Back to bathroom remodel contractors
Chen's Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Jan 2012
- Last 24 months
- 0 permits filed
35 permits since 2000: 27 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 85 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2010 | Completed final sign-off Oct 2010 | 247 Lake Merced Hill No Bl | 2 bathrooms repair work, change existing bathrub, shower, toilet fixture, sink, tile.Details
2 bathrooms repair work, change existing bathrub, shower, toilet fixture, sink, tile. | $10,000 |
| May 1, 2008 | Completed final sign-off Aug 2008 | 5108 Diamond Heights Bl | kitchen alteration to include new countertop,cabinets,sink appliances and finishes.upgrade electrical circuits and receptacles.new floor & wall tile, master bathroom alteration to include unit#b. new fixtures,vanity and finishes.Details
kitchen alteration to include new countertop,cabinets,sink appliances and finishes.upgrade electrical circuits and receptacles.new floor & wall tile, master bathroom alteration to include unit#b. new fixtures,vanity and finishes. | $35,000 |
| Aug 3, 2007 | Never finaled issued Aug 2007, no final | 886 Fell St | 888 top unit: bathroom kitchen, laundry room by permit inpsecttions. 886 lower unit: bathroom by permit inspections. replace new gas pipes in the fire place. common areas: remove 2 (e) electrical meters to outside wall. one new electrical house meters for garage outlets and light cover plusterDetails
888 top unit: bathroom kitchen, laundry room by permit inpsecttions. 886 lower unit: bathroom by permit inspections. replace new gas pipes in the fire place. common areas: remove 2 (e) electrical meters to outside wall. one new electrical house meters for garage outlets and light cover pluster | $12,000 |
| Feb 10, 2006 | Completed final sign-off May 2006 | 4043 19th St | repair bathroom change tile bathtub sink fan toilet faucet/drywall electrical and plmbg work flourescent lightingDetails
repair bathroom change tile bathtub sink fan toilet faucet/drywall electrical and plmbg work flourescent lighting | $5,000 |
| Sep 7, 2005 | Completed final sign-off Jan 2006 | 556 29th St | repair bathroom: change new sink, tile, toilet fixturesDetails
repair bathroom: change new sink, tile, toilet fixtures | $40,000 |
| Oct 27, 2003 | Completed final sign-off Jan 2004 | 1409 Guerrero St | repair two bathrooms and kitchen and plumbing and electricalDetails
repair two bathrooms and kitchen and plumbing and electrical | $20,000 |
| Oct 24, 2001 | Completed final sign-off Dec 2001 | 693 14th Av | repair the bathroom new tile, change new bathtub, new sink,new faucet, change electl outletDetails
repair the bathroom new tile, change new bathtub, new sink,new faucet, change electl outlet | $2,800 |
| Oct 11, 2001 | Expired or cancelled expired Feb 2002 | 691 14th Av | repair the bathrm tle. change new bath tub, sin,fauct, change electrical outletDetails
repair the bathrm tle. change new bath tub, sin,fauct, change electrical outlet | $2,800 |