Castillo Plumbing
- Based in
- Hayward
- On San Francisco permits
- Oct 2014 to Oct 2025
- Last 24 months
- 6 permits filed
23 permits since 2000: 15 completed, 4 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2025 | In progress issued Oct 2025 | 73 Elsie St | kitchen remodeling: remove old cabinets and counter top, install new. new appliances, new counter top, new flooring, new lights, insulation. new back splash, new drywall, and paint all. plumbing staying in same location. new outlets on counter top and dedicated circuit.Details
kitchen remodeling: remove old cabinets and counter top, install new. new appliances, new counter top, new flooring, new lights, insulation. new back splash, new drywall, and paint all. plumbing staying in same location. new outlets on counter top and dedicated circuit. | $15,000 |
| Jun 3, 2025 | Completed final sign-off Jun 2025 | 1550 33rd Av | replace existing skylight same size same location. repair damage, paint and seal. (not street visible).Details
replace existing skylight same size same location. repair damage, paint and seal. (not street visible). | $750 |
| Apr 22, 2025 | Completed final sign-off Jun 2025 | 415 Grafton Av | two bathrooms remodel. first bathroom remove all tile, water proof floor, install new tile, new bathroom sink, cabinet and new toile. second bathroom: remove old tile, water proof floor, install new tile, new bathroom sink, cabinet and new toilet.Details
two bathrooms remodel. first bathroom remove all tile, water proof floor, install new tile, new bathroom sink, cabinet and new toile. second bathroom: remove old tile, water proof floor, install new tile, new bathroom sink, cabinet and new toilet. | $6,000 |
| Mar 7, 2025 | In progress issued Mar 2025 | 2842 Franklin St | replace approx 40 sq ft of tile decking in kind, paint back wall house, patch 6"x7 stucco in kind; repair some siding (approx 20 sq ft), paint 1 room, repair rear stairs step (4 total) < 50%; change exterior doors trim. regrout shower wall and floor. work not visible from streetDetails
replace approx 40 sq ft of tile decking in kind, paint back wall house, patch 6"x7 stucco in kind; repair some siding (approx 20 sq ft), paint 1 room, repair rear stairs step (4 total) < 50%; change exterior doors trim. regrout shower wall and floor. work not visible from street | $10,500 |
| Feb 3, 2025 | Completed final sign-off May 2025 | 1488 Dolores St | retrofit of unreinforced masonary foundation through addition of reinforced concrete facingDetails
retrofit of unreinforced masonary foundation through addition of reinforced concrete facing | $75,000 |
| Dec 19, 2024 | In progress filed Dec 2024, not yet issued | 521 03rd St | this permit is requested by the health inspector. repair and replace (e) counter. no change of use/occupancy.Details
this permit is requested by the health inspector. repair and replace (e) counter. no change of use/occupancy. | $2,000 |
| Sep 30, 2024 | Completed final sign-off Jun 2025 | 1550 33rd Av | repair balcony joist 3 nos. max , repair stucco, repair balcony floor joist repairs stucco , paint outside house, roof repairs, repair window, repair siding, repair stair hand railsDetails
repair balcony joist 3 nos. max , repair stucco, repair balcony floor joist repairs stucco , paint outside house, roof repairs, repair window, repair siding, repair stair hand rails | $17,000 |
| Feb 15, 2024 | In progress filed Feb 2024, not yet issued | 73 Elsie St | waterproof right side of the retaining wall.Details
waterproof right side of the retaining wall. | $6,300 |
| Mar 6, 2023 | Completed final sign-off Dec 2023 | 73 Elsie St | bathroom remodel on gr fl. install patio storm drain, demo rotten back stairs. change outlets, light switches, shower panDetails
bathroom remodel on gr fl. install patio storm drain, demo rotten back stairs. change outlets, light switches, shower pan | $7,900 |
| May 2, 2022 | Completed final sign-off Aug 2024 | 4351 Ulloa St | to comply w/nov's #202185017, #202184310 & #202018303,2021185027,202184309 1/f remodel of (e) 2-story single-family expansion of bathroom (new fixtures/finishes/millwork), removal dividing wall btwn rear bedroom & creation of new common rm, new kitchenette, laundry including fixtures/finishesDetails
to comply w/nov's #202185017, #202184310 & #202018303,2021185027,202184309 1/f remodel of (e) 2-story single-family expansion of bathroom (new fixtures/finishes/millwork), removal dividing wall btwn rear bedroom & creation of new common rm, new kitchenette, laundry including fixtures/finishes | $25,000 |
| Feb 22, 2021 | Never finaled issued Feb 2021, no final | 1470 Funston Av | bathroom remodel at ground level. no change in layout.Details
bathroom remodel at ground level. no change in layout. | $8,000 |
| Jan 29, 2020 | Never finaled issued Jul 2021, no final | 2327 Mission St | temporary shoring plans to 201904107632Details
temporary shoring plans to 201904107632 | $10,000 |
| Jan 29, 2020 | Never finaled issued Jul 2021, no final | 2327 Mission St | revision to 201904107632. reduce scope of work. reduce excavation and length of contrete wall no additonal workDetails
revision to 201904107632. reduce scope of work. reduce excavation and length of contrete wall no additonal work | |
| Jun 24, 2019 | Completed final sign-off Sep 2019 | 65 Ora Wy | bathroom remodel, change tub, showerpan, remove floor/wall tiles, install new toilet, sink, new hardy backer, new shower faucet.Details
bathroom remodel, change tub, showerpan, remove floor/wall tiles, install new toilet, sink, new hardy backer, new shower faucet. | $6,000 |
| Apr 10, 2019 | Completed final sign-off Sep 2021 | 2327 Mission St | comply with nov 201924101. add new concrete retaiing wall and concrete grade beam with posts in the crawl space due to excessive excavationDetails
comply with nov 201924101. add new concrete retaiing wall and concrete grade beam with posts in the crawl space due to excessive excavation | $45,000 |
| Mar 13, 2019 | Completed final sign-off Jun 2019 | 2255 Mason St | address correction for pa201903044360 from unit 4 to "unit 3". rev to previous permit pa201903044360: full bathroom remodel: new fixtures, new shower wall tile, new tile walls & floor.Details
address correction for pa201903044360 from unit 4 to "unit 3". rev to previous permit pa201903044360: full bathroom remodel: new fixtures, new shower wall tile, new tile walls & floor. | |
| Mar 4, 2019 | Completed final sign-off Jun 2019 | 2255 Mason St | unit 4: change bathroom sink @ unit # 4.Details
unit 4: change bathroom sink @ unit # 4. | $250 |
| Jan 15, 2019 | Completed final sign-off Mar 2019 | 1440 Broadway | #302 - change bathroom sin from 1 to double sink , new glass shower door, new toilet and shower pan.Details
#302 - change bathroom sin from 1 to double sink , new glass shower door, new toilet and shower pan. | $5,000 |
| Mar 5, 2018 | Completed final sign-off Jun 2018 | 2329 Mission St | install new tile walls & floor in shower, no plumbing fixture remodel in thispermit.Details
install new tile walls & floor in shower, no plumbing fixture remodel in thispermit. | $1,200 |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 2255 Mason St | apt 5: bathroom remodel.Details
apt 5: bathroom remodel. | $8,000 |
| Dec 8, 2017 | Completed final sign-off Dec 2017 | 2255 Mason St | reroofing.Details
reroofing. | $15,000 |
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 614 Sanchez St | 2 bath remodel - cosmetic only; standing shower, new tile floor, paint inside bathDetails
2 bath remodel - cosmetic only; standing shower, new tile floor, paint inside bath | $10,000 |
| Oct 21, 2014 | Completed final sign-off Oct 2015 | 91 Middlefield Dr | kitchen & bathroom remodel @ main floor - new cabinets, new countertop, new sink & plumbing, new electrical only to the kitchen & bathroom. no structural work.Details
kitchen & bathroom remodel @ main floor - new cabinets, new countertop, new sink & plumbing, new electrical only to the kitchen & bathroom. no structural work. | $12,000 |