Back to kitchen remodel contractors
Cameron Builders Sf
- Based in
- San Francisco
- On San Francisco permits
- Nov 2021 to Mar 2026
- Last 24 months
- 11 permits filed
24 permits since 2000: 10 completed, 12 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
9 kitchen remodel permits: 3 completed, 5 in progress, 1 never finaled. Typically 97 days from filing to permit and 890 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2025 | In progress issued Mar 2026 | 248 04th Av | remove and replace rear runpout, deck and stairs. remodel bath at top floor unit, remodel kitchen at top floor unit.Details
remove and replace rear runpout, deck and stairs. remodel bath at top floor unit, remodel kitchen at top floor unit. | $160,000 |
| Jun 6, 2025 | In progress issued Jul 2025 | 1632 Hayes St | interior renovation of (e) kitchen,laundry & house bath:addition of primary bath en suite within (e)interior floor plan,mechanical system replacement: new air handler and heat pump, new waterheater; new electrical fixtures and devices in areas of work. new plumbing fixtures at area of work.Details
interior renovation of (e) kitchen,laundry & house bath:addition of primary bath en suite within (e)interior floor plan,mechanical system replacement: new air handler and heat pump, new waterheater; new electrical fixtures and devices in areas of work. new plumbing fixtures at area of work. | $74,900 |
| Oct 4, 2024 | In progress issued Apr 2025 | 614 Elizabeth St | convert 1st fl storage to new foundations, bathroom, bedroom, & family room. 2nd fl- relocate kitchen & bath. revise interior partitions & structural upgrades. 3rd fl- relocate bath. add new bath. revise interior partitions & structural upgrades. new windows at rear. new radiant heating throughtout.Details
convert 1st fl storage to new foundations, bathroom, bedroom, & family room. 2nd fl- relocate kitchen & bath. revise interior partitions & structural upgrades. 3rd fl- relocate bath. add new bath. revise interior partitions & structural upgrades. new windows at rear. new radiant heating throughtout. | $921,596 |
| Mar 22, 2024 | In progress issued Oct 2024 | 3666 Baker St | revision to pa#202305037030. revise basement layout and add rooms down, add kitchenette with 2 burner cooktop (no oven) add windows on non-street facing facade, replace footing at rear and side.Details
revision to pa#202305037030. revise basement layout and add rooms down, add kitchenette with 2 burner cooktop (no oven) add windows on non-street facing facade, replace footing at rear and side. | $125,000 |
| Jan 9, 2024 | Completed final sign-off May 2025 | 4027 23rd St | interior remodel of kitchen and bath add bath. removal of wall between kitchen and dining.Details
interior remodel of kitchen and bath add bath. removal of wall between kitchen and dining. | $150,000 |
| Nov 9, 2023 | In progress issued Jan 2024 | 3666 Baker St | revision to 202305037030 (no plan): remodel kitchen & 3 bathrooms. replace exterior doors at non st facing, replace (e) 1-story deck & stair in-kind within buildbale area. replace (e) cemeent plaster at all exterior walls. repair damaged front 1-story detached garageDetails
revision to 202305037030 (no plan): remodel kitchen & 3 bathrooms. replace exterior doors at non st facing, replace (e) 1-story deck & stair in-kind within buildbale area. replace (e) cemeent plaster at all exterior walls. repair damaged front 1-story detached garage | $100,000 |
| May 3, 2023 | Never finaled issued May 2023, no final | 3666 Baker St | remodel kitchen replace in kind. remodel bathroom replace in kind. new floors in kind. remove boiler and heating system replace inkind. remodel 2 bathrooms on 3rd floor .fix repair wall in garage (inkind) to comply with nov #202182607Details
remodel kitchen replace in kind. remodel bathroom replace in kind. new floors in kind. remove boiler and heating system replace inkind. remodel 2 bathrooms on 3rd floor .fix repair wall in garage (inkind) to comply with nov #202182607 | $400,000 |
| Nov 5, 2021 | Completed final sign-off Jun 2025 | 712 10th Av | 1st fl. develope habitable space at rear, with bath, bedroom and family room, 2nd fl. relocate kitche, add (n) bath and (n) interior stairs to 1st fl. 3rd. fl. upgrade kitchen, relocate bath, (n) master bathDetails
1st fl. develope habitable space at rear, with bath, bedroom and family room, 2nd fl. relocate kitche, add (n) bath and (n) interior stairs to 1st fl. 3rd. fl. upgrade kitchen, relocate bath, (n) master bath | $450,000 |
| Nov 1, 2021 | Completed final sign-off Feb 2025 | 527 Alvarado St | addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping.Details
addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping. | $500,000 |