 14 permits filed
178 permits since 2000: 127 completed, 15 in progress, 23 never finaled, 13 expired or cancelled.
Of the 23 never-finaled permits, 1 is 3 to 5 years old, 17 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
40 bathroom remodel permits: 31 completed, 2 in progress, 2 never finaled, 5 expired or cancelled. Typically 2 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2026 | In progress issued May 2026 | 2078 45th Av | bathroom remodel on upper level (2nd story)Details
bathroom remodel on upper level (2nd story) | $50,000 |
| Jan 6, 2026 | Completed final sign-off Sep 2026 | 226 Quintara St | remodel of kitchen and remodel of bathroom. no structural work and all work in kind.Details
remodel of kitchen and remodel of bathroom. no structural work and all work in kind. | $80,000 |
| Nov 17, 2023 | In progress issued Jul 2024 | 601 Ortega St | remodel (e) 4-bedrooms, kitchen, living/dining rooms, (3) full bathrooms, (2) (n)powder rooms, & laundry relocation. exterior, (2) new windows east facingn & (1) (n) window west facing.Details
remodel (e) 4-bedrooms, kitchen, living/dining rooms, (3) full bathrooms, (2) (n)powder rooms, & laundry relocation. exterior, (2) new windows east facingn & (1) (n) window west facing. | $590,000 |
| Apr 25, 2023 | Completed final sign-off Jan 2024 | 411 Burnett Av | (1) bathroom remodel.Details
(1) bathroom remodel. | $5,500 |
| Nov 1, 2022 | Expired or cancelled expired Apr 2024 | 2078 45th Av | interior remodel on the main entry level. (n) bedroom on entry level within existing envelope (n) full bathroom on entry level within existing envelope upgrade stairs from first floor to second floor to comply with code.Details
interior remodel on the main entry level. (n) bedroom on entry level within existing envelope (n) full bathroom on entry level within existing envelope upgrade stairs from first floor to second floor to comply with code. | $50,000 |
| Oct 7, 2022 | Completed final sign-off Sep 2023 | 144 Clipper St | interior renovations of garage laundry, 1st floor kitchen and powder room, 2nd floor master suite, office and bath. exterior window replacement, new garage door, entry handrail, deck guard rails, light fixtures and paint.Details
interior renovations of garage laundry, 1st floor kitchen and powder room, 2nd floor master suite, office and bath. exterior window replacement, new garage door, entry handrail, deck guard rails, light fixtures and paint. | $700,000 |
| Sep 16, 2022 | Completed final sign-off Feb 2023 | 1612 Vallejo St | revision to bpa#202003116795, move partition wall to expand bathDetails
revision to bpa#202003116795, move partition wall to expand bath | |
| Aug 25, 2022 | Expired or cancelled expired Feb 2026 | 1612 Vallejo St | remodel (e) 2 bathrooms and rconfigure closets at 3/f. install shear wall & posts per structural drawnings. enclose laundry @ ground floor.Details
remodel (e) 2 bathrooms and rconfigure closets at 3/f. install shear wall & posts per structural drawnings. enclose laundry @ ground floor. | $35,000 |
| Aug 8, 2022 | Completed final sign-off Oct 2023 | 1779 10th Av | 1/f: new habitable space - family room, office, bathroom, laundry room. rmeodel (e) kitchen and hall bathroom on 2/f.Details
1/f: new habitable space - family room, office, bathroom, laundry room. rmeodel (e) kitchen and hall bathroom on 2/f. | $85,000 |
| Feb 8, 2022 | Completed final sign-off Jan 2023 | 3737 23rd St | partial infill of existing lighwell. remodel of two existing apartments including selected demolition of walls, doors, kitchens & baths, plus reframing of walls and new kitchens, baths, finishes, lighting.Details
partial infill of existing lighwell. remodel of two existing apartments including selected demolition of walls, doors, kitchens & baths, plus reframing of walls and new kitchens, baths, finishes, lighting. | $160,000 |
| May 24, 2021 | Never finaled issued May 2022, no final | 188 Huntington Dr | 1st fl: enlarge garage, addition toward rear yard for master bedroom suite, (n) powder, laundry & sunken patio. 2nd fl: move bedroodm 2 toward front, addition toward rear yard to accomodate kitchen & living room, deck addition & stair to rear yard, remodel bathDetails
1st fl: enlarge garage, addition toward rear yard for master bedroom suite, (n) powder, laundry & sunken patio. 2nd fl: move bedroodm 2 toward front, addition toward rear yard to accomodate kitchen & living room, deck addition & stair to rear yard, remodel bath | $80,000 |
| Nov 20, 2020 | Completed final sign-off Oct 2024 | 2105 20th St | reconfig unit 1 to contain 3 bed-2.5 baths, laundry, remod kitch, mod interior stair access to unit 1. remove (e) mezz. unit 2-replace (e) spiral stair, enclose laundry for dedicated access. unit 3-add w/d.Details
reconfig unit 1 to contain 3 bed-2.5 baths, laundry, remod kitch, mod interior stair access to unit 1. remove (e) mezz. unit 2-replace (e) spiral stair, enclose laundry for dedicated access. unit 3-add w/d. | $300,000 |
| Nov 9, 2020 | Completed final sign-off Feb 2023 | 3625 Buchanan St | 2nd flr(two story building at rear of lot) - second floor residential remodel, with new bathroom, kitchen, and bedroom. change of use @ ground flr under pa#202009265117Details
2nd flr(two story building at rear of lot) - second floor residential remodel, with new bathroom, kitchen, and bedroom. change of use @ ground flr under pa#202009265117 | $234,000 |
| Jul 15, 2020 | Completed final sign-off Dec 2022 | 3625 Buchanan St | replace kitchen cabinets, kitchen in same location. replace tile in bath . replace flooringDetails
replace kitchen cabinets, kitchen in same location. replace tile in bath . replace flooring | $50,000 |
| Jun 30, 2020 | Completed final sign-off Oct 2021 | 1219 14th Av | (1) kitchen & (1) bath remodel inkind onlyDetails
(1) kitchen & (1) bath remodel inkind only | $80,000 |
| Dec 27, 2018 | Completed final sign-off Nov 2019 | 3021 26th Av | interior remodel at kitchen, 2 small baths and laundry, includes electrical, mechanical, plumbing upgrades as required, new ducts at garage.Details
interior remodel at kitchen, 2 small baths and laundry, includes electrical, mechanical, plumbing upgrades as required, new ducts at garage. | $150,000 |
| Aug 20, 2018 | Completed final sign-off Nov 2022 | 34 Gladys St | reconfiguration on (3) levels to add bathroom @ upper & lower level, kitchen & bath renovation @ main level. rebuild (e) decks @ rear w/ firewalls. raise roof @ upper level & (n) upper level deck.Details
reconfiguration on (3) levels to add bathroom @ upper & lower level, kitchen & bath renovation @ main level. rebuild (e) decks @ rear w/ firewalls. raise roof @ upper level & (n) upper level deck. | $600,000 |
| May 14, 2018 | Expired or cancelled cancelled Jun 2022 | 1917 Stockton St | bathroom remodel, lower unitDetails
bathroom remodel, lower unit | $15,000 |
| May 7, 2018 | Expired or cancelled withdrawn May 2022 | 1917 Stockton St | ground flr remodel. upgrade bathroom. move some non bearing walls add deck and hot/cold tubs and sauna in rear yardDetails
ground flr remodel. upgrade bathroom. move some non bearing walls add deck and hot/cold tubs and sauna in rear yard | $80,000 |
| Dec 18, 2017 | Completed final sign-off Feb 2021 | 269 Waller St | remodel of exgg s.f.d.: modify sill of extg front windows at 1st floor: infill at ground floor undedr extg 2nd floor per zaboy, convert portion of extg non habitable space on 1st floor to nw habitable space. interior remodel with nw bathrooms, kitchen remodel & nw interior stairs, nw nfpa-13 fireDetails
remodel of exgg s.f.d.: modify sill of extg front windows at 1st floor: infill at ground floor undedr extg 2nd floor per zaboy, convert portion of extg non habitable space on 1st floor to nw habitable space. interior remodel with nw bathrooms, kitchen remodel & nw interior stairs, nw nfpa-13 fire | $273,068 |
| Jul 27, 2016 | Never finaled issued Jul 2016, no final | 3976 25th St | revision to pa#201411040658 & 201602109244 reconfiguration of interior space of bath, dressing, floor and wall openings on 2/f, 3/f & 4/fDetails
revision to pa#201411040658 & 201602109244 reconfiguration of interior space of bath, dressing, floor and wall openings on 2/f, 3/f & 4/f | |
| Sep 22, 2015 | Completed final sign-off Oct 2015 | 65 Eureka St | revision to app#201501276784. change location of guest bath on 2nd floor. skylight at dormer change size.; add washer & dryer to 2/fDetails
revision to app#201501276784. change location of guest bath on 2nd floor. skylight at dormer change size.; add washer & dryer to 2/f | |
| Aug 12, 2015 | Completed final sign-off Jul 2020 | 3704 22nd St | horizontal addition. new garage, rear addition @ 1st floor (family room) & 2nd floor (master bedroom). remodel basement, 1st floor kitchen & 2nd floor bedroom & new bathroom.Details
horizontal addition. new garage, rear addition @ 1st floor (family room) & 2nd floor (master bedroom). remodel basement, 1st floor kitchen & 2nd floor bedroom & new bathroom. | $30,000 |
| Jan 27, 2015 | Completed final sign-off Oct 2015 | 65 Eureka St | remodel extg bathroom at 2nd floor. convert one bathroom into 2 bathrooms. demo extg stair from 2nd to 3rd level and construct new stair from 2nd to 3rd level over extg main stair with new dormer at roof.Details
remodel extg bathroom at 2nd floor. convert one bathroom into 2 bathrooms. demo extg stair from 2nd to 3rd level and construct new stair from 2nd to 3rd level over extg main stair with new dormer at roof. | $15,000 |
| Nov 4, 2014 | Completed final sign-off Nov 2018 | 3976 25th St | (n) front stair/entry; rear addition on 2nd & 3rd fls; remodel 3rd fl bedrooms & bathrooms; remove & raise roof & add 4th level occupancy; (n) sprinkler system throughout under deferred submittal.Details
(n) front stair/entry; rear addition on 2nd & 3rd fls; remodel 3rd fl bedrooms & bathrooms; remove & raise roof & add 4th level occupancy; (n) sprinkler system throughout under deferred submittal. | $100,000 |
| Aug 14, 2013 | Completed final sign-off Jun 2014 | 2155 Buchanan St | #1- interior remodeling on ground floor: remodel kitchen & enlarge bathroom.Details
#1- interior remodeling on ground floor: remodel kitchen & enlarge bathroom. | $20,000 |
| Dec 21, 2012 | Completed final sign-off Nov 2013 | 1765 10th Av | comply with complaint 201043018: convert crawl space at rear of house to livable area. 2 new bedrooms, 1 new bath, new play room. demo e stair to garage, construct new stair to playroom/livable area from floor above. remodel main floor at stair connection for head clearances new elec/plumbDetails
comply with complaint 201043018: convert crawl space at rear of house to livable area. 2 new bedrooms, 1 new bath, new play room. demo e stair to garage, construct new stair to playroom/livable area from floor above. remodel main floor at stair connection for head clearances new elec/plumb | $95,000 |
| Feb 23, 2012 | Completed final sign-off May 2012 | 326 Marietta Dr | one kitchen replace cabinets, floor, appliances, 2 bathrooms, replace tiling, floor fixtures, upgrade plumbing and electricalDetails
one kitchen replace cabinets, floor, appliances, 2 bathrooms, replace tiling, floor fixtures, upgrade plumbing and electrical | $21,000 |
| Apr 29, 2011 | Completed final sign-off Sep 2011 | 2311 Bryant St | interior remodel. relocate (e) kitchen and bathroom, electrical, plbg,mech. relocate (e) walls. work on unit top floor.Details
interior remodel. relocate (e) kitchen and bathroom, electrical, plbg,mech. relocate (e) walls. work on unit top floor. | $35,000 |
| Mar 17, 2011 | Completed final sign-off Jun 2011 | 4150 17th St | replace kitchen cabinets, replace appliances, new tiles in kitchen & 2 baths, replace plumbing fixtures in existing location, minor electrical work. kitchen: at least 50% high efficency (he) lighting by wattage. bathroom: he or occupancy sensor, no changes to exhaust system.Details
replace kitchen cabinets, replace appliances, new tiles in kitchen & 2 baths, replace plumbing fixtures in existing location, minor electrical work. kitchen: at least 50% high efficency (he) lighting by wattage. bathroom: he or occupancy sensor, no changes to exhaust system. | $15,000 |
| Jan 18, 2011 | Completed final sign-off Jun 2011 | 636 Diamond St | remodel upstairs, 1 bathroom (2nd floor) fixtures in same location. upgrage electrical new tile. no change to wall window or door. lighting to comply w/ cec 150(k).Details
remodel upstairs, 1 bathroom (2nd floor) fixtures in same location. upgrage electrical new tile. no change to wall window or door. lighting to comply w/ cec 150(k). | $17,000 |
| May 17, 2010 | Completed final sign-off Sep 2010 | 1328 05th Av | remove (e) kitchen cabinets. upgrade electrical in kitchen & bath. remove bathroom fixtures & replace. install (n) kitchen, non-structural, in-kind. work on 1328 - 5th ave only.Details
remove (e) kitchen cabinets. upgrade electrical in kitchen & bath. remove bathroom fixtures & replace. install (n) kitchen, non-structural, in-kind. work on 1328 - 5th ave only. | $20,000 |
| Jul 27, 2009 | Completed final sign-off Aug 2011 | 1455 15th Av | provide new media room and bathroom at 1st. floor. provide new laundry and windows.Details
provide new media room and bathroom at 1st. floor. provide new laundry and windows. | $40,000 |
| Jun 23, 2009 | Completed final sign-off Dec 2009 | 1326 05th Av | replace sheetrock and install new kitchen cabinets. replace bathroom fixtures and install new tile. upgrade electrical.Details
replace sheetrock and install new kitchen cabinets. replace bathroom fixtures and install new tile. upgrade electrical. | $14,000 |
| Jun 2, 2009 | Completed final sign-off Sep 2009 | 160 Swiss Av | replace plumbing fixtures in bathroom. remove bath, install shower, install wet bar. remove sheetrock to insatll insulation. new hardwood flooring. no structural work.Details
replace plumbing fixtures in bathroom. remove bath, install shower, install wet bar. remove sheetrock to insatll insulation. new hardwood flooring. no structural work. | $10,000 |
| Feb 24, 2009 | Completed final sign-off Apr 2009 | 1363 16th Av | revision to 200812239121: move 2 walls to enlarge bath and closet, add 1 closet, retile, lay down floors, move outlets, add new tub/toilet, sink, convert den to bedroom.Details
revision to 200812239121: move 2 walls to enlarge bath and closet, add 1 closet, retile, lay down floors, move outlets, add new tub/toilet, sink, convert den to bedroom. | $6,000 |
| Mar 13, 2008 | Expired or cancelled expired Mar 2010 | 1 19th Av | install cabinets in kitchen, install tile in 2 upstairs bathrooms/ minor electrical work. some finish plumbingDetails
install cabinets in kitchen, install tile in 2 upstairs bathrooms/ minor electrical work. some finish plumbing | $50,000 |
| Jan 25, 2007 | Completed final sign-off Aug 2007 | 1943 Grove St | remodel existing lower level of condo for a family room and a bath and add internal stair to connect to upper levelDetails
remodel existing lower level of condo for a family room and a bath and add internal stair to connect to upper level | $10,000 |
| Dec 6, 2006 | Completed final sign-off May 2007 | 1456 15th Av | remodel lowest level to add 2 bedrooms, full bath, hallway,laundry, 1 car garage to remainDetails
remodel lowest level to add 2 bedrooms, full bath, hallway,laundry, 1 car garage to remain | $80,000 |
| Feb 2, 2006 | Completed final sign-off May 2006 | 54 Anzavista Av | remodel bathroom at 3rd floor. new lighting.Details
remodel bathroom at 3rd floor. new lighting. | $15,000 |