Castle Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Jul 2026
- Last 24 months
- 12 permits filed
83 permits since 2000: 60 completed, 11 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 25 days from filing to permit and 484 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2022 | Completed final sign-off Apr 2024 | 670 26th Av | 1/f: add 1 bedroom playroom, media dna 1.5 bath. 2/f: remodel kitchen, add 1 full bath and 1 bedroom. 3/f: remodel bedroom and bathroom, add 1 full bath and 2 bedrooms. add new dormer, new roof deck. repair front exterior wall (stucco with in-kind)Details
1/f: add 1 bedroom playroom, media dna 1.5 bath. 2/f: remodel kitchen, add 1 full bath and 1 bedroom. 3/f: remodel bedroom and bathroom, add 1 full bath and 2 bedrooms. add new dormer, new roof deck. repair front exterior wall (stucco with in-kind) | $98,000 |