Permit GraphShortlistSan Francisco building permits since 2000

Cameron Builders Sf

Contractor license
1100326
State license record
Based in
San Francisco
On San Francisco permits
Nov 2021 to Mar 2026
Last 24 months
11 permits filed

24 permits since 2000: 10 completed, 12 in progress, 2 never finaled.

Of the 2 never-finaled permits, 2 are 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 3Stairs 9Kitchen remodel 9Bathroom remodel 11

9 stairs permits: 4 completed, 4 in progress, 1 never finaled. Typically 97 days from filing to permit and 726 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 16, 2025In progress
issued Mar 2026
248 04th Avremove and replace rear runpout, deck and stairs. remodel bath at top floor unit, remodel kitchen at top floor unit.
Details
Permit
202512161856
Status
issued
Filed
Dec 16, 2025
Permit issued
Mar 23, 2026
Declared cost
$160,000
Address
248 04th Av

remove and replace rear runpout, deck and stairs. remodel bath at top floor unit, remodel kitchen at top floor unit.

Open the permit page

$160,000
Oct 29, 2025In progress
issued May 2026
55 Rosewood Drhorizontal addition @ front, replace all stucco, replace all windows and exterior doors, 2 new skylights, new roof, remove (e) hvac flues & chimney, new hvac, level floor in basement, new footings, slab & waterproofing @ basement, rebuild interior stair & stair railings, new flooring, remodel kitche
Details
Permit
202502200721
Status
issued
Filed
Oct 29, 2025
Permit issued
May 5, 2026
Declared cost
$1,600,000
Address
55 Rosewood Dr

horizontal addition @ front, replace all stucco, replace all windows and exterior doors, 2 new skylights, new roof, remove (e) hvac flues & chimney, new hvac, level floor in basement, new footings, slab & waterproofing @ basement, rebuild interior stair & stair railings, new flooring, remodel kitche

Open the permit page

$1,600,000
Jul 13, 2025In progress
issued Feb 2026
614 Elizabeth Strevision to pa# 202408269419, 1/f- new driveway and new garage door. 4/f- upgrades include a new bathroom, new bedroom, new playroom and a new stair from level 3 to 4. and new penthouse to allow for code min headroom at stair. new forced air heating throughout to replace radiant.
Details
Permit
202505297456
Status
issued
Filed
Jul 13, 2025
Permit issued
Feb 3, 2026
Declared cost
$155,100
Address
614 Elizabeth St

revision to pa# 202408269419, 1/f- new driveway and new garage door. 4/f- upgrades include a new bathroom, new bedroom, new playroom and a new stair from level 3 to 4. and new penthouse to allow for code min headroom at stair. new forced air heating throughout to replace radiant.

Open the permit page

$155,100
May 22, 2024Completed
final sign-off Feb 2025
306 Rutledge Stinterioer renovation of 2 bedrooms and 2 bathrooms. revision of rear deck and stairs. no work visible from the street.
Details
Permit
202405222646
Status
complete
Filed
May 22, 2024
Permit issued
May 31, 2024
Final sign-off
Feb 13, 2025
Declared cost
$150,000
Address
306 Rutledge St

interioer renovation of 2 bedrooms and 2 bathrooms. revision of rear deck and stairs. no work visible from the street.

Open the permit page

$150,000
Dec 5, 2023Completed
final sign-off Jun 2025
712 10th Avexterior: rebuild front porch and stairs.two inch wider patio and two more steps. interior: minor reviison to pa 202111051910 3rd floor bathroom master closet. plumbing fixtures stay the same.
Details
Permit
202312051978
Status
complete
Filed
Dec 5, 2023
Permit issued
Dec 12, 2023
Final sign-off
Jun 27, 2025
Declared cost
$25,000
Address
712 10th Av

exterior: rebuild front porch and stairs.two inch wider patio and two more steps. interior: minor reviison to pa 202111051910 3rd floor bathroom master closet. plumbing fixtures stay the same.

Open the permit page

$25,000
Nov 9, 2023In progress
issued Jan 2024
3666 Baker Strevision to 202305037030 (no plan): remodel kitchen & 3 bathrooms. replace exterior doors at non st facing, replace (e) 1-story deck & stair in-kind within buildbale area. replace (e) cemeent plaster at all exterior walls. repair damaged front 1-story detached garage
Details
Permit
202311090533
Status
issued
Filed
Nov 9, 2023
Permit issued
Jan 8, 2024
Declared cost
$100,000
Address
3666 Baker St

revision to 202305037030 (no plan): remodel kitchen & 3 bathrooms. replace exterior doors at non st facing, replace (e) 1-story deck & stair in-kind within buildbale area. replace (e) cemeent plaster at all exterior walls. repair damaged front 1-story detached garage

Open the permit page

$100,000
Jun 13, 2023Never finaled
issued Jun 2023, no final
3666 Baker Stto comply with nov# 202287505. dry rot repair at 2 windows. replace 2 custom non-rated sashs only (x2). repair framing & window (x2) south facing above entry stairs (3rd window).
Details
Permit
202306139963
Status
issued
Filed
Jun 13, 2023
Permit issued
Jun 13, 2023
Declared cost
$10,000
Address
3666 Baker St

to comply with nov# 202287505. dry rot repair at 2 windows. replace 2 custom non-rated sashs only (x2). repair framing & window (x2) south facing above entry stairs (3rd window).

Open the permit page

$10,000
Nov 5, 2021Completed
final sign-off Jun 2025
712 10th Av1st fl. develope habitable space at rear, with bath, bedroom and family room, 2nd fl. relocate kitche, add (n) bath and (n) interior stairs to 1st fl. 3rd. fl. upgrade kitchen, relocate bath, (n) master bath
Details
Permit
202111051910
Status
complete
Filed
Nov 5, 2021
Permit issued
Aug 4, 2022
Final sign-off
Jun 27, 2025
Declared cost
$450,000
Address
712 10th Av

1st fl. develope habitable space at rear, with bath, bedroom and family room, 2nd fl. relocate kitche, add (n) bath and (n) interior stairs to 1st fl. 3rd. fl. upgrade kitchen, relocate bath, (n) master bath

Open the permit page

$450,000
Nov 1, 2021Completed
final sign-off Feb 2025
527 Alvarado Staddition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping.
Details
Permit
202111011515
Status
complete
Filed
Nov 1, 2021
Permit issued
Sep 12, 2022
Final sign-off
Feb 18, 2025
Declared cost
$500,000
Address
527 Alvarado St

addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping.

Open the permit page

$500,000