Back to kitchen remodel contractors
Chen's Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Jan 2012
- Last 24 months
- 0 permits filed
35 permits since 2000: 27 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 83 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2009 | Completed final sign-off Nov 2009 | 793 Chenery St | remodel (e) kitchen in unit 793. change new cabinet, dishwasher, disposal, new sink, gas range, fan, circuits and outlets in kitchen. change one window at rear, and replace interior sliding door. remove and replace sheetrock.Details
remodel (e) kitchen in unit 793. change new cabinet, dishwasher, disposal, new sink, gas range, fan, circuits and outlets in kitchen. change one window at rear, and replace interior sliding door. remove and replace sheetrock. | $13,500 |
| May 1, 2008 | Completed final sign-off Aug 2008 | 5108 Diamond Heights Bl | kitchen alteration to include new countertop,cabinets,sink appliances and finishes.upgrade electrical circuits and receptacles.new floor & wall tile, master bathroom alteration to include unit#b. new fixtures,vanity and finishes.Details
kitchen alteration to include new countertop,cabinets,sink appliances and finishes.upgrade electrical circuits and receptacles.new floor & wall tile, master bathroom alteration to include unit#b. new fixtures,vanity and finishes. | $35,000 |
| Aug 3, 2007 | Never finaled issued Aug 2007, no final | 886 Fell St | 888 top unit: bathroom kitchen, laundry room by permit inpsecttions. 886 lower unit: bathroom by permit inspections. replace new gas pipes in the fire place. common areas: remove 2 (e) electrical meters to outside wall. one new electrical house meters for garage outlets and light cover plusterDetails
888 top unit: bathroom kitchen, laundry room by permit inpsecttions. 886 lower unit: bathroom by permit inspections. replace new gas pipes in the fire place. common areas: remove 2 (e) electrical meters to outside wall. one new electrical house meters for garage outlets and light cover pluster | $12,000 |
| Jul 23, 2007 | Completed final sign-off Oct 2007 | 949 Elizabeth St | repair kitchen. change new cabinets new counter top. electrical work, kitchen put new lighting and new outlet. change panels and circuits, plmg work for kitchen, change new sink, new stove grabage disposal. dishwasher faucet and hood fix gas piper. no structural. 50% lighting to be fluorescentDetails
repair kitchen. change new cabinets new counter top. electrical work, kitchen put new lighting and new outlet. change panels and circuits, plmg work for kitchen, change new sink, new stove grabage disposal. dishwasher faucet and hood fix gas piper. no structural. 50% lighting to be fluorescent | $8,000 |
| Apr 11, 2007 | Completed final sign-off Jun 2007 | 393 Crescent Av | kitchen repair. change new cabinets. ,countertop, elec,plumbing. hood. no change to existing lighting. gfi outlets.Details
kitchen repair. change new cabinets. ,countertop, elec,plumbing. hood. no change to existing lighting. gfi outlets. | $6,500 |
| Apr 19, 2005 | Completed final sign-off Aug 2005 | 886 Fell St | kitchen work: change new cabinet, hood, top, sink. disposal dishwasher. new stove. washer and dryer.Details
kitchen work: change new cabinet, hood, top, sink. disposal dishwasher. new stove. washer and dryer. | $4,000 |
| Oct 27, 2003 | Completed final sign-off Jan 2004 | 1409 Guerrero St | repair two bathrooms and kitchen and plumbing and electricalDetails
repair two bathrooms and kitchen and plumbing and electrical | $20,000 |