Back to kitchen remodel contractors
Cepheus Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Sep 2025
- Last 24 months
- 4 permits filed
118 permits since 2000: 91 completed, 2 in progress, 11 never finaled, 14 expired or cancelled.
Of the 11 never-finaled permits, 5 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
42 kitchen remodel permits: 33 completed, 1 in progress, 4 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 23, 2025 | In progress issued Feb 2026 | 2625 San Jose Av | convert garage to new adu per planning code sec.207.2 (state adu) to add unit# 5. add new kitchen.Details
convert garage to new adu per planning code sec.207.2 (state adu) to add unit# 5. add new kitchen. | $50,000 |
| Jan 3, 2025 | Completed final sign-off May 2025 | 595 Arguello Bl | unit 1: kitchen cabinets and 1 bathroom remodel, new flooring, upgrade all angle stops, new shower / tub valve, new bathtub, new paint, new sound proof insulation, new insulation in exterior walls. replace drywall at walls and ceilings with new 5/8" type'x'. no new walls no change to egress.Details
unit 1: kitchen cabinets and 1 bathroom remodel, new flooring, upgrade all angle stops, new shower / tub valve, new bathtub, new paint, new sound proof insulation, new insulation in exterior walls. replace drywall at walls and ceilings with new 5/8" type'x'. no new walls no change to egress. | $40,000 |
| Aug 3, 2023 | Completed final sign-off Dec 2023 | 1001 Pine St | unit# 912 only. full remodel of studio condo: new bath and kitchen and closet. all within same 4 walls and interior walls. no walls changes.Details
unit# 912 only. full remodel of studio condo: new bath and kitchen and closet. all within same 4 walls and interior walls. no walls changes. | $56,000 |
| Dec 14, 2022 | Completed final sign-off Aug 2024 | 834 31st Av | remodeling existing kitchen & bathroom; 2nd fl - new skylights level 0 or ground floor finishing level to include heated living space of 2 bedrooms, bathroom, storage, mechanical, great room, windowsDetails
remodeling existing kitchen & bathroom; 2nd fl - new skylights level 0 or ground floor finishing level to include heated living space of 2 bedrooms, bathroom, storage, mechanical, great room, windows | $62,000 |
| May 11, 2022 | Completed final sign-off Oct 2022 | 595 Arguello Bl | apt #6: remodel kitchen within same 4 walls - in kind. new: cabinets, countertop, sink/faucet, appliances, flooring.Details
apt #6: remodel kitchen within same 4 walls - in kind. new: cabinets, countertop, sink/faucet, appliances, flooring. | $23,900 |
| Mar 17, 2022 | Completed final sign-off Aug 2022 | 1001 Pine St | unit #1205: kitchen remodel in kind. new cabinets, countertop, flooring, appliances. no wall alteration.Details
unit #1205: kitchen remodel in kind. new cabinets, countertop, flooring, appliances. no wall alteration. | $21,145 |
| Jun 22, 2021 | Completed final sign-off Dec 2021 | 2111 Hyde St | remodel one kitchen with in same four walls. new cabinets, tiles, countertop, sink/faucet, electric stove, sheetrock, recessed fixtures, and paintDetails
remodel one kitchen with in same four walls. new cabinets, tiles, countertop, sink/faucet, electric stove, sheetrock, recessed fixtures, and paint | $47,300 |
| Jun 4, 2021 | Completed final sign-off Sep 2021 | 1001 Pine St | unit 1210: remodel 1 kitchen and 1 bathroom, new flooring, appliances and paint, new bath tub and plumbing fixtures, move breaker panel out of closet. moving no walls, all work within existing walls. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3 & (k) 5Details
unit 1210: remodel 1 kitchen and 1 bathroom, new flooring, appliances and paint, new bath tub and plumbing fixtures, move breaker panel out of closet. moving no walls, all work within existing walls. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3 & (k) 5 | $28,300 |
| Feb 11, 2021 | Completed final sign-off May 2021 | 1001 Pine St | remodel studio condo: new kitchen cabinets, appliances, sink-faucet, countertop. new bathroom tub, faucets, tile, vanity, sink. whole unit: painting, floating wood flor. no walls are being moved or altered.Details
remodel studio condo: new kitchen cabinets, appliances, sink-faucet, countertop. new bathroom tub, faucets, tile, vanity, sink. whole unit: painting, floating wood flor. no walls are being moved or altered. | $41,000 |
| Jun 22, 2020 | Completed final sign-off Oct 2020 | 2750 Market St | unit 301: new flooring, carpet and hardwood. reface kitchen cabinets. new stone counter tops in kitchen. new appliances in kitchen.Details
unit 301: new flooring, carpet and hardwood. reface kitchen cabinets. new stone counter tops in kitchen. new appliances in kitchen. | $48,000 |
| May 27, 2020 | Completed final sign-off Oct 2020 | 2111 Hyde St | unit 200. update unit: bring electrical up to code, repair plaster walls/ceilings, refinish wood floors, tile floor in toilet room, tile back splash in kitchen, new appliances, paint whole unit. all work within existing walls, no wall changes. remodel work in-kind.Details
unit 200. update unit: bring electrical up to code, repair plaster walls/ceilings, refinish wood floors, tile floor in toilet room, tile back splash in kitchen, new appliances, paint whole unit. all work within existing walls, no wall changes. remodel work in-kind. | $36,700 |
| Nov 15, 2019 | Completed final sign-off May 2020 | 1329 Pierce St | remodel kitchen: flooring, cabinets, countertops, electrical, plumbing within the same 4 wallsDetails
remodel kitchen: flooring, cabinets, countertops, electrical, plumbing within the same 4 walls | $23,500 |
| Jan 25, 2019 | Completed final sign-off Nov 2019 | 399 Upper Tr | main kitchen, remodel e kitchen. work to include demo and new construction ,plumbing, lighting, finishes, millwork/cabinetryDetails
main kitchen, remodel e kitchen. work to include demo and new construction ,plumbing, lighting, finishes, millwork/cabinetry | $56,000 |
| Jul 16, 2018 | Completed final sign-off Apr 2019 | 1001 Pine St | apt 1309: remodel kitchen: new cabinets, sink/faucet, countertops, appliances. new floating floor,painting whole unit.Details
apt 1309: remodel kitchen: new cabinets, sink/faucet, countertops, appliances. new floating floor,painting whole unit. | $48,000 |
| Apr 18, 2018 | Completed final sign-off May 2019 | 189 College Av | remodel kitchen, add washer and dryer, new bathroom vanity, new flooring. all unit #3: within the existing walls.Details
remodel kitchen, add washer and dryer, new bathroom vanity, new flooring. all unit #3: within the existing walls. | $49,500 |
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 1001 Pine St | repair from flood damage, new tile floor kitchen & hallway, repair plaster ceiling, new carpet & pad, paint damaged areasDetails
repair from flood damage, new tile floor kitchen & hallway, repair plaster ceiling, new carpet & pad, paint damaged areas | $13,700 |
| Feb 8, 2018 | Completed final sign-off Sep 2018 | 1001 Pine St | remodel existing kitchen and bathroom. move breaker panelDetails
remodel existing kitchen and bathroom. move breaker panel | $62,000 |
| Sep 27, 2017 | Never finaled issued Sep 2017, no final | 3392 16th St | remodel existing kitchen and laundry room. all within the existing walls; new cabinets, counter top, dishwasher, garbage disposal, gas stove, new flooring. new sink in half bathroom.Details
remodel existing kitchen and laundry room. all within the existing walls; new cabinets, counter top, dishwasher, garbage disposal, gas stove, new flooring. new sink in half bathroom. | $31,200 |
| Apr 10, 2017 | Completed final sign-off May 2017 | 1001 Pine St | remodel kitchen only: cabinets, countertop, electrical, flooring, appliances.Details
remodel kitchen only: cabinets, countertop, electrical, flooring, appliances. | $17,800 |
| Sep 8, 2016 | Completed final sign-off Nov 2016 | 1001 Pine St | #809 - remodel kitchen only. all work in kind.Details
#809 - remodel kitchen only. all work in kind. | $23,800 |
| Mar 4, 2016 | Completed final sign-off Aug 2016 | 2257 Fulton St | remodeling existing bathroom, laundry room and kitchenDetails
remodeling existing bathroom, laundry room and kitchen | $85,000 |
| Nov 25, 2015 | Completed final sign-off Jun 2016 | 1001 Pine St | unit 703: remodel bathroom & kitchen within (e) envelope. no expansion.Details
unit 703: remodel bathroom & kitchen within (e) envelope. no expansion. | $41,500 |
| Aug 25, 2015 | Completed final sign-off Mar 2016 | 1001 Pine St | remodel kitchen : new cabinets, countertop, faucet, applicances, flooring; remodel 1 bathroom: new shower, tile work, shower valve, low flow toilet, vanity, sink, faucet.Details
remodel kitchen : new cabinets, countertop, faucet, applicances, flooring; remodel 1 bathroom: new shower, tile work, shower valve, low flow toilet, vanity, sink, faucet. | $48,250 |
| Mar 23, 2015 | Completed final sign-off May 2015 | 1001 Pine St | #1211 - bathroom - new cuntertop, sink, faucet, low flow toilet; kitchen - new cuntertops, sink , faucet. all to comply with cec150.0(k)3 & 5Details
#1211 - bathroom - new cuntertop, sink, faucet, low flow toilet; kitchen - new cuntertops, sink , faucet. all to comply with cec150.0(k)3 & 5 | $13,000 |
| Feb 20, 2015 | Completed final sign-off Aug 2015 | 1001 Pine St | unit 1408: remodel of kitchen and new stone countertops, sink, faucet. remodel bathroom and new shower, tile walls and floor, sink, and faucet. new wood floating floor and paint unit.Details
unit 1408: remodel of kitchen and new stone countertops, sink, faucet. remodel bathroom and new shower, tile walls and floor, sink, and faucet. new wood floating floor and paint unit. | $49,700 |
| Feb 20, 2015 | Completed final sign-off Aug 2015 | 1001 Pine St | unit 401: remodel part of kitchen and new stone countertops, sink, faucet. remodel bathroom and new shower, tile walls and floor, sink, and faucet.Details
unit 401: remodel part of kitchen and new stone countertops, sink, faucet. remodel bathroom and new shower, tile walls and floor, sink, and faucet. | $32,300 |
| Dec 3, 2014 | Never finaled issued Dec 2014, no final | 2625 San Jose Av | unit 3: repair water damage to both bathrooms floors. repair water damage to under kitchen sink. rpair leaks to skylights.Details
unit 3: repair water damage to both bathrooms floors. repair water damage to under kitchen sink. rpair leaks to skylights. | $7,800 |
| Sep 17, 2014 | Completed final sign-off Jan 2015 | 1001 Pine St | remodel kitchen and bathroom. new floating wood floor. paint whole unit.Details
remodel kitchen and bathroom. new floating wood floor. paint whole unit. | $29,300 |
| Mar 25, 2014 | Completed final sign-off Sep 2014 | 3037 Clay St | remodel kitchen only.Details
remodel kitchen only. | $19,500 |
| Dec 18, 2013 | Expired or cancelled expired Nov 2017 | 1001 Pine St | new kitchen cabinets, sink, faucet, remove closet shelving, new bamboo floating floor.Details
new kitchen cabinets, sink, faucet, remove closet shelving, new bamboo floating floor. | $9,240 |
| Aug 26, 2013 | Expired or cancelled expired Nov 2017 | 1001 Pine St | remodel kitchen: new cabinets & countertop, new sink, new gfi'sDetails
remodel kitchen: new cabinets & countertop, new sink, new gfi's | $7,900 |
| May 29, 2013 | Completed final sign-off Dec 2013 | 175 Corona St | remodel kitchen in kindDetails
remodel kitchen in kind | $28,230 |
| Aug 4, 2009 | Completed final sign-off Nov 2009 | 330 Cabrillo St | kitchen remodel in same space. in back entry room add use as laundry room, new water heater and spacae for washer and dryer. new doorway from hall to laundry room.Details
kitchen remodel in same space. in back entry room add use as laundry room, new water heater and spacae for washer and dryer. new doorway from hall to laundry room. | $47,100 |
| Jun 8, 2007 | Completed final sign-off Feb 2008 | 976 Clayton St | remodel kitchen, build new closets in bedroom and hall, build new laundry, install lights in hall.Details
remodel kitchen, build new closets in bedroom and hall, build new laundry, install lights in hall. | $50,000 |
| Nov 8, 2004 | Completed final sign-off Apr 2005 | 182 15th Av | remodel 2 kitchens. cabinets, countertops, elec, plumb, new appliances. remodel 2 baths, new flooriDetails
remodel 2 kitchens. cabinets, countertops, elec, plumb, new appliances. remodel 2 baths, new floori | $120,000 |
| May 17, 2004 | Expired or cancelled expired Jul 2005 | 245 Leavenworth St | remodel kitchen & bathroom in unit#21, new electrical & plumbing & cabinets in kitchen. bathroom newDetails
remodel kitchen & bathroom in unit#21, new electrical & plumbing & cabinets in kitchen. bathroom new | $7,800 |
| May 12, 2004 | Expired or cancelled expired Jul 2005 | 245 Leavenworth St | to comply with nov 200230458 work includes removing closet and kitchen in basement in exist bath,Details
to comply with nov 200230458 work includes removing closet and kitchen in basement in exist bath, | $1,700 |
| Mar 12, 2004 | Never finaled issued Mar 2004, no final | 245 Leavenworth St | remodel kitchen & bathroom in unit #31. new elec & plumbing & cabinet in kitchen. bathrm new showerDetails
remodel kitchen & bathroom in unit #31. new elec & plumbing & cabinet in kitchen. bathrm new shower | $7,800 |
| May 8, 2003 | Completed final sign-off Oct 2003 | 415 Douglass St | remodel extng kitchen,new appliances,cabinets,electrical,plumbing,& countertops. all work w/in extngDetails
remodel extng kitchen,new appliances,cabinets,electrical,plumbing,& countertops. all work w/in extng | $20,000 |
| Apr 28, 2003 | Completed final sign-off Sep 2003 | 2111 Franklin St | #8- remodel kitchen within same 4 walls, new cabinets/appliances/counter top/sink & faucet.Details
#8- remodel kitchen within same 4 walls, new cabinets/appliances/counter top/sink & faucet. | $47,000 |
| Sep 18, 2002 | Completed final sign-off Jan 2003 | 3294 Clay St | #3- remodel kitchen, & install electric towel warmer in bathroomDetails
#3- remodel kitchen, & install electric towel warmer in bathroom | $18,000 |
| Apr 24, 2001 | Completed final sign-off Nov 2001 | 937 Lake St | remodel kitchen, new elec,plumb new elec study, office, bedroom and builtin cab and/or desk no strucDetails
remodel kitchen, new elec,plumb new elec study, office, bedroom and builtin cab and/or desk no struc | $87,500 |