Back to bathroom remodel contractors
Carroll Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Aug 2026
- Last 24 months
- 5 permits filed
56 permits since 2000: 42 completed, 6 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 18 completed, 3 in progress, 2 never finaled. Typically 4 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2025 | In progress issued May 2026 | 198 Cresta Vista Dr | convert basement platform w/in (e) envelope (approved under pa 2021806293451) to be occupied as living basement - (n) stair to 2nd floor (interior), add bath; bar sink & fireplace (n) windows in (e) street; new 2nd floor closet & relocate w/d to 2nd floorDetails
convert basement platform w/in (e) envelope (approved under pa 2021806293451) to be occupied as living basement - (n) stair to 2nd floor (interior), add bath; bar sink & fireplace (n) windows in (e) street; new 2nd floor closet & relocate w/d to 2nd floor | $100,000 |
| Aug 23, 2024 | In progress filed Aug 2024, not yet issued | 30 Burnside Av | remodel of 541 sq ft area at 1/f including: family room, bedroom, bathroom, and adding a wet bar.Details
remodel of 541 sq ft area at 1/f including: family room, bedroom, bathroom, and adding a wet bar. | $75,000 |
| Aug 7, 2024 | Completed final sign-off Dec 2025 | 45 Walnut St | 1/f: remove (e) garage stairs, move garage wall, add new gym rm, reconfigure (e) bath. remove (e) back staircase, add new staircase to 2/f. 2/f: move (e) powder room, move (e) kitchen to open into new sitting room, new pantry. remove (e) back staircase to 1/f. 3/f: add new walk-in closet toDetails
1/f: remove (e) garage stairs, move garage wall, add new gym rm, reconfigure (e) bath. remove (e) back staircase, add new staircase to 2/f. 2/f: move (e) powder room, move (e) kitchen to open into new sitting room, new pantry. remove (e) back staircase to 1/f. 3/f: add new walk-in closet to | $185,000 |
| Jul 19, 2024 | Completed final sign-off Aug 2025 | 1831 17th Av | bathroom remodel in kind. new bathroom fixtures, tiles and paint. no moving walls. approx. 40 sq ft.Details
bathroom remodel in kind. new bathroom fixtures, tiles and paint. no moving walls. approx. 40 sq ft. | $20,000 |
| Apr 10, 2024 | Completed final sign-off Jul 2024 | 31 Miraloma Dr | remodel of 2 (e) bathrooms in kind. new plumbing fixtures and electrical. non structuralDetails
remodel of 2 (e) bathrooms in kind. new plumbing fixtures and electrical. non structural | $55,000 |
| Aug 3, 2023 | In progress issued May 2024 | 51 Lopez Av | 1/f: alteration at gym.garage area 48 sq ft additional heated floor area. (n) bathroom. relocae washer/dryer under stair. small cooktop and refer at kitchenette.2nd fl: infill wall openings & replace door with window. remove juliette balcony. infill portion of wall at lounge for shear wall.Details
1/f: alteration at gym.garage area 48 sq ft additional heated floor area. (n) bathroom. relocae washer/dryer under stair. small cooktop and refer at kitchenette.2nd fl: infill wall openings & replace door with window. remove juliette balcony. infill portion of wall at lounge for shear wall. | $15,000 |
| Jan 13, 2023 | Completed final sign-off Aug 2023 | 107 22nd Av | revision to pa# 202211146426. add second half bathroom next to existing bathroom. replace door to main bathroom with wall. change door to bedroom to open outward.Details
revision to pa# 202211146426. add second half bathroom next to existing bathroom. replace door to main bathroom with wall. change door to bedroom to open outward. | $9,000 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 107 22nd Av | remodel of (e) kitchen and bathroom.Details
remodel of (e) kitchen and bathroom. | $20,000 |
| Jun 21, 2022 | Completed final sign-off Dec 2022 | 569 Diamond St | bathroom remodel, half bath in place of existing coat closet, laundry in place of bedroom closet.Details
bathroom remodel, half bath in place of existing coat closet, laundry in place of bedroom closet. | $25,000 |
| Apr 27, 2022 | Completed final sign-off Jan 2024 | 10 Chaves Av | renovation to single family residence; relocate existing upper floor kitchen to lower floor; relocate existing staircase; drop floor level of rear half of lower level floor by 7.5". convert space to new family room; nook, kitchen and full bath. add new folding door systemDetails
renovation to single family residence; relocate existing upper floor kitchen to lower floor; relocate existing staircase; drop floor level of rear half of lower level floor by 7.5". convert space to new family room; nook, kitchen and full bath. add new folding door system | $235,000 |
| Jun 16, 2021 | Completed final sign-off Sep 2021 | 20 Broadmoor Dr | bathroom remodel, replace all plumbing and eclectrical fixtures. new tile and cabinetsDetails
bathroom remodel, replace all plumbing and eclectrical fixtures. new tile and cabinets | $20,000 |
| Sep 11, 2020 | Completed final sign-off Oct 2022 | 115 Jordan Av | basement: gym converted to laundry, relocation/replacement of stairs to 1/f, 2/f relocation of bathroom, replacing laundry room, relocation of master suite & bath. revision to bpa#201912300867Details
basement: gym converted to laundry, relocation/replacement of stairs to 1/f, 2/f relocation of bathroom, replacing laundry room, relocation of master suite & bath. revision to bpa#201912300867 | $30,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2022 | 115 Jordan Av | basement -remodel (e) space & small rear addition, (n) bathroom, (n) guest room, convert part of space to garage. 1st flr -kitchen remodel, relocate powder room. 2nd flr -remodel at baths & bedrooms, (n) mech, (n) electrical and plumbing systems. ref. pa# 20200111865.Details
basement -remodel (e) space & small rear addition, (n) bathroom, (n) guest room, convert part of space to garage. 1st flr -kitchen remodel, relocate powder room. 2nd flr -remodel at baths & bedrooms, (n) mech, (n) electrical and plumbing systems. ref. pa# 20200111865. | $380,000 |
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 9 Burlwood Dr | remodel of kitchen and bathroom, no exterior work no structural workDetails
remodel of kitchen and bathroom, no exterior work no structural work | $40,000 |
| May 29, 2019 | Completed final sign-off Feb 2020 | 3835 Ulloa St | renew bathroom area - add vanity & wc - 2 full bathrooms. remodel kitchen. (no change to rough plumbing). no change to exterior envelope/front/public right of way. repair roof in kind above entry. demo fire place.Details
renew bathroom area - add vanity & wc - 2 full bathrooms. remodel kitchen. (no change to rough plumbing). no change to exterior envelope/front/public right of way. repair roof in kind above entry. demo fire place. | $20,000 |
| Aug 29, 2018 | Completed final sign-off Dec 2018 | 218 Mallorca Wy | remodel (e) bathroom, no walls moved/removed/added/infilled, all (e) layouts to remain unchanged.Details
remodel (e) bathroom, no walls moved/removed/added/infilled, all (e) layouts to remain unchanged. | $20,000 |
| Jun 15, 2018 | Completed final sign-off Oct 2018 | 63 Mullen Av | remodel (2) existing bathrooms in-kind. install new fixtures and tilesDetails
remodel (2) existing bathrooms in-kind. install new fixtures and tiles | $25,000 |
| May 4, 2018 | Completed final sign-off Jun 2018 | 1911 42nd Av | remodel existing bathroom. no change to wall locationsDetails
remodel existing bathroom. no change to wall locations | $20,000 |
| Mar 21, 2018 | Completed final sign-off May 2018 | 20 Broadmoor Dr | remodel of (e) 1 bathroom replace all bathroom fixtures, no alteration of (e) wallDetails
remodel of (e) 1 bathroom replace all bathroom fixtures, no alteration of (e) wall | $20,000 |
| Dec 11, 2017 | Never finaled issued Apr 2018, no final | 420 Kirkham St | remodel (e) bathroom at 1st level. replacement of (e) skylights at storage. no change to building envelope and siteDetails
remodel (e) bathroom at 1st level. replacement of (e) skylights at storage. no change to building envelope and site | $17,000 |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 115 Jordan Av | remodel (1) full bathroom as is. replace all fixts. upgrade plumbing & electrical as needed. retile & paint.Details
remodel (1) full bathroom as is. replace all fixts. upgrade plumbing & electrical as needed. retile & paint. | $20,000 |
| Jun 28, 2017 | Completed final sign-off Aug 2020 | 1506 07th Av | rear yard addition. remodel interior. room down addition. no change to building use. (5) bedroom, 3 1/2 bath. note: shoring and geo grout under a separate permit.Details
rear yard addition. remodel interior. room down addition. no change to building use. (5) bedroom, 3 1/2 bath. note: shoring and geo grout under a separate permit. | $400,000 |
| Mar 1, 2017 | Completed final sign-off Jun 2017 | 100 Moncada Wy | remodel of two second story bathrooms. no change of layout.Details
remodel of two second story bathrooms. no change of layout. | $45,000 |