Back to bathroom remodel contractors
Cameron Builders Sf
- Based in
- San Francisco
- On San Francisco permits
- Nov 2021 to Mar 2026
- Last 24 months
- 11 permits filed
24 permits since 2000: 10 completed, 12 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 5 completed, 5 in progress, 1 never finaled. Typically 60 days from filing to permit and 563 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2025 | In progress issued Mar 2026 | 248 04th Av | remove and replace rear runpout, deck and stairs. remodel bath at top floor unit, remodel kitchen at top floor unit.Details
remove and replace rear runpout, deck and stairs. remodel bath at top floor unit, remodel kitchen at top floor unit. | $160,000 |
| Jul 13, 2025 | In progress issued Feb 2026 | 614 Elizabeth St | revision to pa# 202408269419, 1/f- new driveway and new garage door. 4/f- upgrades include a new bathroom, new bedroom, new playroom and a new stair from level 3 to 4. and new penthouse to allow for code min headroom at stair. new forced air heating throughout to replace radiant.Details
revision to pa# 202408269419, 1/f- new driveway and new garage door. 4/f- upgrades include a new bathroom, new bedroom, new playroom and a new stair from level 3 to 4. and new penthouse to allow for code min headroom at stair. new forced air heating throughout to replace radiant. | $155,100 |
| Jun 6, 2025 | In progress issued Jul 2025 | 1632 Hayes St | interior renovation of (e) kitchen,laundry & house bath:addition of primary bath en suite within (e)interior floor plan,mechanical system replacement: new air handler and heat pump, new waterheater; new electrical fixtures and devices in areas of work. new plumbing fixtures at area of work.Details
interior renovation of (e) kitchen,laundry & house bath:addition of primary bath en suite within (e)interior floor plan,mechanical system replacement: new air handler and heat pump, new waterheater; new electrical fixtures and devices in areas of work. new plumbing fixtures at area of work. | $74,900 |
| Oct 4, 2024 | In progress issued Apr 2025 | 614 Elizabeth St | convert 1st fl storage to new foundations, bathroom, bedroom, & family room. 2nd fl- relocate kitchen & bath. revise interior partitions & structural upgrades. 3rd fl- relocate bath. add new bath. revise interior partitions & structural upgrades. new windows at rear. new radiant heating throughtout.Details
convert 1st fl storage to new foundations, bathroom, bedroom, & family room. 2nd fl- relocate kitchen & bath. revise interior partitions & structural upgrades. 3rd fl- relocate bath. add new bath. revise interior partitions & structural upgrades. new windows at rear. new radiant heating throughtout. | $921,596 |
| May 22, 2024 | Completed final sign-off Feb 2025 | 306 Rutledge St | interioer renovation of 2 bedrooms and 2 bathrooms. revision of rear deck and stairs. no work visible from the street.Details
interioer renovation of 2 bedrooms and 2 bathrooms. revision of rear deck and stairs. no work visible from the street. | $150,000 |
| Jan 9, 2024 | Completed final sign-off May 2025 | 4027 23rd St | interior remodel of kitchen and bath add bath. removal of wall between kitchen and dining.Details
interior remodel of kitchen and bath add bath. removal of wall between kitchen and dining. | $150,000 |
| Dec 5, 2023 | Completed final sign-off Jun 2025 | 712 10th Av | exterior: rebuild front porch and stairs.two inch wider patio and two more steps. interior: minor reviison to pa 202111051910 3rd floor bathroom master closet. plumbing fixtures stay the same.Details
exterior: rebuild front porch and stairs.two inch wider patio and two more steps. interior: minor reviison to pa 202111051910 3rd floor bathroom master closet. plumbing fixtures stay the same. | $25,000 |
| Nov 9, 2023 | In progress issued Jan 2024 | 3666 Baker St | revision to 202305037030 (no plan): remodel kitchen & 3 bathrooms. replace exterior doors at non st facing, replace (e) 1-story deck & stair in-kind within buildbale area. replace (e) cemeent plaster at all exterior walls. repair damaged front 1-story detached garageDetails
revision to 202305037030 (no plan): remodel kitchen & 3 bathrooms. replace exterior doors at non st facing, replace (e) 1-story deck & stair in-kind within buildbale area. replace (e) cemeent plaster at all exterior walls. repair damaged front 1-story detached garage | $100,000 |
| May 3, 2023 | Never finaled issued May 2023, no final | 3666 Baker St | remodel kitchen replace in kind. remodel bathroom replace in kind. new floors in kind. remove boiler and heating system replace inkind. remodel 2 bathrooms on 3rd floor .fix repair wall in garage (inkind) to comply with nov #202182607Details
remodel kitchen replace in kind. remodel bathroom replace in kind. new floors in kind. remove boiler and heating system replace inkind. remodel 2 bathrooms on 3rd floor .fix repair wall in garage (inkind) to comply with nov #202182607 | $400,000 |
| Nov 5, 2021 | Completed final sign-off Jun 2025 | 712 10th Av | 1st fl. develope habitable space at rear, with bath, bedroom and family room, 2nd fl. relocate kitche, add (n) bath and (n) interior stairs to 1st fl. 3rd. fl. upgrade kitchen, relocate bath, (n) master bathDetails
1st fl. develope habitable space at rear, with bath, bedroom and family room, 2nd fl. relocate kitche, add (n) bath and (n) interior stairs to 1st fl. 3rd. fl. upgrade kitchen, relocate bath, (n) master bath | $450,000 |
| Nov 1, 2021 | Completed final sign-off Feb 2025 | 527 Alvarado St | addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping.Details
addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping. | $500,000 |