Carroll Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Aug 2026
- Last 24 months
- 5 permits filed
56 permits since 2000: 42 completed, 6 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 5 completed, 2 in progress. Typically 172 days from filing to permit and 338 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2026 | In progress issued Sep 2026 | 51 Lopez Av | construct new exterior rear yard 2nd and 3rd floor balcony decks.Details
construct new exterior rear yard 2nd and 3rd floor balcony decks. | $35,000 |
| Nov 15, 2024 | In progress issued Jan 2025 | 20 Broadmoor Dr | removal of (e) enclosed rear stair and convert (e) window in dining room into french doors. (n) deck and stairs in rear.Details
removal of (e) enclosed rear stair and convert (e) window in dining room into french doors. (n) deck and stairs in rear. | $10,000 |
| Mar 21, 2023 | Completed final sign-off Sep 2024 | 2550 Ulloa St | 1st fl: new adu. convert 168 sqft of garage to adu, remodel (e) bathrm & add kitchen, 2 new egress windows at bedrm, widen (e) entry door. 2nd fl: remodel (e) kitchen & bathrm in kind, add 1 full bathrm, remove (e) door to rear deck, patch stucco to match adjacent wall, remove (e) rear deck.Details
1st fl: new adu. convert 168 sqft of garage to adu, remodel (e) bathrm & add kitchen, 2 new egress windows at bedrm, widen (e) entry door. 2nd fl: remodel (e) kitchen & bathrm in kind, add 1 full bathrm, remove (e) door to rear deck, patch stucco to match adjacent wall, remove (e) rear deck. | $150,000 |
| Jun 10, 2021 | Completed final sign-off Oct 2022 | 115 Jordan Av | remove existing rear deck, replace with new deck. install new windows and french door at rear facade of 1/fDetails
remove existing rear deck, replace with new deck. install new windows and french door at rear facade of 1/f | $42,000 |
| Dec 31, 2019 | Completed final sign-off Nov 2022 | 1755 10th Av | interior remodel, new attic access stairs, new deck at rear, replace doors/windows. adu at ground floor under seperate permit. structural work under seperate permit.Details
interior remodel, new attic access stairs, new deck at rear, replace doors/windows. adu at ground floor under seperate permit. structural work under seperate permit. | $600,000 |
| Feb 22, 2018 | Completed final sign-off Jun 2018 | 418 Liberty St | replace posts and braces in kind at the (e) rear side deck due to significant dry-rot, less than 50% of deckDetails
replace posts and braces in kind at the (e) rear side deck due to significant dry-rot, less than 50% of deck | $5,000 |
| May 18, 2016 | Completed final sign-off Jun 2018 | 662 Lisbon St | horizontal addition. remodel & extend rear deck. new fire wall at property line (both sides). rear sliding door. replace wood floor framing of the back porch due to dry rot.Details
horizontal addition. remodel & extend rear deck. new fire wall at property line (both sides). rear sliding door. replace wood floor framing of the back porch due to dry rot. | $16,000 |