Castillo Plumbing
- Based in
- Hayward
- On San Francisco permits
- Oct 2014 to Oct 2025
- Last 24 months
- 6 permits filed
23 permits since 2000: 15 completed, 4 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2025 | In progress issued Mar 2025 | 2842 Franklin St | replace approx 40 sq ft of tile decking in kind, paint back wall house, patch 6"x7 stucco in kind; repair some siding (approx 20 sq ft), paint 1 room, repair rear stairs step (4 total) < 50%; change exterior doors trim. regrout shower wall and floor. work not visible from streetDetails
replace approx 40 sq ft of tile decking in kind, paint back wall house, patch 6"x7 stucco in kind; repair some siding (approx 20 sq ft), paint 1 room, repair rear stairs step (4 total) < 50%; change exterior doors trim. regrout shower wall and floor. work not visible from street | $10,500 |