Back to bathroom remodel contractors
Castillo Plumbing
- Based in
- Hayward
- On San Francisco permits
- Oct 2014 to Oct 2025
- Last 24 months
- 6 permits filed
23 permits since 2000: 15 completed, 4 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 2 never finaled. Typically 0 days from filing to permit and 85 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2025 | Completed final sign-off Jun 2025 | 415 Grafton Av | two bathrooms remodel. first bathroom remove all tile, water proof floor, install new tile, new bathroom sink, cabinet and new toile. second bathroom: remove old tile, water proof floor, install new tile, new bathroom sink, cabinet and new toilet.Details
two bathrooms remodel. first bathroom remove all tile, water proof floor, install new tile, new bathroom sink, cabinet and new toile. second bathroom: remove old tile, water proof floor, install new tile, new bathroom sink, cabinet and new toilet. | $6,000 |
| Mar 6, 2023 | Completed final sign-off Dec 2023 | 73 Elsie St | bathroom remodel on gr fl. install patio storm drain, demo rotten back stairs. change outlets, light switches, shower panDetails
bathroom remodel on gr fl. install patio storm drain, demo rotten back stairs. change outlets, light switches, shower pan | $7,900 |
| May 2, 2022 | Completed final sign-off Aug 2024 | 4351 Ulloa St | to comply w/nov's #202185017, #202184310 & #202018303,2021185027,202184309 1/f remodel of (e) 2-story single-family expansion of bathroom (new fixtures/finishes/millwork), removal dividing wall btwn rear bedroom & creation of new common rm, new kitchenette, laundry including fixtures/finishesDetails
to comply w/nov's #202185017, #202184310 & #202018303,2021185027,202184309 1/f remodel of (e) 2-story single-family expansion of bathroom (new fixtures/finishes/millwork), removal dividing wall btwn rear bedroom & creation of new common rm, new kitchenette, laundry including fixtures/finishes | $25,000 |
| Feb 22, 2021 | Never finaled issued Feb 2021, no final | 1470 Funston Av | bathroom remodel at ground level. no change in layout.Details
bathroom remodel at ground level. no change in layout. | $8,000 |
| Jun 24, 2019 | Completed final sign-off Sep 2019 | 65 Ora Wy | bathroom remodel, change tub, showerpan, remove floor/wall tiles, install new toilet, sink, new hardy backer, new shower faucet.Details
bathroom remodel, change tub, showerpan, remove floor/wall tiles, install new toilet, sink, new hardy backer, new shower faucet. | $6,000 |
| Mar 13, 2019 | Completed final sign-off Jun 2019 | 2255 Mason St | address correction for pa201903044360 from unit 4 to "unit 3". rev to previous permit pa201903044360: full bathroom remodel: new fixtures, new shower wall tile, new tile walls & floor.Details
address correction for pa201903044360 from unit 4 to "unit 3". rev to previous permit pa201903044360: full bathroom remodel: new fixtures, new shower wall tile, new tile walls & floor. | |
| Mar 4, 2019 | Completed final sign-off Jun 2019 | 2255 Mason St | unit 4: change bathroom sink @ unit # 4.Details
unit 4: change bathroom sink @ unit # 4. | $250 |
| Jan 15, 2019 | Completed final sign-off Mar 2019 | 1440 Broadway | #302 - change bathroom sin from 1 to double sink , new glass shower door, new toilet and shower pan.Details
#302 - change bathroom sin from 1 to double sink , new glass shower door, new toilet and shower pan. | $5,000 |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 2255 Mason St | apt 5: bathroom remodel.Details
apt 5: bathroom remodel. | $8,000 |
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 614 Sanchez St | 2 bath remodel - cosmetic only; standing shower, new tile floor, paint inside bathDetails
2 bath remodel - cosmetic only; standing shower, new tile floor, paint inside bath | $10,000 |
| Oct 21, 2014 | Completed final sign-off Oct 2015 | 91 Middlefield Dr | kitchen & bathroom remodel @ main floor - new cabinets, new countertop, new sink & plumbing, new electrical only to the kitchen & bathroom. no structural work.Details
kitchen & bathroom remodel @ main floor - new cabinets, new countertop, new sink & plumbing, new electrical only to the kitchen & bathroom. no structural work. | $12,000 |