Back to bathroom remodel contractors
Cepheus Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Sep 2025
- Last 24 months
- 4 permits filed
118 permits since 2000: 91 completed, 2 in progress, 11 never finaled, 14 expired or cancelled.
Of the 11 never-finaled permits, 5 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
37 bathroom remodel permits: 30 completed, 3 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2025 | Completed final sign-off May 2025 | 595 Arguello Bl | unit 1: kitchen cabinets and 1 bathroom remodel, new flooring, upgrade all angle stops, new shower / tub valve, new bathtub, new paint, new sound proof insulation, new insulation in exterior walls. replace drywall at walls and ceilings with new 5/8" type'x'. no new walls no change to egress.Details
unit 1: kitchen cabinets and 1 bathroom remodel, new flooring, upgrade all angle stops, new shower / tub valve, new bathtub, new paint, new sound proof insulation, new insulation in exterior walls. replace drywall at walls and ceilings with new 5/8" type'x'. no new walls no change to egress. | $40,000 |
| Aug 3, 2023 | Completed final sign-off Dec 2023 | 1001 Pine St | unit# 912 only. full remodel of studio condo: new bath and kitchen and closet. all within same 4 walls and interior walls. no walls changes.Details
unit# 912 only. full remodel of studio condo: new bath and kitchen and closet. all within same 4 walls and interior walls. no walls changes. | $56,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 55 Sea View Tr | top floor bathroom: new shower, vanities, faucet, tile floor, insulate outside walls - all within same 4 walls. top floor baster bedroom: new sheetrock, lighting, closets, insulate outside walls- all within same 4 walls.Details
top floor bathroom: new shower, vanities, faucet, tile floor, insulate outside walls - all within same 4 walls. top floor baster bedroom: new sheetrock, lighting, closets, insulate outside walls- all within same 4 walls. | $19,300 |
| Jun 30, 2023 | Completed final sign-off Feb 2024 | 3711 Clay St | remodel one top floor bathroom: new shower, move toilet, new sink, vanity, faucets, new fan, new lighting - all with in same 4 walls.Details
remodel one top floor bathroom: new shower, move toilet, new sink, vanity, faucets, new fan, new lighting - all with in same 4 walls. | $15,700 |
| Dec 14, 2022 | Completed final sign-off Aug 2024 | 834 31st Av | remodeling existing kitchen & bathroom; 2nd fl - new skylights level 0 or ground floor finishing level to include heated living space of 2 bedrooms, bathroom, storage, mechanical, great room, windowsDetails
remodeling existing kitchen & bathroom; 2nd fl - new skylights level 0 or ground floor finishing level to include heated living space of 2 bedrooms, bathroom, storage, mechanical, great room, windows | $62,000 |
| Dec 12, 2022 | Completed final sign-off Jun 2023 | 3139 Octavia St | remodel the only bathroom within the (e) 4 walls: tub, sink, toilet, sheetrock, shower valve, vent, paint, vanity.Details
remodel the only bathroom within the (e) 4 walls: tub, sink, toilet, sheetrock, shower valve, vent, paint, vanity. | $22,000 |
| Jun 4, 2021 | Completed final sign-off Sep 2021 | 1001 Pine St | unit 1210: remodel 1 kitchen and 1 bathroom, new flooring, appliances and paint, new bath tub and plumbing fixtures, move breaker panel out of closet. moving no walls, all work within existing walls. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3 & (k) 5Details
unit 1210: remodel 1 kitchen and 1 bathroom, new flooring, appliances and paint, new bath tub and plumbing fixtures, move breaker panel out of closet. moving no walls, all work within existing walls. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3 & (k) 5 | $28,300 |
| Feb 11, 2021 | Completed final sign-off May 2021 | 1001 Pine St | remodel studio condo: new kitchen cabinets, appliances, sink-faucet, countertop. new bathroom tub, faucets, tile, vanity, sink. whole unit: painting, floating wood flor. no walls are being moved or altered.Details
remodel studio condo: new kitchen cabinets, appliances, sink-faucet, countertop. new bathroom tub, faucets, tile, vanity, sink. whole unit: painting, floating wood flor. no walls are being moved or altered. | $41,000 |
| Feb 4, 2021 | Completed final sign-off May 2021 | 2111 Hyde St | #306: remodel hallway bathroom: replace sink, faucet, vanity, mirror, lighting, tile, refinish tub. no walls will be moved or altered.Details
#306: remodel hallway bathroom: replace sink, faucet, vanity, mirror, lighting, tile, refinish tub. no walls will be moved or altered. | $27,700 |
| Apr 18, 2018 | Completed final sign-off May 2019 | 189 College Av | remodel kitchen, add washer and dryer, new bathroom vanity, new flooring. all unit #3: within the existing walls.Details
remodel kitchen, add washer and dryer, new bathroom vanity, new flooring. all unit #3: within the existing walls. | $49,500 |
| Feb 8, 2018 | Completed final sign-off Sep 2018 | 1001 Pine St | remodel existing kitchen and bathroom. move breaker panelDetails
remodel existing kitchen and bathroom. move breaker panel | $62,000 |
| Sep 27, 2017 | Never finaled issued Sep 2017, no final | 3392 16th St | remodel existing kitchen and laundry room. all within the existing walls; new cabinets, counter top, dishwasher, garbage disposal, gas stove, new flooring. new sink in half bathroom.Details
remodel existing kitchen and laundry room. all within the existing walls; new cabinets, counter top, dishwasher, garbage disposal, gas stove, new flooring. new sink in half bathroom. | $31,200 |
| May 23, 2017 | Completed final sign-off Sep 2017 | 1001 Pine St | remodel bathroom, new shower, toilet, vanity, tile walls and floorDetails
remodel bathroom, new shower, toilet, vanity, tile walls and floor | $14,800 |
| Mar 4, 2016 | Completed final sign-off Aug 2016 | 2257 Fulton St | remodeling existing bathroom, laundry room and kitchenDetails
remodeling existing bathroom, laundry room and kitchen | $85,000 |
| Mar 4, 2016 | Completed final sign-off Nov 2016 | 1001 Pine St | remodel bathroom onlyDetails
remodel bathroom only | $22,000 |
| Nov 25, 2015 | Completed final sign-off Jun 2016 | 1001 Pine St | unit 703: remodel bathroom & kitchen within (e) envelope. no expansion.Details
unit 703: remodel bathroom & kitchen within (e) envelope. no expansion. | $41,500 |
| Aug 25, 2015 | Completed final sign-off Mar 2016 | 1001 Pine St | remodel kitchen : new cabinets, countertop, faucet, applicances, flooring; remodel 1 bathroom: new shower, tile work, shower valve, low flow toilet, vanity, sink, faucet.Details
remodel kitchen : new cabinets, countertop, faucet, applicances, flooring; remodel 1 bathroom: new shower, tile work, shower valve, low flow toilet, vanity, sink, faucet. | $48,250 |
| Aug 10, 2015 | Completed final sign-off Dec 2015 | 1001 Pine St | remodel bathroom only: new shower, tile work, shower valve, low flow toilet, new elect. wall fixture, towel warmer.Details
remodel bathroom only: new shower, tile work, shower valve, low flow toilet, new elect. wall fixture, towel warmer. | $18,250 |
| Mar 23, 2015 | Completed final sign-off May 2015 | 1001 Pine St | #1211 - bathroom - new cuntertop, sink, faucet, low flow toilet; kitchen - new cuntertops, sink , faucet. all to comply with cec150.0(k)3 & 5Details
#1211 - bathroom - new cuntertop, sink, faucet, low flow toilet; kitchen - new cuntertops, sink , faucet. all to comply with cec150.0(k)3 & 5 | $13,000 |
| Feb 20, 2015 | Completed final sign-off Aug 2015 | 1001 Pine St | unit 1408: remodel of kitchen and new stone countertops, sink, faucet. remodel bathroom and new shower, tile walls and floor, sink, and faucet. new wood floating floor and paint unit.Details
unit 1408: remodel of kitchen and new stone countertops, sink, faucet. remodel bathroom and new shower, tile walls and floor, sink, and faucet. new wood floating floor and paint unit. | $49,700 |
| Feb 20, 2015 | Completed final sign-off Aug 2015 | 1001 Pine St | unit 401: remodel part of kitchen and new stone countertops, sink, faucet. remodel bathroom and new shower, tile walls and floor, sink, and faucet.Details
unit 401: remodel part of kitchen and new stone countertops, sink, faucet. remodel bathroom and new shower, tile walls and floor, sink, and faucet. | $32,300 |
| Dec 3, 2014 | Never finaled issued Dec 2014, no final | 2625 San Jose Av | unit 3: repair water damage to both bathrooms floors. repair water damage to under kitchen sink. rpair leaks to skylights.Details
unit 3: repair water damage to both bathrooms floors. repair water damage to under kitchen sink. rpair leaks to skylights. | $7,800 |
| Sep 17, 2014 | Completed final sign-off Jan 2015 | 1001 Pine St | remodel kitchen and bathroom. new floating wood floor. paint whole unit.Details
remodel kitchen and bathroom. new floating wood floor. paint whole unit. | $29,300 |
| Sep 3, 2014 | Completed final sign-off Nov 2014 | 1001 Pine St | remodel bathroom only: new low flow toilet, new faucet at sink, new vanity and vanity top, new ceramic floor tile, new gfi receptacle, new wall fixtures, paint whole bathroom, no walls moved, removed or added. tub to remain. all layouts unchangedDetails
remodel bathroom only: new low flow toilet, new faucet at sink, new vanity and vanity top, new ceramic floor tile, new gfi receptacle, new wall fixtures, paint whole bathroom, no walls moved, removed or added. tub to remain. all layouts unchanged | $10,500 |
| Sep 9, 2013 | Completed final sign-off Dec 2013 | 1001 Pine St | bathroom & new tile floor, vanity, faucet, sink, low flow toilet. new carpet, paint whole unit. new gfi's.Details
bathroom & new tile floor, vanity, faucet, sink, low flow toilet. new carpet, paint whole unit. new gfi's. | $7,500 |
| Aug 26, 2013 | Completed final sign-off Dec 2013 | 1001 Pine St | studio condo: bathroom-new vanity, sink, faucet, tile floor. wc replace all switches & receptacles with new in white. no tub/shower or surround work.Details
studio condo: bathroom-new vanity, sink, faucet, tile floor. wc replace all switches & receptacles with new in white. no tub/shower or surround work. | $3,350 |
| Aug 29, 2011 | Completed final sign-off Oct 2011 | 3037 Clay St | remodel 1 bathroom, new valves, tile, lighting, sink, vanity, fan, refinish existing tub. no change to walls. all work within existing four walls. bath is on top unitDetails
remodel 1 bathroom, new valves, tile, lighting, sink, vanity, fan, refinish existing tub. no change to walls. all work within existing four walls. bath is on top unit | $15,497 |
| Oct 24, 2008 | Completed final sign-off Feb 2009 | 167 Corona St | new bathroom w/linen closet in same location as (e) bathroom, new built in cabinets at fireplace in living room, new replacement windows on side of house, insulate open walls, attic and some floor area. refinish wood floors. paint interior, one new bathroom window on back of houseDetails
new bathroom w/linen closet in same location as (e) bathroom, new built in cabinets at fireplace in living room, new replacement windows on side of house, insulate open walls, attic and some floor area. refinish wood floors. paint interior, one new bathroom window on back of house | $133,000 |
| Mar 20, 2006 | Completed final sign-off Sep 2006 | 276 Hermann St | repair (e) bathroom due to leak inceiling area. remove finishes on walls/ceiling/floor. insulate exterior wall. install new gypsum to walls and ceiling, tile to tub/shower walls and vinyl on floor. paint. no structural waor. unit#276.Details
repair (e) bathroom due to leak inceiling area. remove finishes on walls/ceiling/floor. insulate exterior wall. install new gypsum to walls and ceiling, tile to tub/shower walls and vinyl on floor. paint. no structural waor. unit#276. | $6,500 |
| Sep 12, 2005 | Completed final sign-off Nov 2005 | 232 30th Av | nea bathroom, enlarge 2 closets, built in shelves, new closet all on 2nd floorDetails
nea bathroom, enlarge 2 closets, built in shelves, new closet all on 2nd floor | $68,000 |
| Nov 8, 2004 | Completed final sign-off Apr 2005 | 182 15th Av | remodel 2 kitchens. cabinets, countertops, elec, plumb, new appliances. remodel 2 baths, new flooriDetails
remodel 2 kitchens. cabinets, countertops, elec, plumb, new appliances. remodel 2 baths, new floori | $120,000 |
| Aug 5, 2004 | Expired or cancelled expired Jul 2005 | 245 Leavenworth St | widen hallway with header and replace with new 2x4's in bathroomDetails
widen hallway with header and replace with new 2x4's in bathroom | $1,000 |
| May 17, 2004 | Expired or cancelled expired Jul 2005 | 245 Leavenworth St | remodel kitchen & bathroom in unit#21, new electrical & plumbing & cabinets in kitchen. bathroom newDetails
remodel kitchen & bathroom in unit#21, new electrical & plumbing & cabinets in kitchen. bathroom new | $7,800 |
| May 12, 2004 | Expired or cancelled expired Jul 2005 | 245 Leavenworth St | to comply with nov 200230458 work includes removing closet and kitchen in basement in exist bath,Details
to comply with nov 200230458 work includes removing closet and kitchen in basement in exist bath, | $1,700 |
| Mar 12, 2004 | Never finaled issued Mar 2004, no final | 245 Leavenworth St | remodel kitchen & bathroom in unit #31. new elec & plumbing & cabinet in kitchen. bathrm new showerDetails
remodel kitchen & bathroom in unit #31. new elec & plumbing & cabinet in kitchen. bathrm new shower | $7,800 |
| Sep 18, 2002 | Completed final sign-off Jan 2003 | 3294 Clay St | #3- remodel kitchen, & install electric towel warmer in bathroomDetails
#3- remodel kitchen, & install electric towel warmer in bathroom | $18,000 |
| Oct 24, 2001 | Expired or cancelled expired Apr 2002 | 248 30th Av | remodel master bathroom only, within same 4 walls, no structural workDetails
remodel master bathroom only, within same 4 walls, no structural work | $22,000 |