Back to kitchen remodel contractors
Camarina Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Jan 2026
- Last 24 months
- 4 permits filed
68 permits since 2000: 58 completed, 2 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 16 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 1450 Washington St | unit #7: renovate kitchen & bathroom in kind. plumbing and electrical as needed. no shower panDetails
unit #7: renovate kitchen & bathroom in kind. plumbing and electrical as needed. no shower pan | $45,000 |
| Jan 7, 2026 | In progress issued Jan 2026 | 2525 22nd Av | revision to pa #202506259388: new wall to align with existing wall at s.w. corner, part of horizontal expansion/change walls at interior stair to kitchen/new slider patio door at n-w patio/change windows 0034 004 size(smaller) changes in layout of new bath 1 & 2, furnace & water, heater moved intoDetails
revision to pa #202506259388: new wall to align with existing wall at s.w. corner, part of horizontal expansion/change walls at interior stair to kitchen/new slider patio door at n-w patio/change windows 0034 004 size(smaller) changes in layout of new bath 1 & 2, furnace & water, heater moved into | |
| Apr 8, 2025 | Completed final sign-off Nov 2025 | 1550 Hayes St | unit 3- remodel kitchen and bathroom reconfigure bath and kitchen non bearing walls and add closet in bedroom. update electrical and plumbingDetails
unit 3- remodel kitchen and bathroom reconfigure bath and kitchen non bearing walls and add closet in bedroom. update electrical and plumbing | $40,000 |
| Feb 28, 2022 | Completed final sign-off Jul 2022 | 1550 Hayes St | unit 8: remodel kitchen and bath. replace in kind.Details
unit 8: remodel kitchen and bath. replace in kind. | $25,000 |
| Feb 13, 2020 | Completed final sign-off Apr 2020 | 1456 Jones St | apt 26: remodel bathroom & kitchen in-kind.Details
apt 26: remodel bathroom & kitchen in-kind. | $25,000 |
| Mar 6, 2018 | Completed final sign-off Sep 2018 | 1183 Jackson St | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $25,000 |
| Feb 2, 2018 | Completed final sign-off Sep 2018 | 1550 Hayes St | apt #6: remodel kitchen and bathroom.Details
apt #6: remodel kitchen and bathroom. | $25,000 |
| Dec 7, 2017 | Completed final sign-off Mar 2018 | 1456 Jones St | #1 -remodel kitchen & bathroom. maher naDetails
#1 -remodel kitchen & bathroom. maher na | $15,000 |
| Apr 16, 2014 | Completed final sign-off Jun 2014 | 1456 Jones St | unit 33: remodel kitchen - replace cabinetes & wall surfaces, new appliances and connections. all new lighting small comply w/cec/50/<. compliance with ordinance no 155-13 not required.Details
unit 33: remodel kitchen - replace cabinetes & wall surfaces, new appliances and connections. all new lighting small comply w/cec/50/<. compliance with ordinance no 155-13 not required. | $5,000 |
| Feb 18, 2014 | Completed final sign-off May 2014 | 1474 33rd Av | remodel kitchen per plans on 2nd floor.Details
remodel kitchen per plans on 2nd floor. | $20,000 |
| Jun 6, 2013 | Completed final sign-off Feb 2014 | 2170 Vallejo St | unit #202: kitchen renovation, new lighting to be over 50% high efficacy, widen opening at (e) non bearing wall. replace 1 sideyard window with new aluminum clad window in (e) openingDetails
unit #202: kitchen renovation, new lighting to be over 50% high efficacy, widen opening at (e) non bearing wall. replace 1 sideyard window with new aluminum clad window in (e) opening | $9,100 |
| Apr 15, 2013 | Completed final sign-off Jun 2013 | 345 Green St | remodel kitchen & bathroom in kind. repair dryrot in bathrooms. 345 green st., unit 3 & 347 green st., unit 1. lighting must comply w/cec 150 (k).Details
remodel kitchen & bathroom in kind. repair dryrot in bathrooms. 345 green st., unit 3 & 347 green st., unit 1. lighting must comply w/cec 150 (k). | $30,000 |
| Sep 26, 2011 | Completed final sign-off Nov 2011 | 1440 Washington St | unit #3. remodel kitchen & bathroom. comply his 201159168. no doors, windows, walls under this permit. comply w/ co alarms per cbc 2010 section 420.4Details
unit #3. remodel kitchen & bathroom. comply his 201159168. no doors, windows, walls under this permit. comply w/ co alarms per cbc 2010 section 420.4 | $20,000 |
| Feb 19, 2008 | Completed final sign-off Aug 2008 | 405 Country Club Dr | replace kitchen cabinets, floor and fixturesDetails
replace kitchen cabinets, floor and fixtures | $15,000 |
| Dec 23, 2004 | Completed final sign-off Jan 2006 | 2170 Vallejo St | remodel kitchen & two baths, install new closet doors, upgrade elect panel & install new lights & plDetails
remodel kitchen & two baths, install new closet doors, upgrade elect panel & install new lights & pl | $45,000 |
| Nov 17, 2004 | Never finaled issued Nov 2004, no final | 405 Country Club Dr | replace 5 windows on side of building- two bedrms, two bathrms, & one kitchen, min 3'-0" from prop lDetails
replace 5 windows on side of building- two bedrms, two bathrms, & one kitchen, min 3'-0" from prop l | $1,750 |
| Sep 20, 2004 | Completed final sign-off Apr 2005 | 2170 Vallejo St | remodel kitchen as needed, countertop,stove. remove non bearing wall btwn kitchen/dining area. relocDetails
remodel kitchen as needed, countertop,stove. remove non bearing wall btwn kitchen/dining area. reloc | $20,000 |
| Nov 21, 2002 | Completed final sign-off Apr 2003 | 1520 Larkin St | remodel 2 bathrooms & kitchen & repair dryrot as necessary.Details
remodel 2 bathrooms & kitchen & repair dryrot as necessary. | $12,000 |