Castle Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Jul 2026
- Last 24 months
- 12 permits filed
83 permits since 2000: 60 completed, 11 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 5 completed, 4 in progress, 1 expired or cancelled. Typically 23 days from filing to permit and 466 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2026 | In progress issued Jul 2026 | 667 39th Av | front staircase repair,less than 50%. no structural; replace to clay tile steps.Details
front staircase repair,less than 50%. no structural; replace to clay tile steps. | $2,000 |
| Oct 9, 2025 | In progress issued Oct 2025 | 667 39th Av | 1st flr: remodel bath, bedrooms, add media room. 1 full bath and laundry. 2nd flr: remodel kitchen, baths, add 1 full bath. infill south side light well and infill rear. reconifure the interior stairs. new vinyl windows at rear & sideDetails
1st flr: remodel bath, bedrooms, add media room. 1 full bath and laundry. 2nd flr: remodel kitchen, baths, add 1 full bath. infill south side light well and infill rear. reconifure the interior stairs. new vinyl windows at rear & side | $270,000 |
| Mar 11, 2024 | In progress issued May 2024 | 1958 42nd Av | replace windows throughout house w/ same opening & type. add (2) bedrooms, bath, & entertainment room w/ wetbar at 1/f. relocate laundry on 1/f. add rear deck on 2/f w/ staircase to access rear yard. remodel/relocate kitchen, dining, living room, bath & (e) master bedroom to master suite at 2/f.Details
replace windows throughout house w/ same opening & type. add (2) bedrooms, bath, & entertainment room w/ wetbar at 1/f. relocate laundry on 1/f. add rear deck on 2/f w/ staircase to access rear yard. remodel/relocate kitchen, dining, living room, bath & (e) master bedroom to master suite at 2/f. | $120,000 |
| Dec 26, 2023 | In progress issued Jan 2024 | 758 Lyon St | remodel (e) kitchen, bathroom. construct 1 new full bath, powder room, & remove/replace sheetrock w/ new at 2/f. remodel (e) kitchen, bathroom. construct 1 new full bath, powder room, & remove/replace sheetrock w/ new at 3/f. repair (e) rear staircase in-kind (less than 50%).Details
remodel (e) kitchen, bathroom. construct 1 new full bath, powder room, & remove/replace sheetrock w/ new at 2/f. remodel (e) kitchen, bathroom. construct 1 new full bath, powder room, & remove/replace sheetrock w/ new at 3/f. repair (e) rear staircase in-kind (less than 50%). | $368,000 |
| May 10, 2023 | Completed final sign-off Apr 2024 | 52 Fairfield Wy | replace front stair in-kindDetails
replace front stair in-kind | $3,000 |
| Dec 30, 2022 | Completed final sign-off Feb 2025 | 115 Balceta Av | add 1 master suite on 1/f. relocate laundry & powder room on 1/f. remodel (e) family room on 1/f. redesign interior staircase. kitchen remodel on 2/f with open design concepts. bathrooms & living room remodel on 2/frepair (e) deck on 2/f. replace all windows.Details
add 1 master suite on 1/f. relocate laundry & powder room on 1/f. remodel (e) family room on 1/f. redesign interior staircase. kitchen remodel on 2/f with open design concepts. bathrooms & living room remodel on 2/frepair (e) deck on 2/f. replace all windows. | $200,000 |
| Jun 14, 2021 | Completed final sign-off Apr 2024 | 704 Ashbury St | reconfigure interior stairs. remodel entire house: 1/f: add entertainment rom, 1/2. 2/f: remodel kitchen, add 1/2 bath, 3/f: remodel bath, add full bath. 4/f: add ofice, master bath & laundry. bulding shall be fully sprinklered under sep permit nfpa 13d standards. add 4 stop elevator.Details
reconfigure interior stairs. remodel entire house: 1/f: add entertainment rom, 1/2. 2/f: remodel kitchen, add 1/2 bath, 3/f: remodel bath, add full bath. 4/f: add ofice, master bath & laundry. bulding shall be fully sprinklered under sep permit nfpa 13d standards. add 4 stop elevator. | $200,000 |
| Dec 12, 2019 | Completed final sign-off Apr 2021 | 698 Los Palmos Dr | upgrade (e) bedroom, multi-room, family room & add one full bath on lower flr. relocate (e) kitchen, dining room. convert one (e) bath to 2 full bathroom. repair interior staircase from main level down to lower floor. convert 2 (e) bedroom to one bedroom & relocate (e) bath on 2nd floor.Details
upgrade (e) bedroom, multi-room, family room & add one full bath on lower flr. relocate (e) kitchen, dining room. convert one (e) bath to 2 full bathroom. repair interior staircase from main level down to lower floor. convert 2 (e) bedroom to one bedroom & relocate (e) bath on 2nd floor. | $188,000 |
| Mar 15, 2018 | Completed final sign-off Jul 2018 | 1844 Mcallister St | to comply with nov #201717981 #2repair stairway: 8 wood steps less than 50%Details
to comply with nov #201717981 #2repair stairway: 8 wood steps less than 50% | $650 |
| Sep 30, 2014 | Expired or cancelled cancelled May 2015 | 731 Commercial St | add 4 risers stair between 731 and 731 and provide improved entrance accessiblity to 731. new doors to match wood existing and to include power door assist.Details
add 4 risers stair between 731 and 731 and provide improved entrance accessiblity to 731. new doors to match wood existing and to include power door assist. | $9,000 |