Back to kitchen remodel contractors
Castle Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Jul 2026
- Last 24 months
- 12 permits filed
83 permits since 2000: 60 completed, 11 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 15 completed, 5 in progress, 1 never finaled, 2 expired or cancelled. Typically 19 days from filing to permit and 466 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2025 | Expired or cancelled cancelled May 2026 | 3118 Rivera St | 1st fl/ add 1 full bathroom , 2 bedrooms and one media room cantilever deck ar rear, infill lightwell at east side. 2nd fl: remodel kitchen and bath. add 1 full bath.Details
1st fl/ add 1 full bathroom , 2 bedrooms and one media room cantilever deck ar rear, infill lightwell at east side. 2nd fl: remodel kitchen and bath. add 1 full bath. | $225,000 |
| Oct 9, 2025 | In progress issued Oct 2025 | 667 39th Av | 1st flr: remodel bath, bedrooms, add media room. 1 full bath and laundry. 2nd flr: remodel kitchen, baths, add 1 full bath. infill south side light well and infill rear. reconifure the interior stairs. new vinyl windows at rear & sideDetails
1st flr: remodel bath, bedrooms, add media room. 1 full bath and laundry. 2nd flr: remodel kitchen, baths, add 1 full bath. infill south side light well and infill rear. reconifure the interior stairs. new vinyl windows at rear & side | $270,000 |
| Sep 17, 2025 | In progress issued Sep 2025 | 636 Moultrie St | remodel kitchen (150 sq ft) and bathroom (40 sq ft) in-kind. no change to wall layout. no change to floor layout. no structural work.Details
remodel kitchen (150 sq ft) and bathroom (40 sq ft) in-kind. no change to wall layout. no change to floor layout. no structural work. | $25,000 |
| Aug 13, 2025 | In progress issued Jan 2026 | 1542 22nd Av | 1st floor: add 2 bedrooms, 1 full bath, laundry, media and home office. 2nd floor: remodel kitchen and bathroom. relocate bedroom & add 1.5 bath. rear addition: infill lightwell adn new patio at rear. replace front windows in kind (vinyl).Details
1st floor: add 2 bedrooms, 1 full bath, laundry, media and home office. 2nd floor: remodel kitchen and bathroom. relocate bedroom & add 1.5 bath. rear addition: infill lightwell adn new patio at rear. replace front windows in kind (vinyl). | $180,000 |
| Mar 11, 2024 | In progress issued May 2024 | 1958 42nd Av | replace windows throughout house w/ same opening & type. add (2) bedrooms, bath, & entertainment room w/ wetbar at 1/f. relocate laundry on 1/f. add rear deck on 2/f w/ staircase to access rear yard. remodel/relocate kitchen, dining, living room, bath & (e) master bedroom to master suite at 2/f.Details
replace windows throughout house w/ same opening & type. add (2) bedrooms, bath, & entertainment room w/ wetbar at 1/f. relocate laundry on 1/f. add rear deck on 2/f w/ staircase to access rear yard. remodel/relocate kitchen, dining, living room, bath & (e) master bedroom to master suite at 2/f. | $120,000 |
| Jan 31, 2024 | Completed final sign-off Apr 2025 | 1670 27th Av | 1st floor: add 2 bedroom, media, home office and 2 full bath. 2nd floor: remodel kitchen and bathroom. relocate bedroom. add 1 full bath. infill under sunroom. casement, fix (8) casement replace front window in-kind with aluminum clad woodDetails
1st floor: add 2 bedroom, media, home office and 2 full bath. 2nd floor: remodel kitchen and bathroom. relocate bedroom. add 1 full bath. infill under sunroom. casement, fix (8) casement replace front window in-kind with aluminum clad wood | $180,000 |
| Dec 26, 2023 | In progress issued Jan 2024 | 758 Lyon St | remodel (e) kitchen, bathroom. construct 1 new full bath, powder room, & remove/replace sheetrock w/ new at 2/f. remodel (e) kitchen, bathroom. construct 1 new full bath, powder room, & remove/replace sheetrock w/ new at 3/f. repair (e) rear staircase in-kind (less than 50%).Details
remodel (e) kitchen, bathroom. construct 1 new full bath, powder room, & remove/replace sheetrock w/ new at 2/f. remodel (e) kitchen, bathroom. construct 1 new full bath, powder room, & remove/replace sheetrock w/ new at 3/f. repair (e) rear staircase in-kind (less than 50%). | $368,000 |
| Aug 23, 2023 | Never finaled issued Aug 2023, no final | 335 Casitas Av | moving kitchen locationDetails
moving kitchen location | $25,000 |
| Dec 30, 2022 | Completed final sign-off Feb 2025 | 115 Balceta Av | add 1 master suite on 1/f. relocate laundry & powder room on 1/f. remodel (e) family room on 1/f. redesign interior staircase. kitchen remodel on 2/f with open design concepts. bathrooms & living room remodel on 2/frepair (e) deck on 2/f. replace all windows.Details
add 1 master suite on 1/f. relocate laundry & powder room on 1/f. remodel (e) family room on 1/f. redesign interior staircase. kitchen remodel on 2/f with open design concepts. bathrooms & living room remodel on 2/frepair (e) deck on 2/f. replace all windows. | $200,000 |
| Dec 9, 2022 | Completed final sign-off Apr 2024 | 52 Fairfield Wy | 1/f: add 1 bedroom, family room den, 2 full baths and laundry. 2/f: remodel kitchen, bathroom, add 1.5 full bath.Details
1/f: add 1 bedroom, family room den, 2 full baths and laundry. 2/f: remodel kitchen, bathroom, add 1.5 full bath. | $180,000 |
| Nov 18, 2022 | Completed final sign-off Apr 2024 | 670 26th Av | 1/f: add 1 bedroom playroom, media dna 1.5 bath. 2/f: remodel kitchen, add 1 full bath and 1 bedroom. 3/f: remodel bedroom and bathroom, add 1 full bath and 2 bedrooms. add new dormer, new roof deck. repair front exterior wall (stucco with in-kind)Details
1/f: add 1 bedroom playroom, media dna 1.5 bath. 2/f: remodel kitchen, add 1 full bath and 1 bedroom. 3/f: remodel bedroom and bathroom, add 1 full bath and 2 bedrooms. add new dormer, new roof deck. repair front exterior wall (stucco with in-kind) | $98,000 |
| Sep 2, 2021 | Completed final sign-off Sep 2022 | 489 Faxon Av | revision to app#: 1st floor: add 1 bedroom, 2 full baths, family and office. 2nd floor: remodel kitchen and bathroom.Details
revision to app#: 1st floor: add 1 bedroom, 2 full baths, family and office. 2nd floor: remodel kitchen and bathroom. | |
| Aug 17, 2021 | Completed final sign-off Jul 2022 | 2255 21st Av | 1st/f: add 1 bedrooms, 2 full bath, and family rm. 2nd/f: remodel kitchen and bathroom. add 1 full bath. add (n) deck at rear.Details
1st/f: add 1 bedrooms, 2 full bath, and family rm. 2nd/f: remodel kitchen and bathroom. add 1 full bath. add (n) deck at rear. | $110,000 |
| Jun 14, 2021 | Completed final sign-off Apr 2024 | 704 Ashbury St | reconfigure interior stairs. remodel entire house: 1/f: add entertainment rom, 1/2. 2/f: remodel kitchen, add 1/2 bath, 3/f: remodel bath, add full bath. 4/f: add ofice, master bath & laundry. bulding shall be fully sprinklered under sep permit nfpa 13d standards. add 4 stop elevator.Details
reconfigure interior stairs. remodel entire house: 1/f: add entertainment rom, 1/2. 2/f: remodel kitchen, add 1/2 bath, 3/f: remodel bath, add full bath. 4/f: add ofice, master bath & laundry. bulding shall be fully sprinklered under sep permit nfpa 13d standards. add 4 stop elevator. | $200,000 |
| Apr 26, 2021 | Completed final sign-off Sep 2022 | 489 Faxon Av | construct 1 bedroom, 1 full bathroom, & family room at ground floor. remodel (e) kitchen, bathroom & replace (e) sheetrock with new at 2nd floor.Details
construct 1 bedroom, 1 full bathroom, & family room at ground floor. remodel (e) kitchen, bathroom & replace (e) sheetrock with new at 2nd floor. | $68,000 |
| Nov 4, 2020 | Expired or cancelled cancelled Dec 2023 | 300 03rd St | apt#1203: kitchen remodel, no change in layout. replace vanity in bathroom and retile tub surround, finished.Details
apt#1203: kitchen remodel, no change in layout. replace vanity in bathroom and retile tub surround, finished. | $10,000 |
| Jan 13, 2020 | Completed final sign-off Mar 2026 | 136 17th Av | adu per ordinance 162-16, 1st floor, add kitchen, living rm, 2 bathrms, 2 bedrms, fully sprinkler 1st floor unit, sprinkler system under separate permit.Details
adu per ordinance 162-16, 1st floor, add kitchen, living rm, 2 bathrms, 2 bedrms, fully sprinkler 1st floor unit, sprinkler system under separate permit. | $80,000 |
| Dec 16, 2019 | Completed final sign-off Oct 2021 | 425 Monticello St | to comply with nov#201902243. revision to app#201909192117. basement: convert entertainment room to bedroom and add 1 full bath. 1st floor: remove kitchen and reconfigure bathrooms. 2nd floor: relocate laundry and bathroom.Details
to comply with nov#201902243. revision to app#201909192117. basement: convert entertainment room to bedroom and add 1 full bath. 1st floor: remove kitchen and reconfigure bathrooms. 2nd floor: relocate laundry and bathroom. | |
| Dec 12, 2019 | Completed final sign-off Apr 2021 | 698 Los Palmos Dr | upgrade (e) bedroom, multi-room, family room & add one full bath on lower flr. relocate (e) kitchen, dining room. convert one (e) bath to 2 full bathroom. repair interior staircase from main level down to lower floor. convert 2 (e) bedroom to one bedroom & relocate (e) bath on 2nd floor.Details
upgrade (e) bedroom, multi-room, family room & add one full bath on lower flr. relocate (e) kitchen, dining room. convert one (e) bath to 2 full bathroom. repair interior staircase from main level down to lower floor. convert 2 (e) bedroom to one bedroom & relocate (e) bath on 2nd floor. | $188,000 |
| Feb 28, 2019 | Completed final sign-off Aug 2022 | 134 17th Av | 1st flr - foundation work and infill at rear. 2nd flr - remodel kitchen and bathrm add 2 full baths and a bedroom. 3rd flr - remodel kitchen and bathrm, add 1 full bath and a bedroomDetails
1st flr - foundation work and infill at rear. 2nd flr - remodel kitchen and bathrm add 2 full baths and a bedroom. 3rd flr - remodel kitchen and bathrm, add 1 full bath and a bedroom | $95,000 |
| Jul 19, 2016 | Completed final sign-off Aug 2016 | 253 Paris St | replaced kitchen cabinets, 12', only.Details
replaced kitchen cabinets, 12', only. | $1,000 |
| Jun 27, 2014 | Completed final sign-off Sep 2015 | 3543 18th St | kitchen remodel at existing kitchen at 2nd fl. maher 155-13 not requiredDetails
kitchen remodel at existing kitchen at 2nd fl. maher 155-13 not required | $125,000 |
| Apr 7, 2014 | Completed final sign-off Jun 2014 | 844 33rd Av | repair damaged area. 100 sq. ft. in kitchen. to comply with bid nov #201461611 dated 4/2/2014.Details
repair damaged area. 100 sq. ft. in kitchen. to comply with bid nov #201461611 dated 4/2/2014. | $450 |