Back to kitchen remodel contractors
Carroll Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Aug 2026
- Last 24 months
- 5 permits filed
56 permits since 2000: 42 completed, 6 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 9 completed, 2 in progress, 2 never finaled. Typically 52 days from filing to permit and 307 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2024 | Completed final sign-off Dec 2025 | 45 Walnut St | 1/f: remove (e) garage stairs, move garage wall, add new gym rm, reconfigure (e) bath. remove (e) back staircase, add new staircase to 2/f. 2/f: move (e) powder room, move (e) kitchen to open into new sitting room, new pantry. remove (e) back staircase to 1/f. 3/f: add new walk-in closet toDetails
1/f: remove (e) garage stairs, move garage wall, add new gym rm, reconfigure (e) bath. remove (e) back staircase, add new staircase to 2/f. 2/f: move (e) powder room, move (e) kitchen to open into new sitting room, new pantry. remove (e) back staircase to 1/f. 3/f: add new walk-in closet to | $185,000 |
| May 30, 2024 | In progress issued Sep 2024 | 20 Broadmoor Dr | kitchen remodel to remove (1) wall and remove window. new window.Details
kitchen remodel to remove (1) wall and remove window. new window. | $30,000 |
| Nov 8, 2023 | Completed final sign-off Nov 2024 | 81 Glover St | remodel of (e) kitchen and dining room; no change to envelope of buildingDetails
remodel of (e) kitchen and dining room; no change to envelope of building | $75,000 |
| Aug 3, 2023 | In progress issued May 2024 | 51 Lopez Av | 1/f: alteration at gym.garage area 48 sq ft additional heated floor area. (n) bathroom. relocae washer/dryer under stair. small cooktop and refer at kitchenette.2nd fl: infill wall openings & replace door with window. remove juliette balcony. infill portion of wall at lounge for shear wall.Details
1/f: alteration at gym.garage area 48 sq ft additional heated floor area. (n) bathroom. relocae washer/dryer under stair. small cooktop and refer at kitchenette.2nd fl: infill wall openings & replace door with window. remove juliette balcony. infill portion of wall at lounge for shear wall. | $15,000 |
| May 10, 2023 | Completed final sign-off Sep 2023 | 73 Wood St | remodel of the existing kitchen. upgrade (e) electrical and plumbing.Details
remodel of the existing kitchen. upgrade (e) electrical and plumbing. | $30,000 |
| Mar 21, 2023 | Completed final sign-off Sep 2024 | 2550 Ulloa St | 1st fl: new adu. convert 168 sqft of garage to adu, remodel (e) bathrm & add kitchen, 2 new egress windows at bedrm, widen (e) entry door. 2nd fl: remodel (e) kitchen & bathrm in kind, add 1 full bathrm, remove (e) door to rear deck, patch stucco to match adjacent wall, remove (e) rear deck.Details
1st fl: new adu. convert 168 sqft of garage to adu, remodel (e) bathrm & add kitchen, 2 new egress windows at bedrm, widen (e) entry door. 2nd fl: remodel (e) kitchen & bathrm in kind, add 1 full bathrm, remove (e) door to rear deck, patch stucco to match adjacent wall, remove (e) rear deck. | $150,000 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 107 22nd Av | remodel of (e) kitchen and bathroom.Details
remodel of (e) kitchen and bathroom. | $20,000 |
| Apr 27, 2022 | Completed final sign-off Jan 2024 | 10 Chaves Av | renovation to single family residence; relocate existing upper floor kitchen to lower floor; relocate existing staircase; drop floor level of rear half of lower level floor by 7.5". convert space to new family room; nook, kitchen and full bath. add new folding door systemDetails
renovation to single family residence; relocate existing upper floor kitchen to lower floor; relocate existing staircase; drop floor level of rear half of lower level floor by 7.5". convert space to new family room; nook, kitchen and full bath. add new folding door system | $235,000 |
| Feb 9, 2022 | Never finaled issued May 2023, no final | 51 Lopez Av | 1st fl: interior remodel. (n) conditioned space for workout room. 2nd fl: interior remodel of kitchen, dining room, living room. 3rd fl: interior remodel of bedrooms. exterior: demo & replace entry steps. replace windows in kind.Details
1st fl: interior remodel. (n) conditioned space for workout room. 2nd fl: interior remodel of kitchen, dining room, living room. 3rd fl: interior remodel of bedrooms. exterior: demo & replace entry steps. replace windows in kind. | $385,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2022 | 115 Jordan Av | basement -remodel (e) space & small rear addition, (n) bathroom, (n) guest room, convert part of space to garage. 1st flr -kitchen remodel, relocate powder room. 2nd flr -remodel at baths & bedrooms, (n) mech, (n) electrical and plumbing systems. ref. pa# 20200111865.Details
basement -remodel (e) space & small rear addition, (n) bathroom, (n) guest room, convert part of space to garage. 1st flr -kitchen remodel, relocate powder room. 2nd flr -remodel at baths & bedrooms, (n) mech, (n) electrical and plumbing systems. ref. pa# 20200111865. | $380,000 |
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 9 Burlwood Dr | remodel of kitchen and bathroom, no exterior work no structural workDetails
remodel of kitchen and bathroom, no exterior work no structural work | $40,000 |
| May 29, 2019 | Completed final sign-off Feb 2020 | 3835 Ulloa St | renew bathroom area - add vanity & wc - 2 full bathrooms. remodel kitchen. (no change to rough plumbing). no change to exterior envelope/front/public right of way. repair roof in kind above entry. demo fire place.Details
renew bathroom area - add vanity & wc - 2 full bathrooms. remodel kitchen. (no change to rough plumbing). no change to exterior envelope/front/public right of way. repair roof in kind above entry. demo fire place. | $20,000 |
| Jun 1, 2017 | Completed final sign-off Aug 2017 | 133 Maywood Dr | remodel (e) kitchen, upgrade plumbing & elec.Details
remodel (e) kitchen, upgrade plumbing & elec. | $37,000 |