Block 1841, lot 022
1470 Funston Ave
- City’s use
- Single Family Residential
- Built
- 1913
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,210 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2021 | Never finaled issued Jun 2021, no final | 1470 Funston Av | revision to pa# 202008051135. increase scope - bathroom rmeodel at gorund fl. in kind.Details
revision to pa# 202008051135. increase scope - bathroom rmeodel at gorund fl. in kind. | $14,000 | |
| Feb 24, 2021 | Never finaled issued Feb 2021, no final | 1470 Funston Av | replace concrete slab in backyard 200 maximum sq ft. revision to pa# 202102195000.Details
replace concrete slab in backyard 200 maximum sq ft. revision to pa# 202102195000. | $400 | |
| Feb 22, 2021 | Never finaled issued Feb 2021, no final | 1470 Funston Av | Castillo Plumbing | bathroom remodel at ground level. no change in layout.Details
bathroom remodel at ground level. no change in layout. | $8,000 |
| Feb 19, 2021 | Never finaled issued Feb 2021, no final | 1470 Funston Av | replace concrete slab in backyard. 10' x 10'. no other work proposed or authorizedDetails
replace concrete slab in backyard. 10' x 10'. no other work proposed or authorized | $400 | |
| Aug 5, 2020 | Never finaled issued Nov 2020, no final | 1470 Funston Av | comply with nov# 202015971; repair dryrot at rear portion on all 3 floors, new deck at rearDetails
comply with nov# 202015971; repair dryrot at rear portion on all 3 floors, new deck at rear | $12,000 | |
| Mar 3, 2020 | Never finaled filed Mar 2020, never issued | 1470 Funston Av | comply w/ nov #202015971. remodel 1st floor bedroom with bathroom. (framing, lighting, power) 3)remodel 2nd and 3rd sunroom, (framing, lighting, p0wer, windows).Details
comply w/ nov #202015971. remodel 1st floor bedroom with bathroom. (framing, lighting, power) 3)remodel 2nd and 3rd sunroom, (framing, lighting, p0wer, windows). | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Castillo Plumbing
- Engineers
- Jingbo Yang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.